 Issue dateTitleTopic
ML19323C97115 November 2019Interim 10 CFR 21 Report for Masoneilan Model 8005N Transducer
ML19304B60731 October 2019Written Defect Notification for GE-Hitachi Stationary Primary Contact Finger Q0114C5382P002
ML19261A1946 September 2019Final Report (Log # 2019-22-00) (Event# EN 54215) - Non-Destructive Examination (Liquid Penetrant) Performance of Components by an Un-Qualified EmployeeNondestructive Examination
Liquid penetrant
ML18302A22819 October 2018Itt Enidine - USNRC 10CFR Part 21 Notification
ML18270A33526 September 2018Interim 10 CFR 21 Report for General Electric Hitachi (GEH) Relay Contact Cartridge DJ148C6159P001
ML17188A42226 June 2017Itt Enidine, Inc - Part 21 - Potential Transducer Component Defect
ML17124A7344 May 2017Final Part 21 Report for General Electric Hitachi Model AKR-2BE- 50 Breaker
ML17101A3647 April 2017Part 21 - Circuit Breaker Defect Discovered During Current Injection TestingUnanalyzed Condition
Fitness for Duty
ML16344A1189 December 2016Interim 10 CFR 21 Report for General Electric Hitachi Model AKR-2BE-50 Breaker
ML15243A17425 August 2015Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B
ML13213A28326 July 2013Closure of Part 21 Interim Report for Flowserve Four Inch Regulating Valve
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML13094A17718 March 2013Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf
ML12319A4739 November 2012Interim Part 21 Report for Flowserve Four Inch Regulating Value
ML12094A3712 April 2012Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations
ML12097A3162 March 2012Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition
ML12066A1182 March 2012Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations
ML0934301402 December 200910CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X
ML09076118811 March 2009Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs
ML04141044527 April 2004During Unpacking of Boxes for Palo Verde I SG I at Ansaldo Plant It Was Revealed That Some Tubes Had Been Damaged by Screws During Packing in Sandviken. During Sandvik Reinspection of Boxes at the Ansaldo Plant, Further Damaged Tubes Were F
ML03205005211 July 2003Response to NRC Letter Regarding Westinghouse Part 21 Reviews