Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20206P698 | 7 January 1999 | Ehnp Intake Structure Licensing Rept | Coatings Aging Management Earthquake |
ML20248B865 | 15 May 1998 | Quadrennial Simulator Certification Rept | Shutdown Margin Stroke time Overtravel Fuel cladding |
ML20199B056 | 31 December 1997 | Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Flow Induced Vibration |
ML20210J045 | 8 August 1997 | Extended Power Uprate Licensing Submittal | |
ML20138G597 | 11 September 1996 | Rev 2 to 10AC-MGR-010-0S, Unit 1 RHR Svc Water:Release of Contaminated Water | Offsite Dose Calculation Manual |
ML20115H753 | 30 April 1996 | Rev 0 to Evaluation of Hatch Unit 1 Shroud Vertical Weld Indications | |
ML20094B031 | 31 October 1995 | Structural Margin Evlauation for Hatch 2 Internal Core Spray Lines | |
ML20086E824 | 3 July 1995 | Rev 0 to Safety Evaluation for Installation of Stabilizers on Ei Hatch Nuclear Plant Unit 2 Core Shroud | Earthquake Power Uprate |
ML20084N388 | 30 May 1995 | USI A-46 Summary Rept Ei Hatch Nuclear Plant Unit 2 | |
ML20084N369 | 30 May 1995 | USI A-46 Summary Rept Ei Hatch Nuclear Plant Unit 1 | Safe Shutdown Safe Shutdown Earthquake Abnormal operational transient Design basis earthquake Earthquake Fuel cladding |
ML20080H893 | 20 February 1995 | Suppl to Shroud Repair Hardware Stress Analysis, Dtd Feb 1995 | Finite Element Analysis |
ML20077S120 | 30 November 1994 | Nonproprietary Safety & 10CFR50.92 Significant Hazards Consideration Assessment for RPV Stratification Prevention Improvements at Ei Hatch Nuclear Plant Units 1 & 2 | Fuel cladding Coast down |
ML20080H889 | 26 September 1994 | Shroud Repair Hardware Stress Analysis,Sept 1994 | Operating Basis Earthquake Finite Element Analysis Design basis earthquake Flow Induced Vibration |
ML20072M005 | 31 July 1994 | Evaluation of Indications in Plant Hatch Unit-2 Core Shroud Welds H1,H2,H3 & H4 | |
ML20069A541 | 19 April 1994 | Simulator Certification Form 474 Quadrennial Rept | |
ML20059E927 | 31 December 1993 | Suppl Piping Earthquake Performance Data | Earthquake |
ML20044F600 | 29 April 1993 | Ultrasonic Insp of Feedwater Nozzles. | Liquid penetrant |
ML20099D202 | 15 June 1992 | Master Trust Agreement for Decommissioning of Nuclear Plants Between Georgia Power Co & Bank of Ny,As Trustee | |
ML20094H398 | 29 February 1992 | IGSCC Flaw Evaluations & Weld Overlay Activities During Ei Hatch Unit 1 Fall 1991 Outage | Weld Overlay |
ML20091K953 | 10 January 1992 | IGSCC Flaw Evaluations & Weld Overlay Activities During Ei Hatch Unit 1 Fall 1991 Outage | Weld Overlay |
ML20078A110 | 30 September 1991 | Rev 0 to Updated Feedwater Nozzle Fracture Mechanics Analysis for Ei Hatch,Unit 2 | |
ML20091B170 | 31 May 1991 | Rev 0 to Evaluation & Repair of Flaw Indications in Feedwater a Safe-End to Extension Weld at Hatch,Unit 2 | Weld Overlay |
ML20065Q864 | 15 November 1990 | Isolation Function of MOVs for HPCI & RCIC Steam Supply Line & RWCU Water Supply Line for Hatch | Hydrostatic Through-Wall Leak |
ML20055H586 | 20 July 1990 | Seismic Margin Assessment Edwin I Hatch Nuclear Plant, Vols 1-3 | Safe Shutdown Reactor Vessel Water Level Safe Shutdown Earthquake Weld Overlay Operating Basis Earthquake Abnormal operational transient Seismically rugged Design basis earthquake Earthquake Fuel cladding Scaffolding |
ML20058K523 | 26 June 1990 | Flaw Evaluation & Weld Overlay Designs for Ei Hatch Unit 1 Spring 1990 Refueling Outage | Weld Overlay Liquid penetrant |
ML20043E677 | 7 June 1990 | Rev 0 to Core Operating Limits Rept for Operating Cycle 13. | |
ML19332D202 | 31 December 1989 | Rev 2 to Plant Unique Analysis Rept for Ei Hatch Nuclear Plant Unit 2,Mark I Containment Long-Term Program. | |
ML19332D200 | 31 December 1989 | Rev 3 to Plant Unique Analysis Rept for Ei Hatch Nuclear Plant Unit 1,Mark I Containment Long-Term Program. | Hydrostatic Earthquake |
ML20012B735 | 30 November 1989 | Metallurgical Evaluation of Four-Inch Pipe-to-Elbow Weld from Plant Hatch,Unit 2. | Liquid penetrant |
ML20245K870 | 29 June 1989 | Simulator Certification Submittal,Vol 2: 'Nuclear Simulator Engineering Manual.' | |
ML20059M123 | 31 May 1989 | Ei Hatch Nuclear Plant Evaluation of Failure of Time Delay Relays in RWCU Differential Flow High Instrumentation During Design Basis Events | Reactor Vessel Water Level Stroke time |
ML20244E258 | 30 April 1989 | Station Blackout Rept | Safe Shutdown Operator Manual Action Emergency Lighting Battery sizing Earthquake |
ML20247C444 | 31 March 1989 | Unit 1 Suppression Chamber Support Anchor Bolt Study | |
ML20234B505 | 30 November 1987 | Dcrdr Final Rept | Reactor Vessel Water Level Squib |
ML20151L707 | 30 November 1987 | Review of Seismic Analysis of Hatch Units 1 & 2: In-Structure Response Spectra | Earthquake |
ML20236B835 | 21 July 1987 | Rev 1 to Hatch 9X9 Lead Fuel Assemblies Sar | Shutdown Margin Anticipated operational occurrence |
ML20215G458 | 11 June 1987 | Rev 1 to Flaw Evaluation & Repair Design for Plant Ei Hatch Unit 1 Spring 1987 Outage | Weld Overlay |
ML20211H584 | 28 February 1987 | Rev 0 to Justification for Continued Operation W/Existing Weld Overlays at Hatch Unit 1 | Weld Overlay |
ML20211H615 | 31 December 1986 | Draft Technical Justification for Extended Weld Overlay Design Life | Non-Destructive Examination Weld Overlay Nondestructive Examination Earthquake Liquid penetrant |
ML20207G196 | 31 December 1986 | Dcrdr Summary Rept Vol I, Methodology & Approach | Safe Shutdown Reactor Vessel Water Level Nondestructive Examination Temporary Modification Emergency Lighting Fuel cladding Failure to Scram |
ML20207G224 | 31 December 1986 | Dcrdr Summary Rept Vols II & Iia, Human Engineering Discrepancy Results | Temporary Modification |
ML20207L458 | 30 November 1986 | Revised Rept on Settlement of Major Plant Structures | |
ML20154C452 | 29 August 1986 | Sys Evaluation Document for Georgia Power Co for Ei Hatch Unit 1 for Reactor Recirculation Sys (B31) | |
ML20212J238 | 31 May 1986 | Rept on Settlement of Major Plant Structures | |
ML20155G798 | 17 April 1986 | Rev 2 to Evaluation of IGSCC Flaw Indications & Weld Overlay Designs for Ei Hatch Unit 1-Fall 1985/86 Maint/ Refueling Outage | Weld Overlay |
ML20154L645 | 6 March 1986 | Rev 0 to Evaluation of IGSCC Flaw Indications & Weld Overlay Designs for Ei Hatch Unit 1 - Fall 1985. Maint/Refueling Outage | Weld Overlay |
ML20209F254 | 30 June 1985 | Rev 1 to Technical Justification for Continued Operation of Hatch Unit 1 W/Existing Recirculation & RHR Sys Piping | Non-Destructive Examination Weld Overlay Nondestructive Examination Liquid penetrant |
ML20132C558 | 17 May 1985 | Rev 0 to Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1 | Weld Overlay Nondestructive Examination Liquid penetrant |
ML20046D316 | 22 March 1985 | Rept on Electrical Circuit Protective Matls. | |
ML20113F632 | 31 January 1985 | Recommended Cable Tray Support Damping | Earthquake |