ML23256A088 | 25 September 2023 | Issuance of Alternative to Steam Generator Welds | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis |
ML23130A390 | 12 May 2023 | Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner | Coatings Through Wall Leak |
ML23118A076 | 1 May 2023 | Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML22096A003 | 18 November 2022 | McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations | Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal |
ML21343A200 | 20 December 2021 | Authorization and Safety Evaluation for Alternative from Certain Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code of Buried Service Water Piping (EPID L-2021-LLR-0014) (Non-Proprieta | Finite Element Analysis Design basis earthquake |
ML21305B829 | 23 November 2021 | Approval of Exemption from 10 CFR 55.47 - Waiver of Examination and Test Requirements | Job Performance Measure Exemption Request Fatigue Rule |
ML21029A335 | 16 February 2021 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | VT-2 Incorporated by reference |
RA-20-0045, RA-20-0045, Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior | 31 March 2020 | RA-20-0045, Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior | Foreign Material Exclusion Flow Accelerated Corrosion Thermal fatigue |
ML18124A305 | 9 May 2018 | Alternative for ISI-09 Regarding Reactor Pressure Vessel Shell Welds Fourth Ten-Year Inservice Inspection Interval | Hydrostatic Incorporated by reference License Renewal |
BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test | 23 March 2018 | Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test | Non-Destructive Examination Hydrostatic VT-2 Local Leak Rate Testing Thermal fatigue |
ML17331A086 | 26 December 2017 | Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads | Stress corrosion cracking Thermal fatigue |
BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination | 29 November 2017 | Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination | |
ML17230A274 | 10 October 2017 | Relief from the Requirements of the ASME Code, Section XI, IWA-4000 (Inservice Inspection Program Alternative ISI-07) | Weld Overlay Hydrostatic Stress corrosion cracking Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld |
ML17096A333 | 9 May 2017 | Verbal Authorization of Relief Request for Reactor Vessel Closure Head Penetration Nozzle N9 Repair | Non-Destructive Examination Weld Overlay Dissimilar Metal Weld |
ML16343A943 | 27 February 2017 | Relief from the Requirements of the ASME Code Section XI Inservice Inspection Requirements (Relief Request ISL-06) | VT-2 Incorporated by reference |
ML17038A552 | 16 February 2017 | Relief from the Requirements of the ASME Engineers Code for Operation and Maintenance for Inservice Testing Requirements (Relief Request VRR-06) | Power-Operated Valves Grace period |
ML100960547 | 30 April 2010 | Relief Requests RR-42, RR-43, RR-44, RR-45, for the Third 10-Year Interval Inservice Inspection Program Plan | Nondestructive Examination VT-2 Incorporated by reference Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML100491269 | 7 April 2010 | Relief Request (RR) Number RR-46 for the Third 10 Year Inservice Inspection Interval (TAC Nos. ME1249 and ME1250) | VT-2 Incorporated by reference |
ML082760752 | 19 November 2008 | Fourth 10-Year Interval Inservice Inspection Request Relief PT-02 for Proposed Alternative Inspection for Standby Gas Treatment System | Non-Destructive Examination Nondestructive Examination VT-2 Incorporated by reference Maintenance Rule Program Pressure Boundary Leakage |
ML082600075 | 4 November 2008 | Relief Request ISI-02 Regarding the Continued Use of the Risk-Informed Inservice Inspection Program | Probabilistic Risk Assessment VT-2 Large early release frequency Exemption Request Dissimilar Metal Weld |
ML070360418 | 12 February 2007 | Request for Relief No. RR-38 Regarding Pressure Testing of Drain, Vent, Test, and Fill Lines within the Reactor Coolant Pressure Boundary | High Radiation Area Hydrostatic VT-2 Incorporated by reference |
ML060890203 | 27 April 2006 | Request for Relief Request No. VRR-15 for Regarding Check Valves Related to the Third 10-Year Inservice Testing Program | |
ML060520051 | 23 February 2006 | Request for Relief No. 37. Revision 1, Regarding the Duties of the Authorized Nuclear Inservice Inspector | |
BSEP 05-0063, Relief Request VRR-15, Emergency Diesel Generator Service Water Check Valves | 26 May 2005 | Relief Request VRR-15, Emergency Diesel Generator Service Water Check Valves | |
ML050970131 | 21 April 2005 | Relief Request, Usage of Recent ISI Testing Requirements for Pressure Relief Device Testing | Incorporated by reference |
ML050680157 | 1 April 2005 | Relief Request, Use of Recent Inservice Testing Requirements | Incorporated by reference |
ML050530021 | 7 March 2005 | RR-34, CRD System Hydraulic Lines Structural Integrity (Tac No. MC5037 and MC5038) | Non-Destructive Examination Stress corrosion cracking Liquid penetrant Through-Wall Leak |
BSEP 03-0069, Withdrawal of Inservice Inspection Program Relief Request for Service Water System Piping Non-Code Repair | 12 May 2003 | Withdrawal of Inservice Inspection Program Relief Request for Service Water System Piping Non-Code Repair | Through-Wall Leak |
ML030860525 | 26 March 2003 | Request for Relief from Third 10-Year Interval Inservice Inspection Program Plan Request for Relief RR-31 | Weld Overlay Nondestructive Examination Incorporated by reference |
ML030700021 | 21 March 2003 | Relief ,Third 10-Year Interval Inservice Inspection Program Plan Relief RR-29 and RR-30 for Brunswick Units 1 & 2 | Incorporated by reference EVT-1 Unidentified leakage Thermal fatigue |
BSEP 02-0175, Inservice Inspection Program Relief Request - Service Water System Piping Through-Wall Flaw | 25 October 2002 | Inservice Inspection Program Relief Request - Service Water System Piping Through-Wall Flaw | Non-Destructive Examination Through-Wall Leak Through Wall Leak |