Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23361A104 | 21 December 2023 | Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests | Stroke time Power-Operated Valves |
ML23242A119 | 29 August 2023 | (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 | Coatings Moisture barrier |
ML22160A477 | 9 June 2022 | Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles | Hydrostatic |
ML22040A146 | 8 February 2022 | (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 26 | Boric Acid Coatings Aging Management Moisture barrier Liquid penetrant Dissimilar Metal Weld |
ML20296A692 | 20 October 2020 | (VCSNS) Unit 1 - Special Report (Spr) 2020002 - Steam Generator Tube Inspection Report | |
ML20212L587 | 30 July 2020 | (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 25 | Coatings Moisture barrier |
ML19120A514 | 30 April 2019 | (Vcsns), Unit 1 - Alternative Request RR-4-23 to Utilize Code Case N-513-4 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | |
ML19052A610 | 21 February 2019 | (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 24 | Boric Acid Coatings Moisture barrier |
RC-17-0106, Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 23 | 29 August 2017 | Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 23 | Coatings Moisture barrier |
RC-16-0034, Inservice Inspection (ISI) Owner'S Activity Report )OAR) for Refueling Outage 22 | 3 March 2016 | Inservice Inspection (ISI) Owner'S Activity Report )OAR) for Refueling Outage 22 | Boric Acid Coatings Moisture barrier |
RC-15-0020, Attachment 4 - First Inservice Inspection for Steam Generator a | 25 February 2015 | Attachment 4 - First Inservice Inspection for Steam Generator a | Liquid penetrant |
ML15061A035 | 25 February 2015 | Attachment 4 - First Inservice Inspection for Steam Generator a | Liquid penetrant |
RC-14-0145, Twenty-First Refueling Inservice Inspection (ISI) Reports | 28 August 2014 | Twenty-First Refueling Inservice Inspection (ISI) Reports | Boric Acid Hydrostatic Coatings Nondestructive Examination VT-2 Moisture barrier EVT-1 Liquid penetrant Dissimilar Metal Weld DM weld |
RC-14-0021, Relief Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations | 24 February 2014 | Relief Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations | Liquid penetrant |
ML13289A183 | 11 October 2013 | Response to Request for Additional Information Concerning Relief Request No. RR-III-10 | Boric Acid VT-2 |
RC-13-0026, Twentieth Refueling Inservice Inspection (ISI) Report | 6 March 2013 | Twentieth Refueling Inservice Inspection (ISI) Report | Boric Acid Weld Overlay Hydrostatic Coatings VT-2 Moisture barrier |
ML120660310 | 26 August 2011 | Nineteenth Refueling Inservice Inspection (ISI) Report | |
RC-11-0117, Request to Use Alternatives to ASME Code Requirements in VCSNS 3rd Ten Year Inservice Inspection Interval (RR-III-07) Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval | 16 August 2011 | Request to Use Alternatives to ASME Code Requirements in VCSNS 3rd Ten Year Inservice Inspection Interval (RR-III-07) Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval | Probabilistic Risk Assessment |
ML120660335 | 13 June 2011 | Inservice Inspection Report # 17 | |
ML081490114 | 23 May 2008 | Inservice Inspection Relief Request RR-III-05 Weld Overlay Repair Stress Analysis Summary | Weld Overlay Nondestructive Examination Dissimilar Metal Weld |
ML081490095 | 23 May 2008 | Inservice Inspection Relief Request RR-III-05 Summary of Ultrasonic Examinations of Preemptive Weld Overlays for Pressurizer Nozzle Locations Containing Alloy 600 Materials | Weld Overlay Dissimilar Metal Weld DM weld |
ML062990461 | 19 October 2006 | Supplemental Information Regarding Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04) | Dissimilar Metal Weld |
RC-02-0161, Application of the EPRI Risk-Informed ISI Methodology to: VC Summer (Class 1 and 2), Risk Ranking Results - Table 5-2 | 16 September 2002 | Application of the EPRI Risk-Informed ISI Methodology to: VC Summer (Class 1 and 2), Risk Ranking Results - Table 5-2 | Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency |