Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20097F020 | 31 August 1984 | Technical Assistance in Conduct of Insp Program at Various Region III Nuclear Power Plants, Monthly Progress Rept for Aug 1984 | |
ML20084L930 | 8 May 1984 | Const Insps at Midland & Zimmer Nuclear Power Plants, Monthly Progress Rept for Apr 1984 | |
ML20085H181 | 31 August 1983 | Control of Heavy Loads at Nuclear Power Plants,Zimmer Nuclear Power Station,Unit 1 (Phase Ii), Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20076B731 | 31 July 1983 | Control of Heavy Loads at Nuclear Power Plants,Wh Zimmer Nuclear Power Station (Phase I) | Safe Shutdown Control of Heavy Loads |
ML20112J453 | 31 July 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Wh Zimmer Nuclear Power Station | |
ML20041D641 | 28 February 1982 | Ser,Inservice Testing Program,William H Zimmer Nuclear Station,Unit 1. | Boric Acid Stroke time Exemption Request Power-Operated Valves |
ML20052F832 | 31 January 1982 | Control of Heavy Loads at Nuclear Power Plants,Wh Zimmer Nuclear Power Station, Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20235E689 | 7 September 1971 | Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station, Final Rept | Operating Basis Earthquake Design basis earthquake Earthquake |
ML20235E654 | 24 August 1971 | Revised Draft Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station | Operating Basis Earthquake Design basis earthquake Earthquake |
ML20235E568 | 12 August 1971 | Revised Draft Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station | Operating Basis Earthquake Design basis earthquake Earthquake |
ML20235E493 | 16 July 1971 | Draft Supplemental Rept to AEC Regulatory Staff on Foundation Evaluation,Wh Zimmer Nuclear Power Station |