ML20203H882 | 30 September 1998 | Technical Evaluation Rept on Second 10-year ISI Program Plan:Entergy Operations,Waterford-3 Steam Electric Station | VT-2 Incorporated by reference |
ML20135E584 | 26 February 1997 | Revised, TER of IPE Submittal & RAI Responses for Waterford-3 Steam Electric Station | Safe Shutdown Boric Acid Ultimate heat sink Mission time Internal Flooding |
ML20082S937 | 30 September 1991 | Trip Rept:Onsite Analysis of Human Factors of Event at Waterford 3 on 910624 (Manual Reactor Trip W/Excess Steam Demand) | Boric Acid Stroke time |
ML20082N092 | 18 June 1991 | Draft Assessment of Intersystem LOCA Risks - Methodology & Application:C-E Plant | |
ML20070Q767 | 31 December 1988 | Nuclear Power Plant Sys Sourcebook,Waterford 3 | Safe Shutdown Boric Acid Ultimate heat sink Emergency Lighting B.5.b Mitigating Strategies |
ML20235C472 | 31 October 1988 | Pump & Valve Inservice Testing Program,Waterford Steam Electric Station,Unit 3 | Boric Acid Stroke time Power-Operated Valves Power Operated Valves |
ML20148M069 | 31 March 1988 | Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at Waterford Unit 3 | |
ML20236F793 | 30 September 1987 | Structural Adequacy of Waterford 3 Basemat, Technical Evaluation Rept | |
ML20195G545 | 30 September 1987 | TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing Waterford Steam Electric Station,Unit 3, Technical Evaluation Rept | Loop seal Anticipated operational occurrence |
ML20235L843 | 30 June 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Waterford 3, Informal Rept | |
ML20214Q931 | 30 April 1987 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Waterford-3, Informal Rept | |
ML20214R743 | 31 March 1987 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 | |
ML20215G274 | 31 March 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface Maine Yankee,St Lucie Units 1 & 2 & Waterford 3 | |
ML20214R153 | 31 March 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Maine Yankee,St Lucie 1 & 2 & Waterford 3, Informal Rept | |
ML20210Q448 | 9 January 1987 | Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept | |
ML20215N807 | 23 October 1986 | 3 Emergency Preparedness Exercise on 861015 | Earthquake |
ML20215K459 | 30 September 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Waterford Unit 3,Washington Nuclear Plant Units 1 & 3 | |
ML20197C602 | 30 April 1986 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,St Lucie Units 1 & 2 & Waterford Unit 3 | |
ML20137Z317 | 21 October 1985 | Design Verification & Design Validation Audit of SPDS for Louisiana Power & Light Waterford Unit 3 | Reactor Vessel Water Level |
ML20138N844 | 30 September 1985 | Dcrdr for Waterford Unit 3, Technical Evaluation Rept | |
ML20244D387 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. | |
ML20244D438 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities | |
ML20117C188 | 30 April 1985 | III Project I Rept, Informal Rept | |
ML20113D222 | 4 January 1985 | Comments on Detailed Control Room Design Review Program Plan | |
ML20107H755 | 18 July 1984 | Review of Waterford III Basemat Analysis | Finite Element Analysis Earthquake |
ML20107H732 | 21 June 1984 | Review of Waterford III Basemat Analysis | Finite Element Analysis Earthquake |
ML20107H673 | 16 April 1984 | Review of Waterford III Basemat Analysis | Finite Element Analysis Earthquake |
ML20024B957 | 31 July 1983 | Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. | |
ML20076A768 | 31 May 1983 | Draft Control of Heavy Loads at Nuclear Power Plants, Waterford Generating Station,Unit 3,Louisiana Power & Lighting Co (Phase 1), Technical Evaluation Rept | Safe Shutdown Boric Acid Coatings Control of Heavy Loads |
ML20112J410 | 31 March 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Waterford Steam Electric Station,Unit 3 | |
ML20062A937 | 30 April 1982 | Control of Heavy Loads at Nuclear Power Plants,Waterford Generating Station,Unit 3, Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |