Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18180A322 | 26 June 2018 | Mcguire Nuclear Station - Emergency Preparedness Inspection and Request for Information | |
IR 05000369/2006004 | 30 October 2006 | IR 05000369-06-004, IR 05000370-06-004, on 07/01/2006 - 09/30/2006 for McGuire, Units 1 and 2, Maintenance Effectiveness, Operability Evaluations, Other Activities | Safe Shutdown Fire Barrier Significance Determination Process Operability Determination Power-Operated Valves Fire Protection Program Downpower |
IR 05000369/2006003 | 27 July 2006 | IR 05000369-06-003, 05000370-06-003, on 04/01/2006 - 06/30/2006, McGuire | Safe Shutdown Fire Barrier Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program Fire Protection Program |
ML043310176 | 29 December 2003 | E-mail, P. Fillion to M. Thomas and C. Ogle - McGuire Open Item Closeout | Safe Shutdown Significance Determination Process Backfit |
ML040160891 | 22 December 2003 | Undated Inspector Post-Inspection Debrief to Region II DRS Managers Regarding McGuire Triennial Fire Protection Inspection | Safe Shutdown Fire Barrier Hemyc Fire Protection Program Backfit Manual Operator Action |