Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20099D95517 April 2020Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive ExaminationsNon-Destructive Examination
Incorporated by reference
ML19269C53427 September 2019Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination TechniquesIncorporated by reference
ML19226A02319 September 2019Relief from the Requirements of the Asme Code Examination and Testing for Containment Unbonded Post-Tensioning System (EPID-L-2018-LLR-0132)Incorporated by reference
ML19161A2574 June 2019BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds15 February 2019Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping WeldsDissimilar Metal Weld
JAFP-18-0052, Proposed Alternative to Utilize Code Case N-87930 May 2018Proposed Alternative to Utilize Code Case N-879Nondestructive Examination
JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-88030 May 2018Proposed Alternative to Utilize Code Cases N-878 and N-880Nondestructive Examination
ML16308A02710 January 2017Relief from the Requirements of the ASME CodeBoric Acid
VT-2
ML15163A24915 September 2015Relief Request RR-14-01 Concerning Alternative Root Mean Square Depth Sizing RequirementsIncorporated by reference
Dissimilar Metal Weld
TMI-14-136, Response to Request for Additional Information - Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements19 November 2014Response to Request for Additional Information - Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements
ML13232A05128 August 2013Relief Request VR-01, Proposed Alternative Testing of the Pressurizer Pilot Operated Relief ValveStroke time
Power-Operated Valves
ML13227A00727 August 2013End-of-Interval Relief Request RR-12-01, Pressurizer Nozzle-to-Head Weld ExaminationsIncorporated by reference
ML13227A02415 August 2013Relief Requests PR-01, PR-02, and VR-02, Associated with the Fifth Ten-Year Inservice Test IntervalIncorporated by reference
Grace period
TMI-12-168, Submittal of Relief Requests Associated with the Fifth Inservice Testing (IST) Interval7 November 2012Submittal of Relief Requests Associated with the Fifth Inservice Testing (IST) IntervalGrace period
ML12121A63710 May 2012Request to Use Code Case N-789
ML11173047520 July 2011Fourth Inservice Inspection Interval Relief Requests I4R-02, I 4R-03, I4R-04, I4R-05, and I4R-06High winds
Weld Overlay
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Large early release frequency
Exemption Request
Dissimilar Metal Weld
TMI-11-017, Submittal of Relief Request RR-11-01 and RR-11-0210 February 2011Submittal of Relief Request RR-11-01 and RR-11-02Liquid penetrant
ML10293034721 October 2010Acceptance of Requested Licensing Action Request for Relief l4R-02, Fourth Inservice Inspection Interval, Alternate Risk Informed Selection and Examination Criteria for Pressure Retaining Welds
ML10264061323 September 2010Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief l4R-02, Fourth Inservice Inspection Interval, Alternate Risk Informed Selection and Examination Criteria forProbabilistic Risk Assessment
ML08309038829 October 2008Request for Relief 2008-TMI-01 to Utilize Code Case N-725
ML0527906606 October 2005Response to Request for Additional Information Request for Relief to Utilize Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI Division 1
ML04167051021 July 2004(TMI-1) Request for Relief from Flaw Removal, Heat Treatment, and Nondestructive Examination Requirements for the Third 10-Year Inservice Inspection (ISI) IntervalWeld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Dissimilar Metal Weld
ML0416701962 July 2004(TMI-1) Request for Relief (P5) for the Nuclear Service Closed Cooling Water (Nsccw) Pumps for Third 10-Year Inservice Testing (IST) Interval
ML03343050025 November 2003Additional Information Concerning a Proposed Alternative Associated with the Use of a Weld OverlaySafe Shutdown Earthquake
Weld Overlay
Operating Basis Earthquake
Dissimilar Metal Weld
ML03337095320 November 2003Additional Information Concerning a Proposed Alternative with the Use of Weld OverlayWeld Overlay
Dissimilar Metal Weld
ML0335602927 November 2003Additional Information Concerning a Proposed Alternative Associated with the Use of a Weld OverlayWeld Overlay
Hydrostatic
Finite Element Analysis
Code Reconciliation
Dissimilar Metal Weld
ML0335602943 November 2003Proposed Alternative Associated with the Use of a Weld OverlayWeld Overlay
Hydrostatic
Nondestructive Examination
Dissimilar Metal Weld
ML0323205485 September 2003Request for Relief from Selected Aspects of ASME Code.Incorporated by reference