Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22245A100 | 5 May 2022 | 9 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - Redacted | Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Coatings Emergency Lighting FLEX Earthquake Fire Protection Program Fire Watch Early Warning Fire Detection Scaffolding |
ML22131A127 | 5 May 2022 | 8 to Fire Protection of Safe Shutdown Capability (Appendix R) | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Fire Barrier Emergency Lighting Thermoset Time Critical Operator Action Fire Protection Program Power change |
ML20323A170 | 22 October 2020 | Rev. 17 to Fire Protection Safe Shutdown Capability | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Fire Barrier Emergency Lighting Thermoset Time Critical Operator Action Fire Protection Program Power change |
ML17310A473 | 27 October 2017 | Seabrook Station Revision 15 to Appendix R, Fire Protection of Safe Shutdown Capability | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Fire Barrier Emergency Lighting Thermoset Time Critical Operator Action B.5.b Mitigating Strategies Fire Protection Program Power change |
ML16147A202 | 29 April 2016 | Revision 17 to Updated Final Safety Analysis Report, Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R) | Safe Shutdown |
ML14317A481 | 21 October 2014 | Updated Final Safety Analysis Report, Revision 16, Cover, Loep, and Chapter 1, Introduction and General Description of Plant | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Emergency Lighting Incorporated by reference Tornado Generated Missile Earthquake Turbine Missile Pressure Boundary Leakage Fire Protection Program Siren |
ML14317A491 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity | Earthquake |
ML14317A495 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2C, Geologic Investigations of the Scotland Road Fault | Coatings |
ML14317A497 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2G, Static Dynamic Rock Properties | Hydrostatic |
ML14318A024 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R), Revision 13 | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Fire Barrier Emergency Lighting Thermoset Time Critical Operator Action B.5.b Mitigating Strategies Fire Protection Program Power change |
ML14317A496 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area | |
ML14317A494 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2B, Onsite Meteofological Data Summaries; April 1979 - March 1980 | |
ML14317A492 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2F, Geotechnical Report - Reactor Borings | Coatings |
ML14317A479 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Figures 2.3-1 Through 2.3-11 |