Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20245D98522 June 1989Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also PreparedHigh Radiation Area
Fire Barrier
Nondestructive Examination
Continuous fire watch
Fire Protection Program
ML20247P94117 May 1989FOIA Request for Final Open Item Transmittal Ltrs Per NRC Insp Procedure 94300B for Listed Plants
ML20235A12516 December 1987Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs
ML20235L7697 July 1987Forwards J Frawley Rept Re Audit of Plant Safety Monitoring Sys Conducted at Westinghouse on 870629-30.Concurrence W/ Findings of Rept GivenReactor Vessel Water Level
ML20235M37225 June 1987Forwards Final EGG-NTA-7666, Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components:Vogtle 1 & 2. Plant Not in Conformance W/Generic Ltr Item
ML20234B62112 May 1987Requests That Listed Plants Be Added to Encl 870508 FOIA Request Re 94300 Region Input on Plant Readiness
ML20234B6578 May 1987FOIA Request for Placement,In Pdr,Region Input to NRC Headquarters,Nrr Re Status of Listed Plants in Terms of Plant Readiness for OL IE Manual,Chapter 94300
ML20214R4058 May 1987FOIA Request for Region Input to NRR Re Status of Listed Plants Readiness for Ol,Per IE Manual Chapter 94300
ML20215J2499 February 1987Forwards EGG-NTA-7468, Pump & Valve Inservice Testing Program,Vogtle Electric Generating Plant,Unit 1, Final Technical Evaluation Rept
ML20215D4745 December 1986Requests Withholding of Proprietary Calculations Re Limitorque Thermal Lag Transient Analysis Inside Containment from Public Disclosure (Ref 10CFR2.790)Affidavit
ML20214W70321 November 1986Requests That Calculation X6CJH.37.1, Thermal Lag Analysis for Eaton Cable, Be Withheld (Ref 10CFR2.790).Affidavit Encl
ML20214E44018 November 1986Requests Withholding Encl Calculation X6CJH.49, Limitorque Thermal Lag Transient Analysis Inside Containment (Ref 10CFR2.790).DJ Stoker Affidavit Also Encl
ML20209E28031 October 1986Forwards Final Version of EGG-NTA-7403, Audit of Environ Qualification of Safety-Related Electrical Equipment for Vogtle Electric Generating Plant Unit 1, Informal Rept
ML20215N83729 October 1986Submits Application for Withholding Proprietary Info Re Verification of Flud Computer Code from Public Disclosure (Ref 10CFR2.790).Affidavit EnclAffidavit
ML20112C3406 March 1985Requests Withholding of Encl Addl Info Requested During Mechanical Engineering Branch 850108-10 Audit,Per 10CFR2.790.Affidavit of Cw Lacy Also Encl
ML20107B66831 October 1984Requests Proprietary Sample Calculation for Evaluation of Tornado Load Effects on Structures Be Withheld (Ref 10CFR2.790)Affidavit
ML20066A79520 October 1982Forwards Info Re Savannah River Plant Seismic Reflection Lines,Per Millet Fault Study 820914 Meeting in Bethesda,Md. W/O Encl
ML19310A15929 January 1980Confirms 800129 Telcon Re Possible Pipe Support Design Deficiency.Written Rept Will Be Filed by 800201 Covering Nature of Deficiency,Investigative & Evaluative Actions Taken.Investigation Should Take 90 Days