Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23205A234 | 6 July 2023 | Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling' | Surveillance Frequency Control Program |
ML20302A221 | 27 October 2020 | TSTF-581-T, Replace References to RG 1.182 with RG 1.160 | Ultimate heat sink Tornado Missile Water Inventory Control Internal Flooding Missed surveillance Turbine Missile |
ML20302A220 | 27 October 2020 | TSTF-573-T, Correct RPS Bases for MSIV and TSV Functions | Reactor Vessel Water Level Test box Scram Discharge Volume Feedwater Controller Failure |
ML20302A219 | 27 October 2020 | TSTF-562-T, Bases Clarification for TS 3.8.1, Required Actions B.3.1 and B.3.2 | Post Accident Monitoring Condition Adverse to Quality Offsite Circuit |
ML20302A218 | 27 October 2020 | TSTF-561-T, Bracket LCO 3.5.1 LCO Note in the ISTS | |
ML20302A217 | 27 October 2020 | TSTF-558-T, Clarify SR Bases Added by TSTF-523 | Stroke time Surveillance Frequency Control Program |