ML15316A51118 February 2015Calculation EP-EALCALC-PNPP-1401, Rev. 0, Perry Nuclear Power Plant - Radiological Effluent EAL Values.
ML15316A5125 December 2014Calculation EP-EALCALC-PNPP-1402, Rev. 0, Perry Nuclear Power Plant - Containment Radiation EAL Values.
L-14-245, Response to Request for Additional Information Regarding Request for Licensing Action on Alternative Accident Source Term Radiological Dose Calculations22 July 2014Response to Request for Additional Information Regarding Request for Licensing Action on Alternative Accident Source Term Radiological Dose CalculationsSafe Shutdown Earthquake
Abnormal operational transient
ML15316A51417 January 2014Calculation PRDC-0014, Rev. 5, Division 1, 125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation.
L-15-143, Revision 20 to Offsite Dose Calculation Manual13 March 2013Revision 20 to Offsite Dose Calculation ManualTime of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Power change
ML13123A21019 February 2013Enclosure B to L-13-138, Offsite Dose Calculation Manual, Revision 20 and Enclosure C, Process Control Program, Revision 12Safe Shutdown
Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Coatings
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML15125A12112 December 2012Revision 19 to Offsite Dose Calculation ManualTime of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Power change
ML12129A3091 May 2012Enclosure B, Offsite Dose Calculation Manual, Revision 18 and Enclosure C, Process Control Program, Revision 12Safe Shutdown
Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Coatings
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML15316A51315 September 2011Calculation PRDC-0015, Rev. 2, Addendum A03, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation.
ML11126A03116 December 2010Operations Manual, Offsite Dose Calculation Manual, Revision 18Safe Shutdown
Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Coatings
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
L-09-122, Calculation 0900354.301, Rev. 0, Flaw Evaluation for N6A and C Nozzle to Safe End Welds.25 April 2009Calculation 0900354.301, Rev. 0, Flaw Evaluation for N6A and C Nozzle to Safe End Welds.Finite Element Analysis
Dissimilar Metal Weld
ML09126022122 December 2008Enclosure B, Offsite Dose Calculation Manual, Revision 17Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Power change
L-08-349, Calculation for Contingency Flaw Evaluation Support6 October 2008Calculation for Contingency Flaw Evaluation SupportFinite Element Analysis
Dissimilar Metal Weld
L-15-257, Calculation PRDC-0015, Rev. 2, Addendum A02, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation.8 August 2008Calculation PRDC-0015, Rev. 2, Addendum A02, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation.Safe Shutdown
Cyber Security
Battery sizing
ML15316A51622 July 2008Calculation PRDC-0015, Rev. 2, Addendum A01, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation.
ML15316A51526 March 2008Calculation PRDC-0015, Rev. 2, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation.
ML06122040013 June 2005Operations Manual, Offsite Dose Calculation Manual, Revision 14Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Power change
ML04037014822 January 2004Calculation Addendum A-01 to Calcuation 2.4.6.14, Revision 0, Turbine Building Temperature Response to Steam Leaks, Calculation ComputationGOTHIC
ML04037014722 January 2004Calculation Addendum A-01 to Calcuation 2.4.6.14, Revision 0, Turbine Building Temperature Response to Steam Leaks, Table of Contents Through Gothic Output Data for 32.90 Lbm/Sec LeakTemporary Modification
ML03365037515 December 2003to PSA-039, PSA Assessment for ESW Pump a Unavailability.Mission time
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Earthquake
Fire Protection Program
ML03365037113 December 2003to EA-254, Emergency Service Water System Pump Shaft Coupling Failure Analysis.Finite Element Analysis
ML03365037421 October 2003to PERY-03Q-302, Linear Elastic Fracture Mechanics Evaluation of Cracked Pump Shaft Coupling.Finite Element Analysis
ML03365037226 September 2003to PERY-03Q-301, Stress Comparison Between a Properly Centered Coupling and an Off-Centered Coupling.Finite Element Analysis
ML03028051120 January 2003Supplement to License Amendment Request Pursuant to 10 CFR 50.90: One-Time 5 & Year Deferral of Type a Containment Integrated Leak Rate Test (TAC No.MB84695)Probabilistic Risk Assessment
Coatings
ML03115065629 May 2002Proposed Revision 7 to Perry Offsite Dose Calculation Manual. Revision Establishes M35 Drains as Release Point for Tritium & Establishes Required Sampling Frequencies for PointSafe Shutdown
Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Coatings
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Fire Protection Program
Power change