NRC 2016-0027, Submittal of Report of Changes to Emergency Plan Dated 08/26/2016 | 26 August 2016 | Submittal of Report of Changes to Emergency Plan Dated 08/26/2016 | |
NRC 2004-0064, Transmittal of Point Beach, Units 1 and 2 - Emergency Plan Implementing Procedure, Revision to Emergency Action Levels | 15 October 2004 | Transmittal of Point Beach, Units 1 and 2 - Emergency Plan Implementing Procedure, Revision to Emergency Action Levels | Hot Short Safe Shutdown Unanalyzed Condition High winds Shutdown Margin Internal Flooding Emergency Lighting Earthquake |
ML051400385 | 8 October 2004 | Enclosure IV Attachments 1 & 2 Point Beach Revised EAL Submittal. Attachment 1: Red Line of the Technical Basis Document. Attachment 2: Clean Copy of the Technical Basis Document | |
NRC 2004-0029, Emergency Plan Implementing Procedures Manual Revisions | 24 March 2004 | Emergency Plan Implementing Procedures Manual Revisions | Safe Shutdown Time of Discovery High winds Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Operating Basis Earthquake Severe Accident Management Guideline Earthquake Turbine Missile Fuel cladding Power change |
ML053260475 | 4 March 2004 | Enclosure F, Part 6, Emergency Measures, of the Point Beach Nuclear Plant (Pbnp) Emergency Plan Manual, Dtd March 4, 2004, Appendix J, Evacuation Time Estimates for the Area Surrounding the Pbnp, of the Pbnp Emergency Plan Manual, Dtd Augus | Nuclear Accident Reporting System Fatality |
NRC 2004-0010, Emergency Plan Implementing Procedures Manual and Emergency Plan Manual Revisions | 16 January 2004 | Emergency Plan Implementing Procedures Manual and Emergency Plan Manual Revisions | Safe Shutdown Time of Discovery High winds Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Operating Basis Earthquake Severe Accident Management Guideline Earthquake Turbine Missile Fuel cladding Power change |
ML040070236 | 26 November 2003 | 4 to EPIP 1.1, Course of Actions, Revision 32 to EPIP 1.3, Dose Assessment and Protective Action Recommendations, and Revision 28 to EPIP 2.1, Notifications - ERO, State & Counties, and Nrc. | Nuclear Accident Reporting System Fuel cladding |
NRC 2003-0113, Emergency Plan and Emergency Plan Implementing Procedure Changes | 25 November 2003 | Emergency Plan and Emergency Plan Implementing Procedure Changes | Safe Shutdown High winds Safeguards Contingency Plan Minimum staff Accidental discharge Siren |
NRC 2003-0098, Nuclear Emergency Public Information Plan Revisions | 28 October 2003 | Nuclear Emergency Public Information Plan Revisions | |
NRC 2003-0092, Emergency Plan Implementing Procedure Revisions | 30 September 2003 | Emergency Plan Implementing Procedure Revisions | Nuclear Accident Reporting System Fuel cladding |
NRC 2003-0086, Nuclear Emergency Public Information & Implementing Procedure Revisions | 18 September 2003 | Nuclear Emergency Public Information & Implementing Procedure Revisions | |
NRC 2003-0081, Revised Emergency Plan Implementing Procedures | 10 September 2003 | Revised Emergency Plan Implementing Procedures | Minimum staff |
NRC 2003-0078, Nuclear Emergency Public Information Plan and Implementing Procedure Revisions | 25 August 2003 | Nuclear Emergency Public Information Plan and Implementing Procedure Revisions | Earthquake |
NRC 2003-0064, Joint Public Information Center Procedure Control Manual | 22 July 2003 | Joint Public Information Center Procedure Control Manual | Health Physics Network Safe Shutdown Earthquake Design basis earthquake Severe Accident Management Guideline Earthquake Fatality Siren |
NRC 2003-0062, Emergency Plan Implementing Procedure Revisions, Point Beach, Units 1 & 2 | 14 July 2003 | Emergency Plan Implementing Procedure Revisions, Point Beach, Units 1 & 2 | Minimum staff |
NRC 2003-0055, Emergency Plan Implementing Procedure Revisions, Point Beach, Units 1 & 2 | 10 June 2003 | Emergency Plan Implementing Procedure Revisions, Point Beach, Units 1 & 2 | Health Physics Network Emergency Lighting Minimum staff Accidental discharge |
NRC-2003-0043, Emergency Plan Implementing Procedure Revisions | 19 May 2003 | Emergency Plan Implementing Procedure Revisions | Safe Shutdown Boric Acid Fitness for Duty Health Physics Network Probabilistic Risk Assessment Severe Accident Management Guideline Fatality |
NRC 2003-0043, Emergency Plan Implementing Procedure Revisions | 19 May 2003 | Emergency Plan Implementing Procedure Revisions | Safe Shutdown Boric Acid Fitness for Duty Health Physics Network Probabilistic Risk Assessment Severe Accident Management Guideline Fatality |
NRC 2003-0035, Emergency Plan Implementing Procedure Revisions Point Beach Nuclear Plant, Units 1 & 2 | 14 April 2003 | Emergency Plan Implementing Procedure Revisions Point Beach Nuclear Plant, Units 1 & 2 | Safe Shutdown Time of Discovery High winds Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Operating Basis Earthquake Severe Accident Management Guideline Earthquake Turbine Missile Fuel cladding Power change |
NRC 2003-0031, Emergency Plan Implementing Procedure Revisons. | 8 April 2003 | Emergency Plan Implementing Procedure Revisons. | High Radiation Area Grab sample |
NRC 2003-0017, Emergency Plan Implementing Procedure Revisions Point Beach Nuclear Plant, Units 1 & 2 | 5 March 2003 | Emergency Plan Implementing Procedure Revisions Point Beach Nuclear Plant, Units 1 & 2 | Nuclear Accident Reporting System Minimum staff Accidental discharge |
NRC 2003-0012, Emergency Plan Implementing Procedure Revisions, Point Beach Nuclear Plant, Units 1 & 2 | 7 February 2003 | Emergency Plan Implementing Procedure Revisions, Point Beach Nuclear Plant, Units 1 & 2 | Reactor Vessel Water Level |
NRC 2003-0011, Emergency Plan Implementing Procedure Revisions | 27 January 2003 | Emergency Plan Implementing Procedure Revisions | Nuclear Accident Reporting System Fuel cladding |
NRC 2003-0002, Emergency Plan Implementing Procedure Revisions | 6 January 2003 | Emergency Plan Implementing Procedure Revisions | Probabilistic Risk Assessment Emergency Lighting Minimum staff Siren |
NRC 2002-0107, Emergency Plan Implementing Procedure Revisions for Point Beach Nuclear Plant, Units 1 & 2 | 6 December 2002 | Emergency Plan Implementing Procedure Revisions for Point Beach Nuclear Plant, Units 1 & 2 | Safe Shutdown Time of Discovery High winds Ultimate heat sink Grab sample Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Operating Basis Earthquake Severe Accident Management Guideline Safeguards Contingency Plan Earthquake Turbine Missile Fuel cladding Power change |
ML022400180 | 21 August 2002 | DAEC Emergency Planning Department Procedure Entire EAL Basis Document (Table of Contents Rev) (Copy 91) | |
ML022280354 | 8 August 2002 | DAEC Emergency Planning Department Procedure Transmittal Acknowledgment Memo | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Internal Flooding Operating Basis Earthquake Design basis earthquake Earthquake Fuel cladding Pressure Boundary Leakage Power change |
NRC 2002-0062, Emergency Plan Implementing Procedures EPIP 7.3.7, Revision 5, Stimating Radioiodine Air Concentrations - EPIP 12.1, Revision 14 | 12 July 2002 | Emergency Plan Implementing Procedures EPIP 7.3.7, Revision 5, Stimating Radioiodine Air Concentrations - EPIP 12.1, Revision 14 | Safe Shutdown Boric Acid High Radiation Area Grab sample Earthquake Fatality |
ML003742949 | 16 August 2000 | Revised Epips,Including Rev 68 to EPIP Index,Rev 23 to EPIP 4.3,Emergency Operations Facility (EOF) Activation & Evacuation,Rev 13 to EPIP 5.1,Personnel Emergency Dose Authorization,Rev 12 to EPIP 5.2,Radioiodine Blocking & Thyroid Dose Acc | High Radiation Area Minimum staff Overdose |
ML993630482 | 23 December 1999 | Revised Epips, Including Revision 25 to EPIP 1.3, Revision 18 to EPIP 2.1, Revision 29 to EPIP 4.1, Revision 14 to EPIP 4.2, Revision 22 to EPIP 4.3, Revision 0 to EPIP 4.7, Revision 12 to EPIP 5.1and Revision 11 to EPIP 5.2. with 12/23/99 | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Operating Basis Earthquake Nuclear Accident Reporting System Emergency Lighting Severe Accident Management Guideline Earthquake Turbine Missile Fuel cladding Minimum staff Power change Fatality Siren Overexposure Overdose |