 Issue dateTitleTopic
ML24029A17430 January 2024Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion
ML23341A1527 December 2023December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee SlidesLarge early release frequency
Exemption Request
ML23317A07114 November 2023NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides)
ML23255A10411 August 2023Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout
ML22311A5117 November 2022Pool Swell License - Amendment Request
ML22251A23514 September 2022Presentation Slides for September 14, 2022, Observation Public Meeting
ML22153A3846 June 2022Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 CloseoutCoatings
ML22091A1331 April 2022Bru Har Combined 2021 Assessment Meeting SlidesCondition Adverse to Quality
Coronavirus
ML21314A44710 November 2021Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection IntervalMoisture barrier
ML21194A15813 July 2021and Lasalle Nuclear Generating Stations 2020 Annual Assessment Meeting SlidesCoronavirus
ML21141A01021 May 2021La Salle County Station, Units 1 and 2, May 27, 2021 Pre Submission Public Meeting Slides (EPID-L-2021-LRM-0052)
ML20261G73216 September 2020Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55aIncorporated by reference
Exemption Request
ML20238B86625 August 2020Hq Online EOC SlidesCOVID-19
ML20178A42030 June 2020NEI Slides for June 30, 2020, Public Meeting on COVID-19 ResponseExemption Request
Pandemic
Coronavirus
ML20170B02123 June 2020NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) InspectionsBoric Acid
Weld Overlay
Nondestructive Examination
Pandemic
Coronavirus
COVID-19
Pressure Boundary Leakage
ML20169A55916 June 2020Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1)Pandemic
Coronavirus
ML20163A65516 June 20206-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator InspectionsPandemic
Coronavirus
ML20100G6349 April 2020Revised- Bru 2019 Annual Assessment Meeting SlidesCOVID-19
ML19318F95120 November 2019Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit FrequencyGrace period
ML19318F29118 November 2019Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief RequestFinite Element Analysis
Stress corrosion cracking
ML19214A0567 August 2019Presentation: Duke Energy Presubmittal Meeting - August 7, 2019
ML19161A2574 June 2019BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19151A66031 May 2019BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19077A36714 March 2019March 14, 2019 Pre-submittal Meeting TS DNBR Safety Limit Change LAR Meeting SlidesAnticipated operational occurrence
ML19022A20023 January 2019Request for Use of ASME Code Case N-879 for Exelon Nuclear Power PlantsLoop seal
ML18351A13420 December 2018December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LARProbabilistic Risk Assessment
Fire impairment
Maintenance Rule Program
ML18347B31419 December 2018Bwrvip/Asme Relief Request Discussion December 19, 2018
ML18334A21630 November 2018Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018GOTHIC
ML18319A12719 November 2018Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation AreasHigh Radiation Area
Deep Dose Equivalent
ML18333A1828 November 2018Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan RevisionSiren
ML18054B35927 February 2018Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli
ML17331A62729 November 2017Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69High winds
ML17250B23830 August 2017TMRE Presubmittal NRCSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Incorporated by reference
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Tornado Missile Risk Evaluator
Earthquake
ML17142A23825 May 2017OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner BurnsProbabilistic Risk Assessment
Operator Manual Action
FLEX
Significance Determination Process
ML17044A0892 March 2017EDG SR Presubmittal Meeting March 2, 2017Safe Shutdown
Stroke time
ML16267A02929 September 2016SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant
ML16194A00612 July 2016Pre-Application Meeting Presentation Regarding LaSalle County Station License Amendment Request for Revision of Suppression Pool Swell Design Analysis
ML16112A2932 May 201605/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444)
ML16077A15622 March 2016Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards
ML16077A34917 March 2016NRC Briefing Slides for LaSalle Dseis Public Meeting March 22, 2016Environmental Justice
ML16075A32916 March 2016OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for OperationsAnticipated operational occurrence
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Open Phase Condition
Risk-Informed Steering Committee
Fuel cladding
Generic Issues Program
Backfit
RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)18 September 2015Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)Affidavit
ML15062A3643 March 2015Environmental Scoping Briefing for March 10th MeetingsAging Management
Environmental Justice
ML15058A63227 February 2015LSCS Scoping Briefing Prepared 2-27-15 for March 10th MeetingAging Management
Environmental Justice
ML14129A3359 May 2014Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant
ML13312A9888 November 2013Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications
ML13308A0071 November 2013Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection.
ML13212A33731 July 2013NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting
NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting31 July 2013NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting
NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-0130 July 20137/31/2013 NRC Public Meeting Presentation on NEI 01-01