PY-CEI/NRR-2758L Calculation EA-254 Rev. 0 F
ly tne 4
NOP-CC-3002-01 Rev. 00 Page i CALCULATION INITIATING DOCUMENT (S)
CALCULATION NO.
[XI VENDOR CALC
SUMMARY
CRRA 03-05065-14 EA-254 TITLE/
SUBJECT:
Emergency Service Water System Pump Shaft Coupling Failure Analysis El BV1 I
El BV2 I
l DB l
PY Category 1
Active l
1 Historical El Study Classification l
Safety-Related/Augmented Quality i O Nonsafety-Related Open Assumptions?
[1 Yes 0
No If Yes, Enter CR Tracking Number N/A System Number:
P45 Asset Number:
1P45-COOIA Commitments:
None (Perry Only)
Calculation Type:
Referenced In Atlas?
El Yes No lReferenced In USAR Validation Database E] Yes ED3 No Computer Program(S)
Program Name Version / Revision Category Status Description ANSYS 6.1 (vendor)
(vendor)
General Finite Element Analysis Program P.C. Crack 3.1 98348 (vendor)
(vendor)
Crack Modeling program Excel (vendor)
(vendor)
(vendor)
Microsoft Revision Record Rev.
Affected Pages Originator/Date Reviewer/Date Design Verifier/Date ApproverlDate 0
All See vendor calculations 11/7/
See vendor calculations J,42/3?
Description of Change: New CaIc.
Describe where the calculation has been evaluated for 10CFR50.59 applicability. See Supporting Docs R03-01672.
Rev.
Affected Pages Originator/Date Reviewer/Date Design Verifier/Date Approver/Date Description of Change:
Describe where the calculation has been evaluated for 1 OCFR50.59 applicability.
Rev.
Affected Pages j Originator/Date Reviewer/Date Design Verifier/Date Approver/Date Description of Change:
Describe where the calculation has been evaluated for 10CFR50.59 applicability.
Rev.
Affected Pages Originator/Date Reviewer/Date Design Verifier/Date Approver/Date Description of Change:
Describe where the calculation has been evaluated for 10CFR50.59 applicability.
Footer
Page ii NOP-CC-3002-01 Rev. 00 INITIATING DOCUMENT (S)
CALCULATION NO.
[ )q VENDOR CALC
SUMMARY
CRRA 03-05065-14 EA-254 TITLE/
SUBJECT:
Emergency Service Water System Pump Shaft Coupling Failure Analysis TABLE OF CONTENTS SUBJECT PAGE COVERSHEET:
OBJECTIVE OR PURPOSE iii SCOPE OF CALCULATION iii
SUMMARY
OF RESULTS/CONCLUSIONS iii LIMITATIONS OR RESTRICTION ON CALCULATION APPLICABILITY iii IMPACT ON OUTPUT DOCUMENTS iii DOCUMENT INDEX iii CALCULATION COMPUTATION (BODY OF CALCULATION):
Page 1 ANALYSIS METHODOLOGY U
ASSUMPTIONS ACCEPTANCE CRITERIA COMPUTATION RESULTS CONCLUSIONS ATTACHMENTS:
ATTACHMENT 1: PERY-03Q-301 Stress Analysis Vendor Calculation review Form 1 page Calculation 20 pages Appendix A 1 page ATTACHMENT 2: PERY-03Q-302 Fracture Analysis Vendor Review Form 2 pages Vendor Calculation 28 pages Appendix A 3 pages Reference 5 Fracture and Fatigue Control in Structures 17 pages Reference 6 Properties of Stainless Steel Grade 416 4 pages Reference 11 Corrosion and Fatigue in Fe-Ni-Cr alloys by Markus Speidel 25 pages Reference 13 Atlas Fatigue Curves ASM 3 pages Reference 16 Stress Concentration Factors by R. E. Peterson 4 pages TOTAL NUMBER OF PAGES IN CALCULATION (COVERSHEETS + BODY + ATTACHMENTS) 108 Pages SUPPORTING DOCUMENTS (For Records Copy Only)
DESIGN VERIFICATION RECORD N/A Pages CALCULATION REVIEW CHECKLIST 2 Pages Footer
Page iii 5! teCALCULATION NOP-CC-3002-01 Rev. 00 INITIATING DOCUMENIT (S)
CALCULATION NO.
l[
X1 VENDOR CALC
SUMMARY
CRRA 03-05065-14 EA-254l TITLE/
SUBJECT:
Emergency Service Water System Pump Shaft Coupling Failure Analysis Attacment 1 11 Pages 10CFR50.59 DOCUMENTATION 2 Pages DESIGN INTERFACE
SUMMARY
2 Pages DESIGN INTERFACE EVALUATIONS N/A Pages OTHER Structural Integrity letter dated Nov. 17, 2003
Subject:
Crack Growth Periods 3 pages EXTERNAL MEDIA? (MICROFICHE, ETC.) (IF YES, PROVIDE LIST IN BODY OF CALCULATION)
El YES Footer
Page iv 6Wgey CALCULATION NOP-CC-3002-01 Rev. 00 INITIATING DOCUMENT (s)
CALCULATION NO.
X]J VENDOR CALC
SUMMARY
CRRA 03-05065-14 EA-254 TITLE/
SUBJECT:
Emergency Service Water System Pump Shaft Coupling Failure Analysis OBJECTIVE OR PURPOSE:
The purpose of this calculation is to capture Structural Integrity calculations concerning the failure analysis of the 1 P45-C001A pump shaft coupling.
SCOPE OF CALCULATION/REVISION:
The scope of this calculation includes a stress analysis of the pump shaft coupling and fracture analysis of the coupling performed by a vendor, Structural Integrity and Associates. Their vendor calculation numbers are PERY-03Q-301 and 302 respectively.
SUMMARY
OF RESULTS/CONCLUSIONS:
The stress analysis was performed for two configurations. CR 03-05056 investigation identified that the pump shaft had failed and subsequent evaluation found the shaft coupling sleeves were not installed correctly. The shaft coupling sleeves were installed in such a way that the key, that is approximately four inches in length and lies axially between shaft and coupling sleeve was only 3/4 engaged along its approximate 4 inch length. The results of the stress analysis indicate that the off centered coupling would experience an increase in peak stress at the key edge in the hoop direction of approximately 35.4 %.
It was concluded that the higher hoop stress, the susceptible material, and the corrosive environment all contributed to stress corrosion cracking and the resulting failure of the coupling.
The fracture mechanics calculation establishes the fracture toughness of the material at approximately 50ksi-Jin, develops an expression for stress intensity as a function of crack depth in the coupling sleeve, and establishes a likely crack growth rate based on industry data. From a graph of stress intensity verses crack depth, the model indicates that for a miss-installed coupling sleeve, a crack depth of 0.05 inches (for the full length of the coupling) results in failure. Fatigue is also addressed in the fracture mechanics evaluation. It is demonstrated that fatigue is not a likely failure mode based on the low number of starts experienced at the time of failure. The stress corrosion cracking growth rate supports the root cause failure mode of stress corrosion cracking.
LIMITATIONS OR RESTRICTIONS ON CALCULATION APPLICABILITY:
No limitations result from this calculation. This calculation simply addresses the existing design and the observed failure.
IMPACT ON OUTPUT DOCUMENTS:
No direct changes result from this calculation. However, the Design Engineer responsible for procuring new pumps and parts has been made aware of the results of this calculation. Additional corrective actions associated with the CR have been written to address both immediate and long term procurement requirements.
Footer
Page v CALCULATION
)
INITIATING DOCUMENT (S)
CRRA 03-05065-14 CALCUL EA-254 LATION NO.
I[ I VENDOR CALC
SUMMARY
TITLEI
SUBJECT:
Emergency Service Water System Pump Shaft Coupling Failure Analysis DOCUMENT INDEX z
C Document NumberlTitle Revision, Edition, Date 0c 1
Valve pump drawing 22 -0125-0000 2
LIIO 2
Pace Energy Coupling Field Dimensions N/A Attached to Reviewers' Comments L
El O
3 Pump Seismic Report McDonald Engineering 7/20/82 El1LI Report No. 454 "Seismic analysis of Vertical Pump" 4
Addendum 1 Pump Seismic Report McDonald 4/3/84 Engineering Report No. 454 5
Pump Shaft Field Dimensions NA Attached to reviewers comments El ED L
C 1
[1
=
[~~~~~~~~~~~
El
[
LIE~E El El LI
=I El El
[1
[1lC O
OO OILOLO
__________O O
OU
=~~~
~_
-O_-
Footer
Page 1 FirstEnergy CALCULATION COMPUTATION NOP-CC-3002-01 Rev. 00 CALCULATION NO.:
EA-254 TITLE /
SUBJECT:
Emergency Service Water System Pump Shaft Coupling Failure Analysis ANALYSIS METHODOLOGY See individual calculation. For stress analysis see Attachment land for fracture analysis see Attachment 2.
ASSUMPTIONS None ACCEPTANCE CRITERIA There is no acceptance criteria for this calculation. The objective is to perform a failure analysis of the coupling sleeve that supports the observed failure documented in CR 03-05065.
COMPUTATION See Attachments RESULTS See cover sheet or individual calculation attachment CONCLUSIONS See cover sheet or individual calculation attachment Footer
FirstEneWy DESIGN INTERFACE
SUMMARY
- PY Page 1 of 2 NOP-CC-2004-06 Rev. 03 DIS Rev.0 Document/Activity Evaluated: EA-254 Rev. 0 i________i PROGRAMS and PROCEDURES INTERFACES Required DIRC
[ DIE Section Topic Prepare DIE and forward to:
j No.
El N/A Maintenance Procedures Maintenance Support 01 N/A Operations Procedures Operations Procedures 02 El N/A Systems Programs & Procedures Responsible System Engineer 03 DESIGN INTERFACES Potential Interface Evaluated using DIRC (NOP-CC-2004-03) Rev:
El 1.0 ALARA BOP Element, DES El 2.0 Fire Protection/Safe Shutdown Applied Engineering Analysis Element, DES
[3 3.0 Equipment Qualification (3.1 - 3.10)
I&C Element, DES El 3.0 Equipment Qualification (3.5, 3.7, 3.11)
Structural/Mechanical Unit, DES E
3.0 Equipment Qualification (3.12)
BOP Element, DES E]
4.0 Human Factors I&C Element, DES El 5.0 Plant Security System Electrical Power Element, DES El 6.0 Seismic StructurallMechanical Unit, DES El 7.0 Pipe Rupture Applied Engineering Analysis Element, DES El 8.0 Internal Missile Hazards Applied Engineering Analysis Element, DES El 9.0 NSSS Design Basis NSSS Element, DES l _
10.0 Containment Vessel and Drywell Isolation Applied Engineering Analysis Element, DES
°_
11.0 Materials Compatibility/Chemical Control (11.1 - 11.10)
BOP Element, DES D
11.0 Materials Compatibility/Chemical Control (11.11 - 11.13)
Applied Engineering Analysis Element, DES E]
12.0 Control Room Habitability Applied Engineering Analysis Element, DES El 13.0 Mechanical Systems Mechanical Unit, DES El 14.0 Penetrations Structural/Mechanical Unit, DES El 15.0 Miscellaneous Structural Considerations Structural/Mechanical Unit, DES El 16.0 Heavy Loads Structural/Mechanical Unit, DES El 17.0 Electrical Systems Electrical Power Element, DES El 18.0 Instrumentation and Controls I&C Element, DES El 19.0 Simulator Simulator Element, PES El 20.0 In-Service Inspection (ISI)
ISI/IST Element, PES El 21.0 Piping and Pipe Supports Structural/Mechanical Unit, DES o
22.0 Hydrogen Control Applied Engineering Analysis Element, DES E
23.0 Lubricants BOP Element, DES El 24.0 Probabilistic Safety Assessment PSA Element, DES El 25.0 Plant Characteristic Parameters Reactor Engineering, Nuclear Fuels E
26.0 Motor Operated Valves ( 26.1 - 26.6)
Components & Material Unit, PES El 26.0 Motor Operated Valves (26.1 - 26.3)
Electrical Power Element, DES El 26.0 Motor Operated Valves (26.4 and 26.5)
Structural/Mechanical Unit, DES El 26.0 Motor Operated Valves (26.7 and 26.8)
Applied Engineering Analysis Element, DES El 26.0 Motor Operated Valves (26.9)
BOP Element, DES El 27.0 Plant Computers/Software Plant Computer Support Unit, PES o
28.0 Maintenance Rule, 10CFR 50.65 Maintenance Rule Element, PES El 29.0 Piping & Equipment Structural/Mechanical Unit, DES E]
30.0 Predictive Maintenance Predictive Maintenance Element, PES El 30.0 Predictive Maintenance (30.8)
BOP Element, DES El 31.0 Operations Impact Plant Operations Section El 32.0 Maintenance Engineering Maintenance Support Unit El 33.0 Component Engineering Component Engineering Unit, PES El Other:
ea Other:
_nts See Attached Comments
Comments: No DlEs are recommended. This calculation does not change design output documents. An ECP is necessary to change drawings and will receive the necessary interfaces. Therefore no procedure changes are necessary for this calculation. Plant maintenance procedures are being updated through corrective actions associated with CR 03-05065. The system Engineer will also be interfaced through the ECP process as well as operations if needed. Therefore, no interfaces are judged necessary at this time.
Prepared by:
(Print Name and Sign)
Supervisor Concurrence (Print and Sign Name) le]>,
Date C.
Flensbulrg MJ,
G w n < Z/3 t,1 111 / -3/4cliI
/,
2 e
~ Structural Integrity Associates ural & Materials N Reliabllty Technology, Inc.
November 17, 2003 SIR-03-152 GAM-03-004 3315 Almaden Expressway Suite 24 San Jose, CA 95118-1557 Phone:
408-978-8200 Fax:
408-978-8964 wwv.str~u tint.com gmiessi(structint.com Mr. Walter Cory Flensburg First Energy Corporation Perry Nuclear Power Plant 10 N. Center Road Perry, OH 44081-9514
Subject:
Perry Pump Shaft Coupling
Dear Cory:
Structural Integrity Associates (SI) is providing herein a summary of the study performed to evaluate possible crack propagation mechanisms that could have caused crack growth in the shaft coupling while the pump shaft was idle.
The results of the study presented on the following pages, indicate that the potential crack growth mechanisms considered are not likely to have contributed to any significant crack propagation when the pump was not operating.
Please do not hesitate to call if you require any additional information.
Very truly yours,
%/AgieMissi Senior Consulting Engineer ml Attachment cc:
PERY-03Q Austin, TX Charlotte, NC 512-533-9191 704 573-1369 Denver, CO N. Stonington, CT Pompano Beach, FL 303-792-0077 860-599-6050 954-917-2781 Rockville, MD Uniontown, OH 301-231-7746 330-899-9753
PERRY PUMP SHAFT COUPLING STUDY POSSIBLE ALTERNATE CRACK PROPAGATION MECHANISMS ACTING DURING PUMP IDLE TIME RESIDUAL STRESSES During pump standby conditions, in the absence of operational stresses, residual stresses, if present in the coupling, could potentially promote crack extension during pump idle conditions.
Potential sources of residual stresses have been considered.
Assuming the coupling is fabricated from previously cold rolled, heat-treated material, the coupling stock material is expected to be free of residual stresses before machining. Any residual stresses associated with the cold fabrication would be removed by subsequent thermal relaxation associated with the tempering process.
Residual stresses associated with the machining process could be another source of residual stresses in the as-installed shaft coupling. A review of open literature has resulted in the conclusion that machining-related residual stresses are expected to be locally as high as yield level. While these levels of residual stress are sufficient to drive crack extension, the depth of the machining-cold work-induced residual stresses is limited to a "few mils". Even aggressive, severe surface machining effects are attenuated within 10 to 12 mils beneath the machined surface.
It is concluded that residual stresses associated with machining processes, would not promote crack extension during pump standby conditions. This is further verified by the absence of surface cold work related cracking in a second, non-failed, coupling that had experience environmental and operational loading conditions similar to the coupling that failed.
OXIDE WEDGING During pump standby conditions, in the absence of operational stresses, the effects of "oxide wedging", if present in the coupling, could potentially promote crack extension during pump idle conditions. The potential effects the hypothesized mechanism of "oxide wedging" has been considered.
The concept of crack extension by "oxide-wedging" involves the formation of the tensile stress field at the tip of an active existing crack of sufficient level to promote crack growth. The wedging action is produced by the formation of solid corrosion products within the crack cavity where the volume of the oxide is greater than the metal consumed by the formation of the crack cavity. The result of the wedging action promotes a mechanical tearing at the yielding crack tip, and may contribute to crack extension.
Review of open literature [Ref. Pickering, Beck, and Fontana - 1962; Hudak, and Page - 1983:
and Cheng, and Potter - 1973] results in the conclusion that the mechanism of "oxide wedging" operates on a micro scale, and represents a localized residual stress condition with magnitude on Attachment to SIR-03-152 1
Structural Integrity Assocates
the order of approximately 20% to 30% of the applied stress intensities. The experimentally determined correlations of crack growth under cyclic or steady state applied loads, includes the empirical effects of oxide wedging. Further, the contribution from oxide wedging generally becomes increasing important as crack size decreases, thereby suggesting that it would be most significant during crack initiation and early growth of small cracks. Conversely, the contribution to crack growth (under applied loading) by oxide wedging becomes less important for pre-existing, established cracks.
It is concluded that the mechanism of "oxide wedging", as a stand-alone mechanism would not promote crack extension during pump standby conditions.
- HYDROGEN EMBRITTLEMENT Hardness levels above RC 40 are required for this mechanism to be a significant contributor. The Perry shaft coupling 416 S/S material was found to have measured hardness levels not exceeding RC 30. Hydrogen embrittlement is not considered to be viable contributor to crack extension during pump standby conditions.
CONCLUSION Responding to the question whether IGSCC crack propagation would be evident during pump standby or just during pump operation, three potential IGSCC initiation/propagation contributors were explored, and found to be insignificant contributors to crack propagation during pump standby.
Residual stresses associated with the initial fabrication methods would have a maximum expected depth of 6 to 8 mils. Only insignificant near-surface crack extension could be attributed to this effect.
Oxide wedging as a potential mechanism of crack extension is likewise judged to be insignificant. Likewise, hydrogen embrittlement is not considered to be a viable mechanism of crack extension during standby conditions.
It is also noted that another pump coupling, with operational time and environment similar to the failed coupling had no evidence of incipient crack initiation or propagation due to the considered mechanisms.
It is therefore concluded that no detectable crack propagation occurs during pump standby conditions. The IGSCC initiation and propagation resulting in the failure of the coupling happened fully during pump operation, without detectable contribution during pump standby conditions.
Prepared by:
Reviefved by:
Daniel Delwiche, PhD Attachment to SIR-03-152 2
Structural Integrity Associates
Page 1 of 2 FirstEyl CALCULATION REVIEW CHECKLIST CALCULATION NO. EA-254 REV. 0 NOP-CC-2001-04 Rev. 01 UNIT I QUESTION lNA Yes No COMMENTS RESOLUTION REFERENCES x
1 Does the stated objective/purpose clearly describe why the calculation is being performed?
- 2.
Are applicable codes, standards, design/licensing basis documents, etc., including edition and x
References included N/A addenda where appropriate clearly identified?
- 3.
Do the references reflect the appropriate revision?
x
=
INPUTS x
Vendor calc provides sketch with
- 4.
Are design inputs clearly identified and their source documents referenced, including revision critical dimensions level as appropriate?
- 5.
Are the design inputs relevant, current, consistent with design/licensing bases and directly x
applicable to the purpose of the calculation, including appropriate tolerances and ranges/modes of operation?
- 6.
Are all design inputs retrievable? If not, have they been added as attachments?
x
- 7.
Are preliminary or conceptual inputs clearly identified for later confirmation as open assumptions?
x ASSUMPTIONS x
- 8.
Have the assumptions necessary to perform the analysis been adequately documented?
- 9.
Is suitable justification provided for all assumptions (except those based upon recognized x
engineering practice, physical constants or elementary scientific principles)?
- 10. Are all assumptions for the calculation reasonable and consistent with design/licensing bases?
x
- 11. Have all open assumptions needing later confirmation been clearly identified on the Calculation x
cover sheet, including when the open assumption needs to be closed?
- 12. Has a Condition Report been issued for open assumptions if required?
x
- 13. Have engineering judgments been used?
x
- 14. Are engineering judgments reasonable and adequately documented?
x METHOD OF ANALYSIS x
- 15.
Is the method used appropriate considering the purpose and type of calculation?
- 16.
Is the method in accordance with applicable codes, standards, and design/licensing bases?
x IDENTIFICATION OF COMPUTER CODES (Ref: NOP-SS-1001) x Vendor programs used ANSYS
- 17.
Have the versions of the computer codes employed in the design analysis been certified for this and PC Crack, Excel application?
- 18. Are codes properly identified along with source, inputs and outputs?
x
- 19.
Is the code suitable for the analysis being performed?
x
- 20. Does the computer model, that has been created, adequately reflect actual (or to be modified) x plant conditions (e.g., dimensional accuracy, type of model/code options used, time steps, etc.)?
- 21.
Is the computer output reasonable when compared to inputs and what was expected?
x COMPUTATIONS x
- 22. Are the equations used consistent with recognized engineering practice and design/licensing bases?
- 23. Is justification provided for any equations not in common use?
x
- 24. Is the justification reasonable?
x
- 25. Have adjustment factors, uncertainties, empirical correlations, etc., used in the analysis been x
correctly applied?
- 26. Is the result presented with proper units and tolerance?
x
- 27. Has proper consideration been given to results that may be overly sensitive to very small x
changes in input?
Footer
Page 2 of 2 FirstJn~y CALCULATION REVIEW CHECKLIST CALCULATION NO. EA-254 REV. 0 NOP-CC-2001-04 Rev. 01 QUESTION l NA l Yes lNo l COMMENTS RESOLUTION CONCLUSIONS X
- 28.
Is the magnitude of the result reasonable when compared to inputs?
29, Is the direction of trends reasonable?
x
- 30. Are stated conclusions justifiable based on the calculation results?
x
- 31.
Are all pages sequentially numbered and marked with a valid calculation number?
x
- 32.
Is all information legible and reproducible?
x
- 33.
Have all changes In the documentation been initialed (or signed) and dated by the author of the x
change and all required reviewers?
- 34.
Have all calculation results stayed within existing design/licensing basis parameters?
x
- 35.
If the response to Question 34 is NO, has Licensing been notified as appropriate? (i.e. UFSAR or x
Tech Spec Change Request has been initiated).
- 36.
Does the calculation meet its purpose/objective?
x
- 37.
Has the calculation vendor used all applicable design information/requirements provided?
x
- 38.
Did the calculation vendor determine if the calculation was referenced in design basis documents x
and/or databases?
- 39.
Did the Preparer determine if the calculation was used as a reference in the UFSAR?
x
- 40.
If the calculation is used as a reference in the UFSAR, is a change to the UFSAR required or an x
update to the UFSAR Validation Database, if applicable, required?
- 41.
If the answer to Question 40 is YES, have the appropriate documents been initiated?
x
- 42.
Is the calculation acceptable for use?
- 43. What checking method was used to review the calculation? Check all that apply.
x
- spot check for math x
. complete check for math
- comparison with tests
- check by alternate method
- comparison with previous calculation Footer
Page 3 of 2 FBWt&e CALCULATION REVIEW CHECKLIST CALCULATION NO. EA-254 REV. 0 NOP-CC-2001-04 Rev. 01 UNIT I QUESTION I NA I Yes I No I COMMENTS RESOLUTION Review Summary: In addition to the above the following have been completed also:
NOP CC-3002 Rev. 0, Section 4.7.4 Owner Acceptance
- 1. Calc No. Obtained from Admin; EA-254
- 2.
Prepare Calculation Cover sheet; Complete
- 3. Prepare Calculation review checklist; Complete
- 4.
Indicate how No answers were resolved; None identified
- 5. Include Checklist as supporting documents to Calculation; Complete
- 6.
Information required by Section 4.7.2; final calculation includes inputs, references, and methodology used to perform the calculation, summary of results of the calculation, list of assumptions, limitations, follow up on assumptions, and a copy of the vendors Design Verification Record. Discrepancies with inputs have been resolved. Inputs sent electronically have been rechecked during the analysis phase. The vendor has redrawn the coupling and dimensions were re-verified.
Transmittal documents are attached to this Owner's Acceptance. 10CFR50.59 has been included in supporting documents.
- 7.
Complete DIS per NOP CC 2004. DIS with supporting documents. Complete
- 8. Issue DIEs; Note corrective action issued per CR 03-05065 to revise procurement documents and pump drawings.
- 9. Revise Design Basis per NEI - 801. Design basis, engineered spare parts list orDesign basis will be changed through the ECP process when drawings are updated.
- 10. No calculations provided input to this calculation and no output was provided to calculations from this calculation.
- 11. Calculation coversheet completed.
- 12. DIS is contained in the Supporting documents.
- 13. Print the name of the vendor who originated the calculation in the originator block of the calculation.
- 14. Print name, sign, and date to this Calculation Review Checklist contains the design inputs transmitted to the vendor as well as question and answers during calculation development.
El Technical Review Z Owner's Acceptance Review (Required for calculations prepared by a vendor)
Reviewer (Print and Sign Name)
Date Owner Acceptance Re wer:
rint and Si n Name)
Date C. Flensburg Ro/
1mpl3 011/7/03 Approver: (Print and Sign Nam Date At e
m
\\¢O6 X
Z2/
Footer
Walter C. Flensburg To: amiessi@structint.com 09/11/2003 09:42 AMcc:
09/11/2003 09:42 AM
Subject:
Pump Shaft Dimensions Rev. 1 There is a revision to the attached dimensions. The necked down region should be 1.562 not 2.562 as shown in the sketch.
Cory Flensburg
Forwarded by Walter C. FlensburgfCEI/FirstEnergy on 09/11/2003 09:52 AM -----
Walter C. Flensburg To: amiessi@structint.com 09/11/2003 09:10 AM cc:
Subject:
Pump Shaft Dimensions Angah:
Attached are the pump shaft end dimensions. If more dimensions are needed please provide a sketch so that we give you exactly what is needed.
- Thanks, Cory Flensburg 440 280- 7363 Pump Shaft DimensionsOO01
p.~ V-t.~
m Wf j
1' O il-L 10 u q1 f2f9 3 C\\-
I.
k-A-11 5shoa /we-
/?, 5,& I.7ee IV, 1,3 A tIf
Walter C. Flensburg To: amiessi@structint.com 09/09/2003 03.19 PM
Subject:
Perry Failed Coupling Design Inputs Angah:
Attached is the Addendum # I to the Seismic Report. Portions of the Rev 0 report sent in Acrobat File are superceded by this information.
Cory Flensburg Addendum 1 Seismic ReportOOO Addendum 1 Coupling ArrangementOOC
.\\
P b
@ 1 1.
C&4Pu~
P~ c16 QC I
90
.030 x 45' TYP.
1'
-- 11.191 +/-.005 4.443 +/-.005 1 t t04.002 i.002 2.9715 +/-.0025 02.689 +.002/-,00 wo~~~~
I STAMP THIS SURFACE (LOW STRESS DIE) WJITH-/
PACE ENERGY MFG.'S LOGO AND CODE NUMBER.
e_ __
S///X///
5/16-18 UNC 2B 2 PLACES TYP.
.170 +/-.015 x 45-TYP.
- NOTES,
- 1. MATERIAL TO BE IN ACCORDANCE WITH ASTM A582, TYPE 416 (UNS S41600), CONDITION 'T', (248 TO 302 HARDNESS HB).
- 2. ALL DIMENSIONS ARE IN INCHES.
- 3. 125 MICRO ALL OVER UNLESS OTHERWISE INDICATED.
- 4. BREAK ALL SHARP EDGES.
- 5. ALL TAPPED HOLES TO BE CLEANED AND FREE FROM BURRS.
- 6. SPECIFICATIONS; 10CFR21, IOCFR50 APPENDIX 'B', ANSI N45.2, AND NQA-I APPLY TO THIS ITEM.
f 1 1 If n ^PACE ENERGY, INC.
_________I
_WA_
I NI-I WN
, 0P L I
I lu I
tLpi mr 4-N
~ I I
- xxx
+ J.
JD 1"
HALF 1
AS NOTED I
I I 9/3/03 1 DRAVN f40H SKETCHS I'
9/3/03 A
_. nn I I
iE
~
SHA"C30393 I. -
I
& ad kt1kdA-I
~~~iIt)
"I v}
sW-/
AD.
PERRY NUCLEAR POWER PLANT cteZ1A
- d.
o.C C
22
-a
-12 5-0dI2 1i i
Z'F
-7§s..Cl2 z-02-002 G
.5:Z1REE
at A$'t4-l Comments on Structural Integrity Stress Analysis File N. PERY-03Q-301
- 1. Objective The objective states "stress analysis will be done for the properly centered and off-centered pump shaft coupling assemblies then perform stress analyses to evaluate the impact of the misalignment on the coupling."
a) Comment:
A table is presented for the maximum component stresses in Section 5 but there is only a single table presented in section 5.2 for primary stress comparison. Is this single table the centered or off-centered configuration.
- 2. Finite Element Model a) Fig. 9, the stress distribution is noted as 'Overall Hoop Stress Distribution". Is there a particular plane through which this hoop stress is taken in the coupling or is it the peaks at any location in the coupling in the hoop direction. It is assumed that the range of stresses (on the right side of Fig 9) are for the coupling not the shaft or key.
b) Fig. 13, provide a general explanation of what this figure is and how it is used.
- 3. Material properties a) Is there more explanation needed with regard to tempering of the coupling and effects on properties? As discussed previously, the key may be in either the annealed or temper condition.
- 4. Analysis a) Add a note that states how the torque is applied to the shaft and that resulting localized effects in the shaft far enough away (provide basis) from the shaft coupling area of concern so as not to influence results.
5.0 Results and Conclusions a) Explain why only tensile stresses are shown.
5.2 Primary Stress Comparison to Allowables a) Change reference 2 to 3 b) The first stress comparison table:
The split ring axial stress is 21,580 psi and includes seismic source addendum 1 to ME 454 Key shear stress is 12491 no seismic source addendum 1 to ME 454 Shaft stress intensity is 21,882 does this include seismic? Note, after further review it has been discovered that the summary sheet in the seismic report sent to you is for a smaller pump. A page by page review of my E-mail has found that the summary is the wrong one and the correct stress can be found on page 21 of the report you have and the value is 29,155 psi.
Do the ANSYS results include the seismic and deadweight contribution? If not, does the comparison have any meaning?
Also which configuration is this, the centered or off-centered? Please supply both configurations.
Can you supply a little more detail as to how the finite element numbers are determined from the output?
Please provide a conclusion with the calculation
8 fit~
tf~-
k-rtc.
I General Comments on Preliminary Sleeve Analysis Results:
Peak Stress This stress will always exist due to the discontinuity at the corner. What is the industry standard for addressing the finite element stresses at this location? T4V C
'-And O-,n e
tAr4,,
4
~~~~L -Ie Ss% v
, *t-tS}'
P~~
3a),
P eps 6f rzto Is there a strain criteria?
)
Is there a concern with the existing design and operating systems? (Pumpgrebuilt in Spring of 2003 and PumpA just rebuilt in Sept. 2003)
- Kg E h Resultant Stress L
How will stress results be combined?
-8LJ 4 V Other What was the final torque value used in the analysis?
t Be
/
What is the orientation of local and global coordinate system in the model?
4 #
+ 76< 's° The key may be in the annealed condition will this impact the analysis?
S f~~~~~-
(4&
e -v,
5tq I
tp
--e Lf At~
4 Yw c8Že t ts AdM~)4~
di Se, ai, X
)-t a,46t, 4 1K A
h+ L( 5 I/
_- / I S -,
.X
}
}
F~2& tu aI'4-7 A
"JtL
-a
-'-Y Fit&<
4 By b
l SS)'
19~- k4
- IQ,O UH I[ O j qka
\\Ni
°A, l
V@,,~
iw0J lq5 t11 S
14,>
ailV/
N
Deom t o
-nruAysfNm Al C Comments on Fracture Analysis of a Normal Coupling P&,5,t set 1.0 Objective hi A
1 Why is only the normal configuration discussed? Nor6ct 6
7 2.0 Finite Element Analysis
- 1. At the end of the first paragraph, could we state that the purpose of the second model is to show the relative influence of crack length on the calculated stress intensity and crack depth. As shown in Figure 12 a best fit curve of the calculated K at various crack depths lies in between the assumed crack lengths therefore, the length of the crack is not critical. Therefore, when a crack radial depth is specified in the remainder of this report, the crack length is the full length of the coupling. In your words....
AND
- 2. 4th paragraph what is the thickness. You report t = 0.3451 We get around.37 4.000 - 2.974 = 1.026 and 1.026 -
.6545 =.3715 Note that your Table 2 Note 1 has 0.37 G;24ck(- is4A 9b V
3.1 Stress Intensity Factor Determination
- 1. Ist paragraph.. In the root cause report I added the words below with respect to the set screws. The reason I am bringing it up is that Figure 11 may be impacted so some qualifying words may be in need.
I~V II I3.2 Fracture The initial investigation observed that the set screws in the improper configuration could be a significant contributor to the failure of the coupling. It was later determined that the set screws play an insignificant role.
The reasoning is as follows. The set screws are required to be snug tight and lock wires are connected between the two set screws to prevent rotation out of the coupling. A snug tight condition is expected to present a small increase in load relative to the applied torque presented from the motor. If the set screws were substantially torqued, the effect on the coupling would be to increase local stresses in the area of the threaded hole in the coupling. This is because the tight fit between shaft and coupling restrict the relative displacement between the two components. Thus the resulting stress from the set screw will remain local to the point of applied load. Additionally, metallurgical testing has confirmed that crack initiation took place at the short end of the coupling away from the set screw hole. Therefore, the set screw is not modeled in the finite element analysis as it will have little effect in end of the coupling where the crack initiated. Stresses at the critical keyway locations will be determined for these two models and used for the fracture mechanics evaluation in Task 2.
3Toughness
()
- 1. First paragraph: The fracture toughness, Kic, is the critical value of the stress intensity factor Ki at which brittle fracture is predicted to occur. Kic can be considered a material constant in a given metallurgical condition and under given conditions of temperature and loading rate. Thus Kic for a given material can be measured in a laboratory. If the calculated stress intensity, KI, based on the components geometry, stress and crack size exceed the fracture toughness, Kic, then brittle fracture will occur. Explicit values of Type 416 steel are not available, however, bounding values may be established based on similar materials. Reference 4.....
2 second paragraph could you please submit a copy of the Rolfe and Barsomn applicable reference pages. Also I could not get the units to balance in the formula as written.
L* we 73 third paragraph Please submit applicable reference 6 data with final calc.
24.Third paragraph add a summary statement.. Therefore the fracture toughness assumed in this analysis is......
3.3.1 Material Test....
"1.
Second to last paragraph the 10-12 % solution of sodium... Add solution 3.3.2 Stress Corrosion Crack Growth
- 1.
What is a 12 Cr steel? Is this a type 420? Can you add a discussion as to why this is applicable to type 416.
- 2.
Figure 6 do we need tI know loading rate, type of stress uniform or residual stress field through which the the figure was developed? Is tere a quotable or reference ASTM spec for development of the curve?
- 3.
Add a conclusion tothe paragraph. Therefore, the IGSCC crack growth rate is conservative or bounding for our case because....
/
/7 6L 4qI( A,Ž~ t 6z 1, T-IJ -4
,1/4eA0-4
Pa- ;I I,Oil 3.3.3 Fatigue Crack Growth Z-'-Z You lost me here and the applicability of this curve, Figure 7. Also the stress intensity range is low. What is meant by the upper bound of the curves? Please add a concluding statement.... Therefore this crack growth rate is applicable to Perry because....
4.1 Stress Intensity Factor Results
- 1.
Change Figure 9 to Figure 11 and Figure 10 to 12
- 2.
Second to last sentence.. factors remain the approximately.. remove the
- 3.
Please note the set screw discussion above with respect to ignoring the stress in the coupling t-.
4.2.1 Stress Corrosion Crack Growth Results 1st sentence as shown in Figure 11 shoy It is be figure 6
- 2.
1000 x 2.24x10-4 in/hr =.224 inches vA7227 also 2.047 @ 9140 hours0.106 days <br />2.539 hours <br />0.0151 weeks <br />0.00348 months <br /> vs 2.077
- 3.
Is the time duration here independent of rating stress or residual stress or will they add to the growth rate?
4.2.2 Fatigue...
A
- 1.
Could you explain if Figure 7 is used in this section if so how?
5.0 Conclusions
- 1.
Third paragraph thel 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> will change if you agree to change the thickness to.37 vs.3451
- 2.
Fourth paragraph Add more explanation as to wh tIe fatigjue failure is less probable? Is this based solely on the number of starts?
-V ivow cA
- 3.
Last recommendation Do you have any sefggestions or guidance that relates radii to stress intensification that can be added to the report and that I could share with the vendor?
Tables #2 Does 1 start = one cycle Figures:
- 6 Identify stress field or ASTM spec under which curves are developed
- 7 How is this low stress intensity range data applicable to the stress seen during one cycle ?
!N
'D- %-
>-D z
-Vt c
&o g j( 0c5 'f c 6 OF
de ACPlLt..
Telecon With: Structural Integrity, Dan Delwiche, Angah Miessi By: C.Flensburg
Subject:
Fracture Mechanics Questions Calculation Pery-03Q-302 Date: Oct. 10, 2003 This teleconference was in response to questions that had resulted from the review of the subject calculation.
- 1. Why is use of Figure Figure 6 for 12 Cr steel appropriate for type 416 material?
Europeans in the late 60's and 70's developed the curve to be applicable to type 403/410/ and 416 stainless steels that were martensitic An alloy of 12 Cr and.2 Carbon was identified as fully martensitic and the curve used in figure 6 was developed by Markus Spadel (spelling?)a recognized leader in the field. The curve is considered a dead ringer for 410 SS but also is applicable to 403 and 416 SS. Historically, 410 SS is used in turbines and 416 is used in free machining applications. The high sulfur content in 416 makes the material easier to machine. Therefore, minor differences exist but the martensitic family behaves relatively the same. Martensitic material strength and resistance to corrosion are greatly affected by heat treatment. A heat treatment to 200-300 degrees C (392-572 degrees F) produces high strength but also leaves the material highly susceptible to stress corrosion cracking (SCC). Tempering to 650-750 degrees C (1170-1382 degrees F) leaves the material weaker but more resistive to SCC.
Fatigue which in our case is small for a small initial defect Pitting followed by stress corrosion: The pits allow a site for stress corrosion cracking to initiate. The pit is likely the result of the sodium hypochlorite attack of the susceptible material. How fast the pits form is a is a function of time and the ability of the crevice to accumulate sufficient free chloride to begin the process.
Temperature heat treat condition affecting sensitivity of the material All these conditions impact the life expectancy of the coupling sleeve which in turn affect the use of Figure 6.
- 3.
Recommendation for what is installed It was explained that B pump had been reworked in April 2003. The recommendation was to obtain the chemistry and heat treatment of what is installed and supply a qualitative argument for what is installed for both both A, B, and C pumps.
It was stated that there were no known failure of couplings however an industry search should be made and arguments presented.
- 5. Failed Coupling It was explained that our coupling that failed, if tempered at 575 deg. C (1067 deg. F), would be right on the edge of bad things happening. The "bad actors" in order of importance are:
Carbon Content the higher the carbon the more martensitic the material becomes and the greater the sensitivity to tempering..15 % Carbon presents a greater risk to SCC.
dogc Aw-e~t-elfl.-
I Mn (manganese) presents lesser effect than carbon Cold Working causing a localized increase in hardness. There is a strong correlation to hardness and SCC If hardness is on the order of 30 you are asking for trouble.
- 6. CaIc. Comments on Figure 7 In the review it was noted that the stress intensity range was low for the fatigue curve used in the analysis at the levels of stress intensity that exist. Angah indicated that another curve had been found that is more applicable to our situation. The new curve is less steep therefore the results as reported in Table 2 should increase in cycles for the initial crack. Therefore the results as presented are overly conservative.
All other comments had been verbally responded to in a previous phone call with Angah Miessi.