Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22207A04925 July 2022Information Request, Security IR 2022402
NLS2021035, Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 310 May 2021Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 3Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Fire impairment
Severe Accident Management Guideline
Minimum staff
Fire Protection Program
NLS2016063, Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version)27 October 2016Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version)
ML16285A32512 October 2016ROP PI Frequently Asked Questions (Faqs): 14-02
ML16125A5224 May 2016FOIA/PA-2016-0455 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
ML15231A36427 May 2015FOIA/PA-2014-0204 - Resp 1 - Final, Group a
ML15014A15314 January 2015Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process
ML15014A16014 January 2015Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process
ML14314A51213 November 2014Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting
ML14051A38820 February 2014NFPA 805 Fpra F&O Tables
ML14051A39720 February 2014NFPA 805 IE PRA F&O Tables
LIC-13-0140, Attachment 3 - Strategy to Protect Fort Calhoun Station from Beyond Design Basis Flood - Redacted26 October 2013Attachment 3 - Strategy to Protect Fort Calhoun Station from Beyond Design Basis Flood - Redacted
ML13253A35327 September 2013Enclosuinformation Sheet, National Cancer Institute Study of Ft. Calhoun Area
ML13273A30519 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 8 of 21Arc flash
ML13273A30319 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 6 of 21
ML13273A30719 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 9 of 21
ML13273A30819 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 10 of 21
ML13273A30919 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 11 of 21
ML13273A31019 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 12 of 21
ML13273A31119 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 13 of 21
ML13273A31319 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 14 of 21
ML13273A31519 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 15 of 21
ML13273A31619 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 16 of 21
ML13273A31719 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 17 of 21
ML13273A31919 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 18 of 21
ML13273A32219 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 19 of 21
ML13273A32319 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 20 of 21Safe Shutdown
Hydrostatic
Fukushima Dai-Ichi
Earthquake
ML13273A32419 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 21 of 21Hydrostatic
ML13273A32619 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group C, Records Being Released in Part
ML13273A30419 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 7 of 21
ML13273A30219 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 5 of 21
ML13273A30119 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 4 of 21
ML13273A30019 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 3 of 21
ML13273A29819 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 2 of 21
ML13273A29719 September 2013FOIA/PA-2012-0235 - Resp 1 - Partial. Group a, Records Being Released in Their Entirety. Part 1 of 21Safe Shutdown
Boric Acid
Fitness for Duty
Ultimate heat sink
Fire Barrier
Time to boil
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Significance Determination Process
B.5.b Mitigating Strategies
Earthquake
Backfit
ML13203A00523 July 2013Exigent Local Proposed Notice of Consideration of Issuance of Amendment, Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile ImpactSafe Shutdown
Tornado Missile
Tornado-Generated Missile
ML13191A06918 June 2013G20130515/LTR-13-0597-Ticket - Senator Harry Reid Ltr Constituent Correspondence - Possible Storm Damage to America'S Nuclear Power Plants - Fort Calhoun (Alfredo Hannenberg)
ML13143A3316 June 2013Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2
ML13109A29320 December 2012G20120458/EDATS: OEDO-2012-0390 - Attachment 4
ML13109A27120 December 2012G20120458/EDATS: OEDO-2012-0390 - Attachment 1
ML12352A24017 December 2012G20120458/EDATS: OEDO-2012-0390 - Ft. Calhoun Containment Structure Failures
ML12352A27416 December 2012G20120458/EDATS: OEDO-2012-0390 - Additional Comments from 2.206 Petitioner W.Taylor
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML10193046025 March 2010List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants
ML1003306018 February 2010Compression Test of Concrete, 4000 Psi
ML09335075114 January 2010Temporary Instruction 2515/180, Managing Fatigue
ML1003413138 January 2010Compression Test of Concrete, 3000 Psi
ML0911802479 March 2009Enclosure 5 - FAQ LogTime of Discovery
High winds
Mission time
Water Inventory Control
Significance Determination Process
ML0921105896 March 2009Nebraska Game and Parks Commission Species by County List
ML0917606544 April 2008CNS Lr - Air Pollutants and Control Techniques - Particulate Matter, Control Techniques, EPA