Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0630002241 December 2006VEGP Environmental Report - Operating License Stage
ML0630002231 December 2006Executive Summary for Groundwater Drawdown Calculations Included in Vogtle ESP Er Sections 4.2.2 and 5.2.2 Groundwater Use Impacts During Construction and Operation
ML0630002011 December 20067 to Procedure 36030-C, Meteorological Tower Monitoring and Data Control.Met Tower
ML0630001951 December 2006.2 to Procedure 24075-C, Meteorological Station 10M Back-Up Wind Direction - Channel Calibration.Met Tower
Temporary Modification
ML06300020625 August 2005Environmental Justice - Information on Minority, Low-Income, and Migrant Populations and Subsistence Living Activities in Region for Early Site Permitting at the Vogtle Electric Generating PlantEnvironmental Justice
ML06300020220 June 2005Plant Vogtle Zip Code Listing-Southern Human Resource
ML0630002189 June 2005Procedure NMP-EN-001, Version 2.0, Management of the Radioactive Effluent Release Reports and the Offsite Dose Calculation Manuals.Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML06300021326 July 20046.1 to Procedure 24681-C, Meteorological Station - 10M Wind Direction Channel Calibration.Met Tower
Temporary Modification
ML06300020926 July 20040.1 to Procedure 24076-C, Meteorological Station 10M Back-Up Ambient Temperature Channel Calibration.Met Tower
Temporary Modification
ML0630002258 May 1997Georgia Power Transmission Bulletin No. 6-10: Maintenance of Plant Vogtle Transmission Line Corridors. Revised
ML0622105061 March 1974Final Environmental Statement Related to the Proposed Alvin W. Vogtle Nuclear Plant, Units 1, 2, 3 and 4Boric Acid
Grab sample
Earthquake
Fuel cladding