Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22146A366 | 13 April 2022 | Current Through Revision 10 to Fire Protection Report (ML22111A255 Redacted) | Hot Short Safe Shutdown Packing leak High Radiation Area Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Emergency Lighting Scram Discharge Volume Fire Protection Program Hourly Fire Watch Scaffolding |
RS-22-052, 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted) | 13 April 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted) | |
ML20147A671 | 4 June 2020 | EPID-L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 001 Appendices (Amended)-ML20133J880_Redacted | |
ML20150A256 | 4 June 2020 | EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 006 Chap 06 Eng Safety Features-ML20111A253_Redacted | Safe Shutdown Reactor Vessel Water Level Packing leak Ultimate heat sink Grab sample Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Squib Abnormal operational transient Design basis earthquake Scram Discharge Volume Feedwater Controller Failure Earthquake Fuel cladding Liquid penetrant Power change Power Uprate |
ML20153A792 | 4 June 2020 | EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 009 Chap 09 Auxiliary Systems-ML20111A256 Redacted | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Time to boil Safe Shutdown Earthquake Coatings Operating Basis Earthquake Nuclear Accident Reporting System Emergency Lighting Design basis earthquake Earthquake Control of Heavy Loads Power Uprate |
ML20153A799 | 4 June 2020 | EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 011 Chap 09 Figures Part 2 of 7-ML20111A258-Redacted | Fire Barrier |
ML20153A818 | 4 June 2020 | EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 015 Chap 09 Figures Part 6 of 7-ML20111A262-Redacted | |
ML20154K608 | 4 June 2020 | EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 019 Chap 12 Radiation Protection-ML20111A266-BKV-Redacted | High Radiation Area Grab sample Anticipated operational occurrence Coatings Locked High Radiation Area Deep Dose Equivalent Fuel cladding Power Uprate |
ML20038A200 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 3 of 7 (Redacted) | |
ML20038A147 | 1 April 2018 | Fire Protection Report - Page Index - Current Through Revision 8 - April 2018 (Redacted) | Hot Short Safe Shutdown Packing leak High Radiation Area Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Emergency Lighting Scram Discharge Volume Fire Protection Program Hourly Fire Watch Scaffolding |
ML20038A157 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 6 Eng Safety Features (Redacted) | Safe Shutdown Reactor Vessel Water Level Packing leak Ultimate heat sink Grab sample Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Squib Abnormal operational transient Design basis earthquake Scram Discharge Volume Feedwater Controller Failure Earthquake Fuel cladding Liquid penetrant Power change Power Uprate |
ML20038A172 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 8 Electric Power (Redacted) | Hot Short Safe Shutdown Fire Barrier Slow transfer Safe Shutdown Earthquake Earthquake Power-Operated Valves |
ML20038A178 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Auxiliary Systems (Redacted) | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Time to boil Safe Shutdown Earthquake Coatings Operating Basis Earthquake Nuclear Accident Reporting System Emergency Lighting Design basis earthquake Earthquake Control of Heavy Loads Power Uprate |
ML20038A192 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 2 of 7 (Redacted) | Fire Barrier |
ML20038A201 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 4 of 7 (Redacted) | |
ML20038A205 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 5 of 7 (Redacted) | |
ML20038A215 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 6 of 7 (Redacted) | |
ML20038A218 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 7 of 7 (Redacted) | |
ML20038A232 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 12 Radiation Protection (Redacted) | High Radiation Area Grab sample Anticipated operational occurrence Coatings Locked High Radiation Area Deep Dose Equivalent Fuel cladding Power Uprate |
ML20038A244 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 13 Conduct of Operations (Redacted) | Fitness for Duty Process Control Program |
ML20038A247 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Appendices (Redacted) | |
ML16167A502 | 6 September 2016 | UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted | |
ML16167A483 | 6 September 2016 | MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 5 of 14 Redacted | |
ML16167A484 | 6 September 2016 | UFSAR, Rev 22, Chap 09 Figures Part 6 of 14 - Redacted | |
ML16167A497 | 6 September 2016 | MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 8 of 14 - Redacted | |
ML16167A446 | 6 September 2016 | MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted | |
ML081330091 | 14 April 2008 | Fire Protection Report, Volumes 1 and 2 | Hot Short Safe Shutdown High Radiation Area Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Nuclear Accident Reporting System Emergency Lighting Scram Discharge Volume Fire Protection Program Hourly Fire Watch Scaffolding |
RS-08-045, LaSalle, Units 1 and 2, Fire Protection Report, Volumes 1 and 2 | 14 April 2008 | LaSalle, Units 1 and 2, Fire Protection Report, Volumes 1 and 2 |