Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML23341A152 | 7 December 2023 | December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides | Large early release frequency Exemption Request |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
ML22311A511 | 7 November 2022 | Pool Swell License - Amendment Request | |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22153A384 | 6 June 2022 | Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout | Coatings |
ML22091A133 | 1 April 2022 | Bru Har Combined 2021 Assessment Meeting Slides | Condition Adverse to Quality Coronavirus |
ML21314A447 | 10 November 2021 | Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval | Moisture barrier |
ML21194A158 | 13 July 2021 | and Lasalle Nuclear Generating Stations 2020 Annual Assessment Meeting Slides | Coronavirus |
ML21141A010 | 21 May 2021 | La Salle County Station, Units 1 and 2, May 27, 2021 Pre Submission Public Meeting Slides (EPID-L-2021-LRM-0052) | |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a | Incorporated by reference Exemption Request |
ML20238B866 | 25 August 2020 | Hq Online EOC Slides | COVID-19 |
ML20178A420 | 30 June 2020 | NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response | Exemption Request Pandemic Coronavirus |
ML20170B021 | 23 June 2020 | NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections | Boric Acid Weld Overlay Nondestructive Examination Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20169A559 | 16 June 2020 | Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) | Pandemic Coronavirus |
ML20163A655 | 16 June 2020 | 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections | Pandemic Coronavirus |
ML20100G634 | 9 April 2020 | Revised- Bru 2019 Annual Assessment Meeting Slides | COVID-19 |
ML19318F951 | 20 November 2019 | Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency | Grace period |
ML19318F291 | 18 November 2019 | Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request | Finite Element Analysis Stress corrosion cracking |
ML19214A056 | 7 August 2019 | Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 | |
ML19161A257 | 4 June 2019 | BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19151A660 | 31 May 2019 | BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19077A367 | 14 March 2019 | March 14, 2019 Pre-submittal Meeting TS DNBR Safety Limit Change LAR Meeting Slides | Anticipated operational occurrence |
ML19022A200 | 23 January 2019 | Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants | Loop seal |
ML18351A134 | 20 December 2018 | December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR | Probabilistic Risk Assessment Fire impairment Maintenance Rule Program |
ML18347B314 | 19 December 2018 | Bwrvip/Asme Relief Request Discussion December 19, 2018 | |
ML18334A216 | 30 November 2018 | Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 | GOTHIC |
ML18319A127 | 19 November 2018 | Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas | High Radiation Area Deep Dose Equivalent |
ML18333A182 | 8 November 2018 | Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision | Siren |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
ML17331A627 | 29 November 2017 | Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 | High winds |
ML17250B238 | 30 August 2017 | TMRE Presubmittal NRC | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Incorporated by reference Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Tornado Missile Risk Evaluator Earthquake |
ML17142A238 | 25 May 2017 | OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns | Probabilistic Risk Assessment Operator Manual Action FLEX Significance Determination Process |
ML17044A089 | 2 March 2017 | EDG SR Presubmittal Meeting March 2, 2017 | Safe Shutdown Stroke time |
ML16267A029 | 29 September 2016 | SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant | |
ML16194A006 | 12 July 2016 | Pre-Application Meeting Presentation Regarding LaSalle County Station License Amendment Request for Revision of Suppression Pool Swell Design Analysis | |
ML16112A293 | 2 May 2016 | 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) | |
ML16077A156 | 22 March 2016 | Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards | |
ML16077A349 | 17 March 2016 | NRC Briefing Slides for LaSalle Dseis Public Meeting March 22, 2016 | Environmental Justice |
ML16075A329 | 16 March 2016 | OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations | Anticipated operational occurrence Enforcement Discretion Probabilistic Risk Assessment Significance Determination Process Open Phase Condition Risk-Informed Steering Committee Fuel cladding Generic Issues Program Backfit |
RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) | 18 September 2015 | Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) | Affidavit |
ML15062A364 | 3 March 2015 | Environmental Scoping Briefing for March 10th Meetings | Aging Management Environmental Justice |
ML15058A632 | 27 February 2015 | LSCS Scoping Briefing Prepared 2-27-15 for March 10th Meeting | Aging Management Environmental Justice |
ML14129A335 | 9 May 2014 | Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant | |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
ML13212A337 | 31 July 2013 | NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | |
NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | 31 July 2013 | NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | |
NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 | 30 July 2013 | 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 |