Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20196C349 | 16 June 1999 | Application for Amend to License R-67,deleting License Conditions 3 & 4 Which Duplicate Requirements Now in Proposed TS | |
ML20196D379 | 15 June 1999 | Application for Amends to Licenses R-38 & R-67,to Revise Proposed TS & Request Deletion of License Condition 2.B.(2). Mark-up of Previously Submitted strike-out Version of TS Showing Latest Changes Made | |
ML20236Q575 | 16 July 1998 | Application for Amend to License R-67,revising Section 8.0 of Mark F Triga TS to Be Consistent W/Mark I Reactor TS | |
ML20198H450 | 15 September 1997 | Application for Amend to License R-38,changing TS 5.2.5 to Read as Listed | |
ML20140D492 | 18 April 1997 | Application for Amends to Licenses R-38 & R-67,terminating Triga Reactor Operations at Main Site in San Diego,Ca & Requesting Possession Only License for Ga Mark I Reactor License.Decommissioning Plan Encl | |
ML20132F197 | 17 December 1996 | Application for Amend to License R-38,withdrawing Authorization to Operate Triga Mark I non-power Reactor | |
ML20059G289 | 7 January 1994 | Application for Amend to License R-38,revising Paragraph (a) of Section 9.4 of TS to Reflect Elimination of Position of Associate Physicist-in-Charge,as Result of Reduced Funding/ Utilization of Triga Reactors | |
ML20148H990 | 25 March 1988 | Application for Amends to Licenses R-38 & R-67,changing Name of Licensee.Fee Paid | |
ML20237D825 | 22 December 1987 | Application for Amend to License R-67,revising Tech Specs to Add Activated Charcoal Filter When Testing Thermionic Devices in Core Whenever Distance to Nearest Site Boundary Is Less than 350 Meters.Safety Analysis Encl.Fee Paid | |
ML20210A313 | 30 April 1987 | Application for Amend to License R-67,revising Tech Specs to Extend Irradiation Time for Direct Conversion Devices to Beyond 20,000 H for Uninterrupted Continuation of DOE Research Program on Thermonic Devices.Safety Analysis Encl | High Radiation Area |
ML20212D348 | 26 February 1987 | Application for Amends to Licenses R-38 & R-67,eliminating Inconsistency Between Max Licensed Power & Testing of Power Scrams at 110% of Licensed Power | |
ML20213G698 | 14 November 1986 | Application for Amend to License R-67,revising Tech Spec Section 10.2.6 to Permit Simultaneous Irradiation of Up to Four Thermionic Devices.Fee Paid | |
ML20205Q175 | 20 May 1986 | Application for Amend to License R-67,defining Triga Low Enriched U Fuels as Std Fuel & Permitting Continued Tests Under Special Fuel Provisions for Fuel W/U Loadings in Range from 30% to 45% Weight | |
ML20205J251 | 28 January 1986 | Resubmits Application for Amend to License R-67,changing Tech Spec Section 10.2.6 (D) to Allow Uninterrupted Continuation of Thermionic Experiment Now in Progress & to Extend Irradiation Time to 20,000 H | |
ML20137K406 | 26 November 1985 | Application for Amend to License R-67,changing Tech Specs to Allow Uninterrupted Continuation of Thermionic (Direct Conversion Device) Experiment in Progress.Fee Paid | |
ML20132G814 | 24 September 1985 | Revised Application for Amend to License R-67,amending Tech Spec 10.2.6(f)(2) to Clarify Justification & Discussion in 850826 Application,Authorizing Routine Calibr or Maint of Radiation Monitors During Extended Operations | |
ML20134M477 | 26 August 1985 | Application for Amend to License R-67,changing Tech Specs Re Performance of Routine Calibr or Maint on Radiation Monitors,Including Continuous Air Monitor,During Extended Operations.Fee Paid | |
ML20134C553 | 12 August 1985 | Application for Amend to License R-67,revising Tech Specs to Authorize Performance of Routine Calibr or Maint on Radiation Monitors During Extended Operations.Fee Paid | |
ML20129J415 | 4 June 1985 | Application to Amend License R-67,revising Tech Spec Section 6.2.5 to Perform Calibr of Power Channels by Calorimetric or Heat Balance Methods Semiannually.Fee Paid | |
ML20054L917 | 23 June 1982 | Application for Amend of Licenses R-38 & R-67 to Reflect Change of Ownership from Ga Co to Ga Technologies,Inc. One Oversize Preliminary Parcel Map Encl.Aperture Card Is Available in PDR |