RS-08-045, LaSalle, Units 1 and 2, Fire Protection Report, Volumes 1 and 2
From kanterella
(Redirected from ML081330091)
Jump to navigation
Jump to search
ML081330091 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 04/14/2008 |
From: | Exelon Generation Co, Exelon Nuclear |
To: | Office of Nuclear Reactor Regulation |
References | |
RS-08-045 | |
Download: ML081330091 (899) | |
Similar Documents at LaSalle | |
---|---|
Category:Fire Protection Plan
MONTHYEARML22146A3662022-04-13013 April 2022
[Table view]Current Through Revision 10 to Fire Protection Report (ML22111A255 Redacted) RS-22-052, 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted)2022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted) ML20147A6712020-06-0404 June 2020 EPID-L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 001 Appendices (Amended)-ML20133J880_Redacted ML20150A2562020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 006 Chap 06 Eng Safety Features-ML20111A253_Redacted ML20153A7922020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 009 Chap 09 Auxiliary Systems-ML20111A256 Redacted ML20153A7992020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 011 Chap 09 Figures Part 2 of 7-ML20111A258-Redacted ML20153A8182020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 015 Chap 09 Figures Part 6 of 7-ML20111A262-Redacted ML20154K6082020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 019 Chap 12 Radiation Protection-ML20111A266-BKV-Redacted ML20038A2002018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 3 of 7 (Redacted) ML20038A1472018-04-0101 April 2018 Fire Protection Report - Page Index - Current Through Revision 8 - April 2018 (Redacted) ML20038A1572018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 6 Eng Safety Features (Redacted) ML20038A1722018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 8 Electric Power (Redacted) ML20038A1782018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Auxiliary Systems (Redacted) ML20038A1922018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 2 of 7 (Redacted) ML20038A2012018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 4 of 7 (Redacted) ML20038A2052018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 5 of 7 (Redacted) ML20038A2152018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 6 of 7 (Redacted) ML20038A2182018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 9 Figures Part 7 of 7 (Redacted) ML20038A2322018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 12 Radiation Protection (Redacted) ML20038A2442018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 13 Conduct of Operations (Redacted) ML20038A2472018-04-0101 April 2018 UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Appendices (Redacted) ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted ML16167A4832016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 5 of 14 Redacted ML16167A4842016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 6 of 14 - Redacted ML16167A4972016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 8 of 14 - Redacted ML16167A4462016-09-0606 September 2016 MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted ML0813300912008-04-14014 April 2008 Fire Protection Report, Volumes 1 and 2 RS-08-045, LaSalle, Units 1 and 2, Fire Protection Report, Volumes 1 and 22008-04-14014 April 2008 LaSalle, Units 1 and 2, Fire Protection Report, Volumes 1 and 2 2022-04-13 Category:Report MONTHYEARRA24-008, Post-Outage Inservice Inspection (ISI) Summary Report2024-06-20020 June 2024
[Table view]Post-Outage Inservice Inspection (ISI) Summary Report RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23181A1522023-06-30030 June 2023 Attachment 2 - LaSalle County Station Units 1 and 2, Pressure and Temperature Limits Report (PTLR) Up to 54 Effective Full-Power Years (Efpy), Revision 3 RS-23-066, Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report2023-05-0303 May 2023 Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report RA22-060, Regulatory Commitment Change Summary Report2022-11-30030 November 2022 Regulatory Commitment Change Summary Report ML22332A4552022-11-10010 November 2022 Attachment 7 - BWRVIP-135, Revision 4: BWR Vessel Internals Project Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations (Non-Proprietary Version) ML22332A4542022-11-10010 November 2022 Attachment 6 - LaSalle County Generating Station Units 1 and 2 Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (EFPY) (Non-Proprietary) NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 ML21265A5582021-06-30030 June 2021 Attachment 5: Appendix C, NEI 12-16 Criticality Analysis Checklist RA21-016, Netco Rack Insert 10-year Surveillance Report2021-04-15015 April 2021 Netco Rack Insert 10-year Surveillance Report RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.692020-10-16016 October 2020 Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 ML20085F8612020-03-24024 March 2020 Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP) RA20-015, Triennial Chlorine Survey Report2020-03-20020 March 2020 Triennial Chlorine Survey Report RS-20-024, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2020-03-0909 March 2020 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 RA19-005, Regulatory Commitment Change Summary Report2019-01-14014 January 2019 Regulatory Commitment Change Summary Report RA18-110, Submittal of 2017 Regulatory Commitment Change Summary Report2018-12-27027 December 2018 Submittal of 2017 Regulatory Commitment Change Summary Report RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-12-14014 December 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML18024A2772018-08-16016 August 2018 Lessons Learned from Us NRC Response to the February 2017 LaSalle County Station Unit 2 High Pressure Core Spray Injection Valve Failure RA17-072, Post Accident Monitoring Report2017-08-0202 August 2017 Post Accident Monitoring Report RA17-069, Post Accident Monitoring Report2017-07-21021 July 2017 Post Accident Monitoring Report RS-17-025, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-0808 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal ML16355A4182017-01-11011 January 2017 Flood Hazard Mitigation Strategies Assessment RA16-092, Regulatory Commitment Change Summary Report2016-12-27027 December 2016 Regulatory Commitment Change Summary Report RS-16-182, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-10-28028 October 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16305A2962016-10-27027 October 2016 0000-0163-8881-R0-NP, Revision 0, Exelon Nuclear LaSalle County Generating Station Units 1 & 2 Pool Swell Response. ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted ML16167A4462016-09-0606 September 2016 MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML16224A7862016-08-26026 August 2016 Notice of Availability of the Final Plant-Specific Supplement 57 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding LaSalle County Station, Units 1 and 2 (TAC Nos. MF5567 and MF5568) ML16200A1562016-07-18018 July 2016 Report on the Safety Aspects of the License Renewal Application of the LaSalle County Station, Units 1 and 2 RS-15-300, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..2015-12-16016 December 2015 Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. RA15-075, Transmittal of the 2014 Regulatory Commitment Change Summary Report2015-11-20020 November 2015 Transmittal of the 2014 Regulatory Commitment Change Summary Report ML15107A1542015-04-21021 April 2015 Final Accident Sequence Precursor Analysis for the April 17, 2013, Dual Unit Loss of Offsite Power RS-15-004, County Station Introduction of Lead Use Assemblies2015-01-20020 January 2015 County Station Introduction of Lead Use Assemblies ML14352A1902014-12-18018 December 2014 7491-318563-HAO-1, Rev. 2, LaSalle Requested Documents RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14177A8592014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 RS-14-054, LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves2014-02-26026 February 2014 LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves ML14057A5492014-02-26026 February 2014 Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves ML14030A2232014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A3252014-02-19019 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for LaSalle County Station, Units 1 and 2, TAC Nos.: MF1121 and MF1122 ML13358A3652013-12-20020 December 2013 Attachment 5: LaSalle County Station, Unit 1, Pressure/Temperature Limits Report ML13344A9822013-12-0909 December 2013 2012 Regulatory Commitment Change Summary Report ML13282A3502013-10-0404 October 2013 Final Report, Assessment of Wind Speeds Over the LaSalle County Station Ultimate Heat Sink. 2024-06-20 Category:Miscellaneous MONTHYEARRA24-008, Post-Outage Inservice Inspection (ISI) Summary Report2024-06-20020 June 2024
[Table view]Post-Outage Inservice Inspection (ISI) Summary Report RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RA22-060, Regulatory Commitment Change Summary Report2022-11-30030 November 2022 Regulatory Commitment Change Summary Report ML21265A5582021-06-30030 June 2021 Attachment 5: Appendix C, NEI 12-16 Criticality Analysis Checklist RA21-016, Netco Rack Insert 10-year Surveillance Report2021-04-15015 April 2021 Netco Rack Insert 10-year Surveillance Report ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting RA20-015, Triennial Chlorine Survey Report2020-03-20020 March 2020 Triennial Chlorine Survey Report RS-20-024, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2020-03-0909 March 2020 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RA19-005, Regulatory Commitment Change Summary Report2019-01-14014 January 2019 Regulatory Commitment Change Summary Report RA18-110, Submittal of 2017 Regulatory Commitment Change Summary Report2018-12-27027 December 2018 Submittal of 2017 Regulatory Commitment Change Summary Report RA17-072, Post Accident Monitoring Report2017-08-0202 August 2017 Post Accident Monitoring Report RA17-069, Post Accident Monitoring Report2017-07-21021 July 2017 Post Accident Monitoring Report RS-17-025, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-0808 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal ML16355A4182017-01-11011 January 2017 Flood Hazard Mitigation Strategies Assessment RA16-092, Regulatory Commitment Change Summary Report2016-12-27027 December 2016 Regulatory Commitment Change Summary Report RS-16-182, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-10-28028 October 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16305A2962016-10-27027 October 2016 0000-0163-8881-R0-NP, Revision 0, Exelon Nuclear LaSalle County Generating Station Units 1 & 2 Pool Swell Response. RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML16224A7862016-08-26026 August 2016 Notice of Availability of the Final Plant-Specific Supplement 57 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding LaSalle County Station, Units 1 and 2 (TAC Nos. MF5567 and MF5568) ML16200A1562016-07-18018 July 2016 Report on the Safety Aspects of the License Renewal Application of the LaSalle County Station, Units 1 and 2 RS-15-300, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..2015-12-16016 December 2015 Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. RA15-075, Transmittal of the 2014 Regulatory Commitment Change Summary Report2015-11-20020 November 2015 Transmittal of the 2014 Regulatory Commitment Change Summary Report ML14352A1902014-12-18018 December 2014 7491-318563-HAO-1, Rev. 2, LaSalle Requested Documents ML14177A8592014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML13344A9822013-12-0909 December 2013 2012 Regulatory Commitment Change Summary Report IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12353A2172012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 9 of 16 ML12353A2232012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 15 of 16 ML12353A2162012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 8 of 16 ML12353A2152012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 7 of 16 ML12353A2132012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 6 of 16 ML12353A2112012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 5 of 16 ML12353A2102012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 4 of 16 ML12353A2092012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 3 of 16 ML12353A2082012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 2 of 16 ML12353A2062012-11-0101 November 2012 12Q0108.50-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 1, Part 15 of 15 ML12353A2052012-11-0101 November 2012 12Q0108.50-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 1, Part 14 of 15 ML12353A2202012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 12 of 16 ML12353A2212012-11-0101 November 2012 12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 13 of 16 2024-06-20 |