Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
2CAN012401, U.S. Additional Protocol | 17 January 2024 | U.S. Additional Protocol | |
AEP-NRC-2022-62, 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1) | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1) | Boric Acid Shutdown Margin Loop seal Mission time Fire Barrier Hydrostatic Coatings Earthquake Fuel cladding |
ML22340A211 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 13, Tables | Boric Acid Hydrostatic |
ML22340A208 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.4, Revision 19, Environmental Qualifications Analyses (Unit 1) | |
ML22340A207 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2) | Shutdown Margin Operating Basis Earthquake Design basis earthquake |
ML22340A206 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (Unit 2) | Fuel cladding |
ML22340A205 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Tables | Hydrostatic |
ML22340A200 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2) | |
ML22340A197 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 7, Tables | Boric Acid Ultimate heat sink Fuel cladding |
ML22340A196 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) | |
ML22340A195 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 10, Tables | |
ML22340A186 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 6, Tables | Boric Acid Design basis earthquake |
ML22340A181 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 11, Tables | Boric Acid |
ML22340A180 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 1) | Safe Shutdown Earthquake Design basis earthquake |
ML22340A179 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.3-8 (Unit 2) | |
ML22340A178 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 9, Tables | Boric Acid Hydrostatic |
ML22340A177 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1-1 to 14.1.13-1 (Unit 1) | Turbine Missile |
ML22340A175 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1.0-1 to 14.1.12-1 (Unit 2) | Shutdown Margin |
ML22340A173 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Radiation Sources (Appendix 14A) (Unit 1) | Safe Shutdown Design basis earthquake Earthquake Fuel cladding |
ML22340A172 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2) | |
ML22340A171 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Tables | Safe Shutdown Design basis earthquake Earthquake |
ML22340A168 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14, Table 14.0-1 (Unit 2) | |
ML22340A167 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.1, Core and Coolant Boundary Protection Analysis (Unit 2) | Boric Acid Shutdown Margin Fuel cladding Power change |
ML22340A166 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.5-1 to 14.2.8-1 (Unit 2) | |
ML22340A162 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.1-1 to 14.1.13-6 (Unit 1) | |
ML22340A161 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.4, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 2) | |
ML22340A156 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.1-2 to 14.2.7-1 (Unit 1) | |
ML22340A154 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 5, Tables | TORMIS Earthquake Turbine Missile |
ML22340A149 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.1, Figures 14.1.0-1 to 14.1.12-2 (Unit 2) | |
ML22340A147 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.7-6 (Unit 1) | |
ML22340A143 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (Unit 1) | Fuel cladding |
ML22340A135 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 8, Tables | |
ML22340A131 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Tables 14.3.1-1 to 14.3.9-23, 14.A.1-1 to 14.G-3 (Unit 1) | Boric Acid Loop seal Fire Barrier Coatings |
ML22340A128 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1) | |
ML22259A122 | 8 September 2022 | ANO Service Water KM Version | Ultimate heat sink VT-2 Aging Management |
ML21354A755 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 10 of 18 | FLEX Coronavirus |
AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report | 12 August 2021 | Form OAR-1, Owner'S Activity Report | Through Wall Leak |
ML21125A601 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 13, Tables | Boric Acid Hydrostatic |
ML21125A593 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 11, Tables | Boric Acid |
ML21125A590 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2) | Shutdown Margin Operating Basis Earthquake Design basis earthquake |
ML21125A547 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 5, Tables | TORMIS Earthquake Turbine Missile |
ML21125A526 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 8, Tables | |
ML21125A520 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 9, Tables | Boric Acid Hydrostatic |
ML21125A517 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1.0-1 to 14.1.12-1 (Unit 2) | Shutdown Margin |
ML21125A510 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2, Tables | Safe Shutdown Design basis earthquake Earthquake |
ML18312A071 | 30 October 2018 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Part 2 | Safe Shutdown Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Emergency Lighting Finite Element Analysis Earthquake |
CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table | 19 March 2018 | Submittal of Joint Plant Access Shared Information Table | |
ML17150A256 | 5 June 2017 | Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) | |
ML16336A386 | 24 October 2016 | Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-10 | |
ML16336A384 | 24 October 2016 | Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-8 |