 Issue dateTitleTopic
05000461/LER-2017-0105 February 2018Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram
LER 17-010-00 for Clinton Power Station, Unit 1 Regarding Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram
Unanalyzed Condition
05000461/LER-2017-0094 January 2018Trip of Emergency Reserve Auxiliary Transformer Static VAR Compensator Causes Positive Secondary Containment Pressure Following Voltage Transient on 138 kV Offsite Source.
LER 17-009-00 for Clinton, Unit 1, Regarding Trip of Emergency Reserve Auxiliary Transformer Static VAR Compensator Causes Positive Secondary Containment Pressure Following Voltage Transient on 138 kV Offsite Source
05000461/LER-2017-00528 September 2017Automatic Reactor Scram During the Performance of Scram Time Testing As a Result of an Invalid Oscillation Power Range Monitor Growth Rate Trip
LER 17-005-01 for Clinton, Unit 1 Regarding Automatic Reactor Scram During the Performance of Scram Time Testing As a Result of an Invalid Oscillation Power Range Monitor Growth Rate Trip
05000461/LER-2017-00811 August 2017Division 3 Shutdown Service Water Pump Start Failure
LER 17-008-00 for Clinton, Unit 1 re Division 3 Shutdown Service Water Pump Start Failure
05000461/LER-2017-0079 August 2017Manual Reactor SCRAM due to Loss of Feedwater Heating
LER 17-007-00 for Clinton, Unit 1 re Manual Reactor SCRAM due to Loss of Feedwater Heating
05000461/LER-2017-0061 August 20171 OF 3
LER 17-006-00 for Clinton, Unit 1 re Secondary Containment Inoperable During Mode Change Due to Doors Propped Open
05000461/LER-2017-00410 July 2017Main Steam Isolation Valve Local Leak Rate Test Limit Exceeded During Refueling Outage
LER 17-004-00 For Clinton Power Station, Unit 1 Re: Main Steam Isolation Valve Local Leak Rate Test Limit Exceeded During Refueling Outage
Time of Discovery
05000461/LER-2017-0025 July 2017Failure of the Division 1 Diesel Generator Ventilation Fan Load Sequence Relay Circuit During Concurrent Maintenance of RHR Division 2 Results in an Unanalyzed Condition
LER 17-002-01 for Clinton, Unit 1, Regarding Failure of the Division 1 Diesel Generator Ventilation Fan Load Sequence Relay Circuit During Concurrent Maintenance of RHR Division 2 Results in an Unanalyzed Condition
Unanalyzed Condition
Commercial Grade Dedication
U-604357, Special Report: Inoperable Drywall High Range Gamma Radiation Monitor5 July 2017Special Report: Inoperable Drywall High Range Gamma Radiation MonitorPost Accident Monitoring
05000461/LER-2017-0033 July 2017Implementation of Enforcement Guidance Memorandum (EGM) 11 - 003, Revision 3
LER 17-003-00 for Clinton Power Station, Unit 1 Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3
Water Inventory Control
Preplanned Activity
05000461/LER-2017-00121 April 2017Failure of the 138 kV Offsite Power Source Results in a Loss of Secondary Containment Vacuum
LER 17-001-00 for Clinton, Unit 1, Regarding Failure of the 138 kV Offsite Power Source Results in a Loss of Secondary Containment Vacuum
High winds
05000461/LER-2016-0106 March 20171 OF 3
LER 16-010-01 for Clinton Power Station, Unit 1 RE: Failure to Complete Technical Specification Required Actions within the Completion Time Resulted in a Condition Prohibited by Technical Specifications
Surveillance Frequency Control Program
Grace period
05000461/LER-2016-00922 August 2016Trip of Fuel Building Fans Due to Damper Failure Results in Loss of Secondary Containment
LER 16-009-00 for Clinton Power Station, Unit 1 Regarding Trip of Fuel Building Fans Due to Damper Failure Results in Loss of Secondary Containment
05000461/LER-2016-00715 July 2016Main Steam Line Flexible Hose Intergranular Stress Corrosion Cracking Identified During Refueling Outage
LER 16-007-00 for Clinton Power Station, Unit 1, Regarding Main Steam Line Flexible Hose lntergranular Stress Corrosion Cracking Identified During Refueling Outage
Pressure Boundary Leakage
05000461/LER-2016-00815 July 2016Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3
LER 16-008-00 for Clinton Power Station, Unit 1, Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3
Preplanned Activity
05000461/LER-2016-00610 June 2016Missed Surveillance Results in a Condition Prohibited by Technical Specifications
LER 16-006-00 for Clinton Power Station Unit 1 RE: Missed Surveillance Results in a Condition Prohibited by Technical Specifications
Missed surveillance
Abnormal operational transient
Fuel cladding
05000461/LER-2016-00531 May 2016Insulator Failure On the Reserve Auxiliary Transformer Results In A Loss of Secondary Containment Vacuum
LER 16-005-00 for Clinton Power Station, Unit 1, Regarding Insulator Failure on the Reserve Auxiliary Transformer Results in a Loss of Secondary Containment Vacuum
05000461/LER-2016-00426 May 2016Trip of Emergency Reserve Auxiliary Transformer Static VAR Compensator Causes Positive Secondary Containment Pressure Following Lightning Strike on 138 kV Offsite Source
LER 16-004-00 for Clinton, Unit 1, Regarding Trip of Emergency Reserve Auxiliary Transformer Static VAR Compensator Causes Positive Secondary Containment Pressure Following Lightning Strike on 138 kV Offsite Source
05000461/LER-2016-00323 May 2016Bypassing Both Divisions of Reactor Water Cleanup Leak Detection System is a Reportable Loss of Safety Function
LER 16-003-00 for Clinton Power Station, Unit 1 Regarding Bypassing Both Divisions of Reactor Water Cleanup Leak Detection System is a Reportable Loss of Safety Function
05000461/LER-2016-00213 April 2016Trip of Fuel Building Ventilation Exhaust Fan Due to Moisture Formation Resulting In the Loss of Secondary Containment Vacuum
LER 16-002-00 for Clinton, Unit 1, Regarding Trip of Fuel Building Ventilation Exhaust Fan Due to Moisture Formation Resulting In the Loss of Secondary Containment Vacuum