Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23306A278 | 2 November 2023 | Final Safety Analysis Report | Safe Shutdown Power Operated Valves |
ML23001A016 | 31 December 2022 | LLC, Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 3, Design of Structures, Systems, Components and Equipment, Revision 0 | Safe Shutdown Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Tornado-Generated Missile Tornado Missile Protection Earthquake Turbine Missile Through-Wall Leakage Power change |
ML22365A013 | 31 December 2022 | LLC, Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 18, Human Factors Engineering, Revision 0 | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Chernobyl Power change Affidavit |
ML22364A276 | 30 December 2022 | LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Revision 0 | Safe Shutdown Packing leak Ultimate heat sink Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program |
ML22363A194 | 29 December 2022 | LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 16, Technical Specifications, Revision 0 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Probabilistic Risk Assessment Pressure and Temperature Limits Report Surveillance Frequency Control Program Pressure Boundary Leakage |
ML22362A027 | 28 December 2022 | LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 17, Quality Assurance and Reliability Assurance, Revision 0 | Ultimate heat sink Probabilistic Risk Assessment Maintenance Rule Program |