Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20056B07631 July 1990Welding and Nondestructive Examination Issues at Seabrook Nuclear Station.An Independent Review Team ReportNondestructive Examination
ML20245B39331 May 1989Safety Evaluation Report Related to the Operation of Seabrook Station, Unit 1.Docket No. 50-443.(Public Service Company of New Hampshire)Shutdown Margin
Offsite Dose Calculation Manual
Systematic Assessment of Licensee Performance
Cold shutdown justification
Backfit
ML20245B33131 May 1989Technical Specifications for Seabrook Station, Unit 1. Appendix a to License No. NPF-67.Docket No. 50-443.(Public Service Company of New Hampshire)
ML20206B24531 March 1987a Review of the Seabrook Station Probabilistic Safety Assessment.Containment Failure Modes and Radiological Source TermsSafe Shutdown
Probabilistic Risk Assessment
Earthquake
ML20215N50331 October 1986Technical Specifications for Seabrook Station,Unit 1.Docket No. 50-443.(Public Service Company of New Hampshire)
ML20211G77031 October 1986Safety Evaluation Report Related to the Operation of Seabrook Station,Units 1 and 2.Docket Nos. 50-443 and 50-444.(Public Service Company of New Hampshire,Et Al)Safe Shutdown
Boric Acid
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Stroke time
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Fuel cladding
Fire Protection Program
Fire Watch
ML20210K64530 November 1985PRA InsightsSafe Shutdown
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Feedwater Heater
Earthquake
Turbine Missile
Fatality
Failure to Scram
Loss of condenser vacuum
ML20133H90031 July 1985Safety Evaluation Report Related to the Operation of Seabrook Station,Units 1 and 2.Docket Nos. 50-443 and 50-444.(Public Service Company of New Hampshire,Et Al)Safe Shutdown
Grab sample
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Nondestructive Examination
VT-2
New Project Manager
Incorporated by reference
Tornado Missile Protection
Process Control Program
Stress corrosion cracking
Exemption Request
Earthquake
Control of Heavy Loads
Fire Protection Program
Thermal fatigue
Negative Flux Rate Trip
ML20080M43529 February 1984Review of Seabrook Units 1 and 2 Auxiliary Feedwater System Reliability AnalysisSafe Shutdown
Mission time
Feedwater Heater
Earthquake
Overspeed trip
Manual Operator Action
ML20069N64730 November 1982an Independent Assessment of Evaluation Time Estimates for a Peak Population Scenario in the Emergency Planning Zone of the Seabrook Power Station