ML23270B99329 September 2023Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary
ML21299A00328 October 2021and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code
ML21258A40821 September 2021Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of Boiling Water Reactor Vessel and Internals Project GuidelinesAging Management
EVT-1
CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)12 August 2020Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)Nondestructive Examination
Incorporated by reference
ML19254A60319 September 2019Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1
CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 131 January 2019Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Nondestructive Examination
Dissimilar Metal Weld
RBG-47913, Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021)30 November 2018Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021)VT-2
Pressure Boundary Leakage
ML18310A01316 November 2018Relief from the Requirements of the ASME Code to Use Boiling Water Reactor Vessel Internals Guidelines as an AlternativeVT-2
Incorporated by reference
Fuel cladding
EVT-1
ML18299A2737 November 2018Request for Relief from Requirements of Asme Code RBS-ISI-016 from the Requirements of the ASME Code for Pressure Retaining Welds in Control Rod Housings (EPID-L-2018-LLR-0042)VT-2
Incorporated by reference
Liquid penetrant
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4Incorporated by reference
Through-Wall Leak
Through-Wall Leakage
CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 117 November 2017Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1Nondestructive Examination
Finite Element Analysis
Through-Wall Leak
ML17138A14424 May 2017Relief from the Requirements of the ASME CodeIncorporated by reference
Scaffolding
Grace period
ML16096A2696 June 2016Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1Functionality Assessment
Liquid penetrant
CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D5 June 2015Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, DivisionLiquid penetrant
ML15071A14123 March 2015Relief Request No. VRR-RBS-2014-1 Regarding the Third 10-Year Inservice Testing IntervalScaffolding
Grace period
ML14127A32730 May 2014Relief Request RBS-ISI-019, Use of BWRVIP Guidelines in Lieu of Specific ASME Code Requirements for the Fourth 10-Year Inservice Inspection Interval)Incorporated by reference
Aging Management
EVT-1
ML13353A60828 January 2014Relief Request RBS-R&R-2013-001, Alternative to ASME Code Section III for Postweld Heat Treatment Exemption for the Third 10-Year Inservice Inspection Interval
ML13261A37924 September 2013Request for Relief RBS-ISI-018 for Reactor Pressure Vessel Support Skirt for the Second 10-Year Inservice Inspection IntervalIncorporated by reference
ML13038A63220 February 2013Request for Relief RBS-R&R-2011-001 from ASME Code Class 3 Table ND-4622.7(b)-1 Requirements for Post-Weld Heat Treatment Exemption of Valves, Third 10-Year Inservice Inspection IntervalStroke time
Condition Adverse to Quality
RBG-47301, Requests for Relief Request for Relief from ASME Boiler & Pressure Vessel Code Section III26 October 2012Requests for Relief Request for Relief from ASME Boiler & Pressure Vessel Code Section III
RBG-47284, Request for Relief from ASME Boiler & Pressure Vessel Code Section III20 September 2012Request for Relief from ASME Boiler & Pressure Vessel Code Section IIIStroke time
ML12235A30831 August 2012Relief Requests RBS-ISI-016 and RBS-ISI-017 Proposed Alternative to 10 CFR 50.55A Examination Requirements for Reactor Pressure Vessel Weld InspectionsHydrostatic
VT-2
Incorporated by reference
ML10173015730 June 2010Relief Request RBS-ISI-013, Use of Risk-Informed, Safety-Based Inservice Inspection Program Based on ASME Code Case N-716Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Incorporated by reference
ML1010601583 May 2010Second 10-Year Interval Inservice Inspection Program Plan Requests for Relief RBS-ISI-007, RBS-ISI-008, RBS-ISI-009, RBS-ISI-010, and RBS-ISI-011Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
RBG-46916, Requests for Relief from ASME Section XI Volumetric and Visual - Examination Requirements - Second 10-Year Interval29 May 2009Requests for Relief from ASME Section XI Volumetric and Visual - Examination Requirements - Second 10-Year IntervalVT-2
ML0903708986 March 2009Unit 3 - Request for Alternative CEP-ISI-012, Use Alternative Requirements in ASME Code Case N-753Nondestructive Examination
VT-2
Incorporated by reference
CNRO-2009-00001, Relief Requests for Third 120 Month Inservice Inspection Interval23 January 2009Relief Requests for Third 120 Month Inservice Inspection IntervalHydrostatic
Nondestructive Examination
VT-2
Scaffolding
ML08105058729 April 2008Relief Request PRR-RBS-2007-1 for Standby Service Water Pumps for the Third 10-Year Inservice Testing IntervalIncorporated by reference
ML07123004017 May 2007Request for Alternative RBS-ISI-005 Extending the Current Inservice Inspection Interval in Accordance with NRC Information Notice 98-44Probabilistic Risk Assessment
Incorporated by reference
ML0701200812 February 2007River Bend Station, & Waterford Steam Electric Station, Unit 3 - Request for Alternative CEP-PT-001, Visual Exam of Vent & Drain Leakage Tests (TAC MD1399, MD1400, MD1401, MD1402, & MD1403)Hydrostatic
VT-2
Incorporated by reference
ML06059017821 March 2006Relief, Request IST-2006-1, Use of Subsequent Asme/Om Code for Condition Monitoring Check ValvesIncorporated by reference
CNRO-2006-00010, Revised Request for Alternative to 10 CFR 50.55a Examination Requirements of Category B1.11 Reactor Pressure Vessel Welds8 February 2006Revised Request for Alternative to 10 CFR 50.55a Examination Requirements of Category B1.11 Reactor Pressure Vessel WeldsNon-Destructive Examination
Hydrostatic
CNRO-2005-00036, Request for Alternative to 10 CFR 50.55a Examination Requirements of Category B1.11 Reactor Pressure Vessel Welds24 August 2005Request for Alternative to 10 CFR 50.55a Examination Requirements of Category B1.11 Reactor Pressure Vessel WeldsNon-Destructive Examination
Hydrostatic
ML0521703322 August 2005Request for Relief from the Requirements of the ASME and Pressure Vessel CodeProbabilistic Risk Assessment
ML04357027421 December 2004ANO Units 1 and 2; Grand Gulf; River Bend and Waterford Unit 3Incorporated by reference
CNRO-2004-00073, Withdrawal of Relief Requests RBS-ISI-001, RBS-ISI-002, and RBS-ISI-00317 November 2004Withdrawal of Relief Requests RBS-ISI-001, RBS-ISI-002, and RBS-ISI-003
ML04119033028 April 2004Relief, from the Requirements of the ASME Boiler and Pressure Vessel Code, Section XI Concerning Check Valve Inservice Testing Program, MC1032Internal Flooding
Probabilistic Risk Assessment
CNRO-2003-00062, Request for Relief from ASME Section XI Volumetric Examination Requirements4 December 2003Request for Relief from ASME Section XI Volumetric Examination Requirements
ML03294060913 October 2003Request to Use Alternative Testing Frequency for Inservice TestingInternal Flooding
Probabilistic Risk Assessment
ML03239019026 August 2003Ltr. to M.A. Krupa ANO-1, Grand Gulf River Bend Station & Waterford Steam Electric Station, Unit 3, Request to Use American Society of Mechanical Engineers Boiler & Pressure Vessel (Code) Case N-663VT-2
Incorporated by reference
Dissimilar Metal Weld
ML03045004313 February 2003Relief, Main Steam Safety/Relief Valve Inservice TestingStroke time
Incorporated by reference
Power-Operated Valves
ML03030027629 January 2003Relief from Requirements of American Society of Mechanical Engineers Boiler & Pressure Vessel Code, Section XI, Concerning Check Valve Inservice Testing ProgramProbabilistic Risk Assessment
CNRO-2002-00053, Entergy Operations, Inc., Request to Use Alternate Testing Frequency for Inservice Testing Dated 11/22/200222 November 2002Entergy Operations, Inc., Request to Use Alternate Testing Frequency for Inservice Testing Dated 11/22/2002Probabilistic Risk Assessment