Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
2CAN012401, U.S. Additional Protocol17 January 2024U.S. Additional Protocol
2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 411 January 2024Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4Safe Shutdown
High winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Large early release frequency
TORMIS
Tornado Missile Risk Evaluator
Maintenance Rule Program
Offsite Circuit
0CAN012401, Registration of Cask Use10 January 2024Registration of Cask Use
1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)14 December 2023Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)Probabilistic Risk Assessment
Power change
Exclusive Use
Affidavit
2CAN112302, Submittal of Amendment 31 to Safety Analysis Report16 November 2023Submittal of Amendment 31 to Safety Analysis ReportAnticipated operational occurrence
Hydrostatic
Temporary Modification
Aging Management
Surveillance Frequency Control Program
Fuel cladding
0CAN102303, Registration of Cask Use24 October 2023Registration of Cask Use
0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 311 October 2023(ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3
0CAN102301, Evacuation Time Estimate (ETE) Study4 October 2023Evacuation Time Estimate (ETE) StudyPandemic
COVID19
Siren
1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 421 September 2023Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4Safe Shutdown
Boric Acid
High winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Tornado Missile Protection
Surveillance Frequency Control Program
Large early release frequency
TORMIS
Tornado Missile Risk Evaluator
Offsite Circuit
0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)14 September 2023Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)
2CAN092301, Reply to a Notice of Violation8 September 2023Reply to a Notice of ViolationCondition Adverse to Quality
0CAN092301, Emergency Plan Implementing Procedure Revision5 September 2023Emergency Plan Implementing Procedure RevisionSafe Shutdown
Boric Acid
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
FLEX
Design basis earthquake
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Unidentified leakage
0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 034117 August 2023Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341
2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)10 August 2023Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)
0CAN072301, Registration of Cask Use18 July 2023Registration of Cask Use
1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation29 June 2023Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation
0CAN062301, Status of Actions to Return to Compliance26 June 2023Status of Actions to Return to ComplianceNon-Destructive Examination
0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis20 June 2023Submittal of Revision 22 of the ANO Fire Hazards Analysis
1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)8 June 2023Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)Probabilistic Risk Assessment
Power change
0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 202224 May 2023Annual 10 CFR 50.46 Report for Calendar Year 2022
0CAN052302, Emergency Plan Rev. 4811 May 2023Emergency Plan Rev. 48Safe Shutdown
Boric Acid
Health Physics Network
Offsite Dose Calculation Manual
B.5.b
Process Control Program
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Pandemic
Fuel cladding
Siren
Exclusive Use
Overexposure
0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20229 May 2023Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Chernobyl
2CAN052301, Cycle 30 Core Operating Limits Report (COLR)3 May 2023Cycle 30 Core Operating Limits Report (COLR)Shutdown Margin
Coatings
0CAN042302, Annual Occupational Radiation Exposure Report for 202227 April 2023Annual Occupational Radiation Exposure Report for 2022
0CAN042301, Radioactive Effluent Release Report for 202214 April 2023Radioactive Effluent Release Report for 2022Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Tritium
2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 45 April 2023License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4Hot Short
Safe Shutdown
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Zebra Mussel
FLEX
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Design basis earthquake
Large early release frequency
Flooding Focused Evaluation
Earthquake
Offsite Circuit
Continuous fire watch
Very Early Warning Fire Detection
1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure30 March 2023License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil PressureBoric Acid
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Maintenance Rule Program
2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 4629 March 2023Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46Hydrostatic
Finite Element Analysis
Dissimilar Metal Weld
2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 4629 March 2023Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46
2CAN032305, 03 Post Examination Analysis23 March 202303 Post Examination AnalysisPower change
1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)20 March 2023Inspection Summary Report for the Thirtieth Refueling Outage (1R30)VT-2
1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-03530 January 2023Responses to Request for Additional Information for Request for Relief ANO1-ISI-035Nondestructive Examination
Liquid penetrant
Flow Induced Vibration
2CAN012303, U.S. Additional Protocol23 January 2023U.S. Additional Protocol
2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 4620 January 2023Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46
1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 422 December 2022License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4
0CAN122202, Registration of Cask Use21 December 2022Registration of Cask Use
0CAN122201, Reply to a Notice of Violation; EA-22-0998 December 2022Reply to a Notice of Violation; EA-22-099Nondestructive Examination
Aging Management
0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)10 November 2022Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)Incorporated by reference
Fuel cladding
1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation31 October 2022Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump OperationAnticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Nonconservative Technical Specifications
Fuel cladding
1CAN102203, Cycle 31 Core Operating Limits Report24 October 2022Cycle 31 Core Operating Limits ReportShutdown Margin
1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations13 October 2022Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose CalculationsSurveillance Frequency Control Program
Fuel cladding
0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements29 September 2022Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing RequirementsMinimum staff
1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period8 September 2022Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period
0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements30 August 2022License Amendment Request for Approval of Changes to the Emergency Plan Staffing RequirementsFuel cladding
Minimum staff
1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period24 August 2022Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First PeriodLarge early release frequency
2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods20 July 2022Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third PeriodsBoric Acid
0CAN072201, Registration of Cask Use14 July 2022Registration of Cask Use
0CAN062202, Registration of Cask Use9 June 2022Registration of Cask Use
1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2 June 2022Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose CalculationsAffidavit
1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-03531 May 2022Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035Boric Acid
Reactor Vessel Water Level
Hydrostatic
Enforcement Discretion
Nondestructive Examination
VT-2
Incorporated by reference
Pressure Boundary Leakage
Through-Wall Leakage
Dissimilar Metal Weld