SCH09-139, New Jersey Pollutant Discharge Elimination System - Discharge Monitoring Report for November 2009

From kanterella
Jump to navigation Jump to search
New Jersey Pollutant Discharge Elimination System - Discharge Monitoring Report for November 2009
ML093650153
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/21/2009
From: Braun R
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation, State of NJ, Dept of Environmental Protection, Bureau of Permit Management
References
SCH09-139, FOIA/PA-2011-0113
Download: ML093650153 (38)


Text

PSEG Nuclear L.L.C.

P.O. Box 236, Hancocks Bridge, NJ 08302 0 PSEG NuclearL.L.C.

DEC 2 1 2009 N

SCH09-139 CERTIFIED MAIL RETURN RECEIPT REQUESTED ARTICLE NUMBER: 7008 0150 0000 5749 4376 Department of Environmental Protection Division of Water Quality Bureau of Permit Management P.O. Box 029 Trenton, N.J. 08625-0029 NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM-....-.-..-.

DISCHARGE MONITORING REPORT SALEM GENERATING STATION NJPDES PERMIT NJ0005622

Dear Sir:

Attached is the Discharge Monitoring Report for the Salem Generating Station for the month of November 2009.

This report is required by and prepared specifically for the New Jersey Department of Environmental Protection (NJDEP). It presents only the observed results of measurements and analyses required to be performed by the above agencies. The choice of the measurement devices and analytical methods are controlled by the EPA and the NJDEP, not by the company, and there are limitations on the accuracy of such measurement devices and analytical techniques even when used and maintained as required. Accordingly, this report is not intended as an assertion that any instrument has measured, or that any reading or analytical result represents the true value with absolute accuracy, nor is it an endorsement of the suitability of any analytical or measurement procedure.

Please note, a dye test was performed on November 17 th & 1 8 th, 2009. The summary of results is also attached.

If you have any questions concerning this report, please feel free to contact Bob Bernard (856) 339-1636.

Robert C. Braun Site Vice President - Salem

DEC 2 1 2009 Attachment (12 DMR's & Dye TestResuits)

C Executive Director, DRBC USNRC - Docket numbers 50-272 & 50-311

JEC 2 1.2009 EXPLANATION OF CONDITIONS November 2009 The following explanations are included to clarify possible deviation from permit conditions.

General - The columns labeled "No. Ex" on the enclosed DMR tabulate the number of daily discharge values outside the indicated limits.

Data reporting and accuracy reflect the working environment, the design capabilities and reliability of the monitoring instruments

-and operating equipment. ..

Deviations from required sampling, analysis monitoring and reporting methods and periodicities are noted on the respective transmittal sheet.

Results reported on the Discharge Monitoring Report forms are consistent with permit limits, data supplied from contract laboratories, the December 1993 revision of the NJDEP DMR Instruction Manual and specific guidance from DEP personnel.

DEC 2 1 2009 EXPLANATION OF EXCEEDANCES November 2009 The following exceedance(s) are included in the attached report and explained below.

DSN No. EXPLANATION None.

DEC 2 12009 SALEM COUNTY OF STATE OF NEW JERSEY I, Robert C. Braun of full age, being duly sworn according to law, upon my oath depose and say:

1. I am the Site Vice President - Salem for PSEG Nuclear, and as such am a...*-1ith.6*roizea to -si~gnS51em's*§DDisliaghitý'dMifbihn'iReýoWrts-ubmitted to-the New Jersey Department of Environmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination System permit.
2. I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.
3. The signature on the attached Discharge Monitoring Reports is my signature and I am submitting this affidavit in satisfaction of the requirement that my signature be notarized.

Robert C. Braun Site Vice President - Salem Sworn and subscribed before me this

'- day of December 2009 I

SHERI L KEYES Commission #2051967 Notary Public, State of New Jersey My Commission Expires January 15, 2014

DEC 2 1 2009 BC Site Vice President - Salem Director - Regulatory Affairs John Valeri Jr., Esq.

Salem Radwaste and Environmental Supervisor E. J. Keating Helen Gregory Chem File SCH09-139

Maplewood Testing Services 200 Boyden Ave, Maplewood, NJ 07040 tel: 973.761.1981 O PSEG PowerLLC TO: William G. Biggs November 20, 2009 Technical Analyst Report No. TP09066 Salem Chemistry - PSEG Power SUBECT: . DETERMINATION OF"CIRCULATING-WA-TERFLOW AT SALEM GENERATING STATION UNIT 1 CONDUCTED.BY: .... .. Victor Simpson ............. ---

Sr. Test Engineer, Maplewood Testirig-Servid ...

SUMMARY

The Mechanical Division of Maplewood Testing Services conducted a series of test runs at Salem Unit No. I to determine the capacities of the circulating water pumps shown in the table below.

Work was performed under SAP work orders:

30171093, 30171169, 30171094, 30171095, 30171161, 30171096 Please note that the CMS designation for the pump in 11A could not be determined.

Final results are as follows:

SUMMARY

OF TEST RESULTS Pump CMS Test Measured Pump Pump Total No. Pump Date Pump Suction Discharge Static Desig. Capacity Head Head Head

-... (gpm) (ft h2o) (ft h2o) (ft h2o) 11A  ? 11/17/09 159598 -6.0 18.3 24.3 11B H 11/17/09 159364 -5.9 18.8 24.7 12A C 11/17/09 144053 -8.8 18.9 27.7 12B K 11/18/09 155878 -7.5 18.3 25.8 13A D 11/18/09 162400 -6.9 19.8 26.7 13B J 11/18/09 151199 -6.1 17.9 24.0 Note: Pump suction heads and discharge heads corrected to elevation 100' Pump 12A (C) was removed from service after testing of this pump was completed.

Station indications showed necessity to clean the water box.

November 20, 2009 -.........

Technical Analyst Report No. TP09066 Salem Chemistry - PSEG Power

SUMMARY

(Cont'd)

For reporting purposes, shown below is the data pertinent to the injection of Rhodamine WT dye released to the river during testing. Testing is complete at this station.

RECORD OF RHODAMINE WT DYE INJECTION


Test Pump Injection --Pure--------- Number of Total Effluent Date No. Time Dye Pumps in System Concentration Injected Service Flow (start) (stop) (ml) (1000 gpm) (ppb) 11/17/09 11A 1014 1040 31.77 6 1110.0 0.29 11/17/09 11B 1051 1116 29.87 6 1110.0 0.30 11/17/09 12A 1341. 1409 35.19 6 1110.0 0.30 11/18/09 12B 854 917 29.18 5 925.0 0.36 11/18/09 13A 930 953 29.27 5 925.0 0.36 11/18/09 13B 1021 1045 30.66 5 925.0 0.36 11/17/09 12A 1254 1301 8.80 6 1110.0 0.30 11/17/09 12A 1307 1315 10.05 6 1110.0 0.30 11/17/09 12A 1320 1320 7.54 6 1110.0 0.30 11/18/09 13B 1005 1005 12.77 5 925.0 0.36 TEST METHOD The circulating water flow rate was determined by fluorometry using MTS Mechanical Division Work Instruction TPG-1 9 Rev. 10 "Water Flow Using The Turner Fluorometer". Rhodamine WT dye was injected into the bell mouth of each pump using 1/2 inc PVC pipe with a carrier flow of screen wash water at 3 gallons per minute.

The dye was injected at a known rate using a peristaltic pump and a class A burette to measure rate. The diluted sample was retrieved and monitored by taking a sample from the inlet water box piping. The ratio of the injected concentration to the sample concentration multiplied by the injection flow rate yielded the circulator flow rate.

The total static head was obtained by measuring the pump suction head in feet from elevation

w Salem Generating Station - Unit No.2 Total Pump Head vs. Pump Flow 90 I I 80

  • Guar. Point 0 Pump 11A (?)

,f

-N

  • @Pump 11B (H) 0 Pump 12A (C) 70
  • ,Pump 12B (K) rJPump 13A (D) 60o M Pump 13B (J) 4-a) 50
  • a) 40 Manufacturers Curvse (total dynamic head vs. flow)

E 30 20- - The data points shown represent measured pump flow plotted against total static head. The velocity head has not been accounted for in the data.

Manufacturers Curve; Iu.

(total statics head vs. flow);;

0 -

0 50 100 150 200 250 Pump Flow - 1000 gpm I;

r Maplewood Testin 'Services i.

t. Report No! TP09066 i

1112009 I

r i

New Jersey Department of Environmental Protection Division of Water Quality Surface Water Discharge Monitoring Report Subhmittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

Mont DayYearMont YerD NJ0005622 _1i 12009 11 209 To T LI2009 fII0_ea9 oooi FACA - SW Outfall FACA PERMITTEE: LCICATION OF ACTIVITY: REPORT 'RECIPIENT:

PSE&G NUCLEAR LLC PSE*G NUCLEAR LLC SALEM PSEG NUCLEAR LLC 80 PARK PLAZA GE]NERATING STATION PO BOX 236/N21 NEWARK, NJ 07 101 AL]LOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HA NCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: L] No Discharge thi .sMonitoring Period F1 Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall sign the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having that:

responsibility or person designated by that person shall also sign the second certification at the bottom of this page.. If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and is all attachments, and I believe tha t the information true, accurate and that, based on my inquiry of those individuals immediately responsible for obtaining the information, complete. I am aware that there are significant penalties for submitting false information, including the possibility of and/or imprisonment, pursuant' to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $510,000 per violation.

Robert C. Braun. Site Vice President - Salem N/A NAME AND TITLE OF P7,7 AL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE)

[__-____12/18/2009 856-339-1998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capital expenditus and hirepersonnel, a person having that responsibilityor person designatedby that person shall sign the following certification:

I certify under penalty of law and in accordance with N.J.S.A. 58:1OA-6F(5) that I have reviewed the attached discharge monitormig reports.

N/A N/A N/A N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

MONITORED LOCATION: MONITORING PERIOD: FACILITY NAME:

FACA SW Outfall FACA I '/co TO ' /3o/o9 PSEG NUCLEAR LLC SALEM GENERATIIP I

Comments: Ifthere are any questions in regards to the monitoring report form, please contact Susan Rosenwinkel of the BPSP - Region 2 at (609)292-4860 or Via emaii~at "srosenwi@dep.state.nj.us'I.

Pre-PrIntCr ation Date: 71112009 I Page I Df 1

New Jersey Department of Environmental Protection Division of Water Quality Surface Water Discharge Monitoring Report Submittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

NJ0005622 11 I Dny 2009 T Tooont Year 1 a 20099 FACB - SW Outfall FACB PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM PSEG NUCL EAR LLC 80 PARK PLAZA GENERATING STATION PO BOX 236/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION I COUNTY: Southern / Salem County CHECK IF APPLICABLE: [I] No Discharge tius Monitoring Period L] Monitormng Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sig the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall sign!

the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having that responsibility or person designated by that person shall also sign the second certification at the bottom of this page. If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe thaft the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of and/or imprisonment, pursuant.

to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per violation.

Robert C. Braun, Site Vice President - Salem N/A NAME AND TITLE O IPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE"AND REGISTRY NUMBER (IF APPLICABLE) 12/18/2009 856-339-1998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capitalexpenditureIs and hirepersonnel, aperson having that responsibility or person designatedby thatperson shall sign the following certification:

I certify under penalty of law and in accordance with N.J.S.A. 58:1OA-6F(5) that I have reviewed the attached discharge monitoring reports.

N/A N/A N/A N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

PERMIT NUMBER: MONITORED LOCATION: MONITORING PERIOD: FACILITY NAME; NJ0005622 FACB SW Outfall FACB *VIoI 'TO II/Bo/o09 PSEG NUCLEAR LLC SALEM GENERATIr, ORCNENTRATION OOT. !UNITS E).ANALYSls NO. FREQ, OF Comments: If there are any questions in regards to the monitoring report form, please contact Susan Rosenwinkel of the EPSP - Region 2.at (609)292-4860 or via email 't "srosenwi@dep.state.nj.u':s Pre-Print Creation Date; 7/1/2009 Page 1 of I Pre-Print Creation Date; 71112009 Page 1 of I

New Jersey Department of Environmental Protection Division of Water Quality Surface Water Discharge Monitoring Report Submittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

NJ0005622 *11.

Month 1 Day Year 2009 T T onth 11' Yeay 2009 FAY !11. C - SW Outfall FACC 11 i PERMITTEE: LOCATION OF ACTIVITY: REPORT. RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM tPSEG NUCLEAR LLC

.80 PARK PLAZA GENERATING STATION ýPO BOX 236/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD 1HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: E] No Discharge this Monitoring Period LII Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall sign the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having that responsibility or person designated by that person shall also sign the second certification at the bottom of this page' If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in tfiis document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe thalt the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including ihe possibility of and/or imprisonment, pursuant to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per violation.

Robert C. Braun, Site Vice President - Salem "_ _ _ _ __N/A NAME AND TITLE OF 7P PAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE) 12/118/2009 856-339-1998 :1 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capitalexpenditures and hirepersonnel, a person having that responsibilityor person designatedby that person shall sign the following certification:

I certify under penalty of law and in accordance with N.J.S.A. 58:1OA-6F(5) that I have reviewed the attached discharge monitoring reports.

N/A *N/A N/A N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

PERMIT NUMBER: MONITORED LOCATION: MONITORING PERIOD: FACILITY NAME:

NJ0005622 FACC SW Outfall FACC It/1 /al TO ll/So/o9 PSEG NUCLEAR LLC SALEM GENERATW PUNITS NO. FREQ. OF PARAMETER QUANTITY OR LOAQING UNITS QUALITY OR CONCENTRATION UNIT EX. ANALYSIS Flow, In Conduit or f f AN Thru Treatment Plant MEASJFEMENT "I3AO *] * "7 M.. ",v 50050 G 304 -REORI Raw Sew/influd nt R1ttj.NT ui'vOn <D-tWNIXX~#

Comments: If there are any questions in regards to the monitoring report form, please contact Susan Rosenwinkel of the BPSP - Region 2 at (609)292-4860 or via email at "srosenwi@dep.state.nj.us".

Pre-PrintCreation Date: 7/1/2009 Page1 of I

New Jersey Department of Environmental Protection Division of Water Quality Surface Water Discharge Monitoring Report Suinittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

NJ0005622 Month Da Year TMon Yar 04C- SW Outfall 48Cj PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM .PSEG NUCLEAR LLC 80 PARK PLAZA GENERATING STATION PO BOX 236/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: L1 No Discharge this Monitoring Period L] Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall signi the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having thati responsibility or person designated by that person shall also sign the second certification at the bottom of this page', If the local agency has contracted %ith another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the ceritfication.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and

,that, based on my inquiry of those individuals immediately responsible for obtaining the information,.I believe that the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibiliy of and/or imprisonment, pursuant to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per violation.

D,-,f r' Rln I 0itp \jrfp Prp-idpnt - 50al*ni N/A CIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE)

NAME AND TITLE O 12/1i8/2009 856-339-1998 DATE AREA CODE/PHONE NUMBER SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capital expenditures and hirepersonnel, a person having that responsibilityor person designated by that person shall sign the following certification:

I certify under penalty of law and in accordance with N.J.S.A. 58:1OA-6F(5) that I have reviewed the attached discharge monitoring reports.

N/A N/A N/A. N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

PERMIT NUMBER: MONITORED LOCATION:

MONITORING PERIOD: FACILITY NAML:

NJ0005622 048C SW Outfall 48C TO %i/l&al/t PSEG NUCLEAR LLC SALEM GENERATIP I

Commenfe" Ifthere are any questions in regards to the monitoring report form, please contact Susan Flosenwinkel of the BPGP - Region 2 at (609)292-4680 or via email at "srosenwi@dep itale.njus.

Pre-Print Pre-PrintCreation CreationDate:

Date: 7/1/2009 71112009 Page 1 of I Page I of I

New Jersey Department of Environmental Prdtection Division of Water Quality Surface Water Discharge Monitoring Report Submittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

11Month Day 2C Year To- 481A - SW Outfall 481A PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM PSEG NUCLEAR LLC 80 PARK PLAZA GENERATING STATION PO BOX 236/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD IJANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: 0I No Discharge this Monitoring Period [l Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign:

the certification or, in his absence a person designated by that person. For a local agency, the highest ianking operator of the treatment works shall sign the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having thai responsibility or person designated by that person shall also sign the second certification at the bottom' of this page. If the local agency has contracted x'ith another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibilidy of and/or imprisonment, pursuant:

to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per violation.

Robert C. Braum, Site Vice President - Salem N/A NAME AND TITLE OF PRI* W EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE) 12/18/2009 856-339-1998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capitalexpenditures andhire personnel,aperson having that responsibilityor person designatedby thatperson shall sign the following certification:

I certify under penalty of law and in accordance with N.J.S.A. 58:1 OA-6F(5) that I have reviewed the attached discharge monitoring reports.

N/A N/A I N/Al N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

.1

MONITORED LOCATION: MONITORINO PERIOD; FACILITY NAME:

481A SW Outfall 481A tlA/*/q ITO t1/:co/oj PSEG NUCLEAR LLC SALEM GENERATIIM UNITE QUALITY OR CONCENTRATION FREQ.'OF U

UNITS ANALYSIS Oxidants I

  • CPOX 1 Effluent Gross Value Option 1 IChlorine Produced Oxidants z 0 1- 11
  • CPOX 1 Effluent Gross Value Option 2 Comments: The permittee is required to perform acute toxicity testing on a minimum of one representative OWS outfall while DSN 480 Is being routed to that outfall.

I.

Pre-PrintCreation Date: 7/1/2009 I Page 1 of 2

PERMIT NUMBER: MONITORED LOCATION: MONITORINU L-HIULU: I-AL, Iil r iv,-,vj,-.

NJo005622 i 481A SW Outfall 481A II/i / TO , PSEG NUCLEAR LLC SALEM GENERATIW Comments:. The permittee is required to perform acute toxicity testingon a minimum of one representative CWS outfall while DSN 48C Is being routed to that outfall.

Pre-PrintCreation Date; 7/1/2009 Pagd2 of 2

New Jersey Department of Environmental PrItection Division of Water Quality Surface Water Discharge Monitoring Report Submittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

Month Da 482A - SWOutfall 482A 1 2009 T 11 0J 20092 PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM PSEG NUCUE"AR LLC 80 PARK PLAZA GENERATING STATION PO BOX 236/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: L-- No Discharge this Monitoring Period El Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall signl the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having thait responsibility or person designated by that person shall also sign the second certification at the bottom of this page. If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information sulbmitted in tlis document and all attachments, and!

that, based on my inquiry of those individuals immediately responsible for obtaining the information,.Iý believe that the information is true, accurate and[

complete. I am aware that there are significant penalties for submitting false information, including the possibiliy of and/or imprisonment, pursuant to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per violation.

Robert C. Braun, Site Vice President - Salem _N/A NAME AND TITLE OF .PCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE) l2/1!8/2009 856-339-1998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capitalexpenditures and hirepersonnel, aperson having that responsibilityor person designatedby thatperson shallsign thefollowing certification:

I certify under penalty of law and in accordance with N.J.S.A. 58:1OA-6F(5) that I have reviewed the attached di charge monitoring reports.

N/A N/A N/A N/AL_

NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

PERMIT NUMBER: MONITORED LOCATION: MONITORING PERIOD: FACILITY NAME:

NJ0005622 482A SW Outfall 482A 1/j/o9 TO %%/zo/oc)

PARAMETER QUANTITY OR LOADING UNITS I PSEG NUCLEAR LLG SALEM GENERATIO NO. FREQ. OF QUALITY OR CONCFNTRATION UNIT9 ANALYSIS Flow, In Conduit or Thru Treatment Plant 50050 1 Effluent Gross Value PH Pre-PrintCreation Date: 7/1/2009 Page:I of 2

PERMIT NUMBER: MONITORED LOCATION: MONITORING PERIOD: FA(

NJ0005622 482A SW Outfall 482A I*/ic/j'TO "/3o/oq r r QUANTITY OR LOADING UNITS QUALITY OR

.1 P.dge 2 of Pro-PrintCreation Date: 71112009 2

New Jersey Department of Environmental Protection Division of Water Quality Surface Water Discharge Monitoring Report Submittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

NJ0005622 Month To Year 483A - SW Outfall 483A 11 a1y 20099Lii l2 0 PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM PSEG NUCLEAR LLC 80 PARK PLAZA GENERATING STATION TPO BOX 236/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION I COUNTY: Southern / Salem CounIty CHECK IF APPLICABLE: [-- No Discharge this Monitoring Period F-1 monitoiring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall sign the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having that responsibility or person designated'by that person shall also sign the second certification at the bottom of this page' If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibiliy of and/or imprisonment, pursuant to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per violation.

Robert C. Braun, Site Vice President - Salem i N/A NAME AND TITLE OFY CIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE'AND REGISTRY NUMBER (IF APPLICABLE)

_ 12/18/2009 856-339-1998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorizecapital expenditurýes and hirepersonnel,a person having that responsibility or person designated by thatperson shall sign thefollowing certification: I I certify under penalty of law and in accordance with N.J.S.A. 58:10A-6F(5) that I have reviewed the attached di charge monitoring reports.

N/A N/A N/A N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

PERMIT NUMBER: MONITORED LOCATION:

MONITORING PERIOD: FACILITY NAME:

NJ0005622 483A SW Outfall 483A 41l/o/aTO 11/20/09 PSEG NUCLEAR LLC SALEM GENERAT UNITS I QUALITY OR CONCENTRATION NO. .FREQ. OF UNiTS E~k ANALYSIS

~*~**6q I

F__

_31vil',T 7

~'

Pre-PrintCreation Date:

7/1/2009 page l of 2

PERMIT, MONITORED LOCATION: MONITORING PERIOD: FACILITY NAME:

IV/ai/,, TO .is/-ja/oqt 483A SW Outfall 483A PSEG NUCLEAR LLC SALEM GENERATIIW QUANTITY OR LOADING UNITS QUALITY OR CONCENTRATION UNITS i RQ FR[

I EX.i ANAILYSIS Comments: A4ny questions in regards to the monitoring report form can /je directed to S. Rosenwinkel of the BPSP - Region 2 at (609)$92-486D,.

Pre-PrintCreation Date: 7/1/2009 Pagei of 2

New Jersey Department of Environmental Protection Division of Water Quality Ij Surface Water Discharge Monitoring Report Submittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

SMonthi 11 Day I Year 1 2009 To onth 11 Day 0

Year 484A - SW Outfall 484A PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM PSEG NUCLEAR LLC 80 PARK PLAZA GENERATING STATION PO BOX 236/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: El No Discharge this Monitoring Period El- Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall sign the certification. Where the highest ranking operator does not have the ability to authorize capital expeinditures and hire personnel, a person having that responsibility or person designated by that person shall also sign the second certification at the bottom of this page.I If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibilit!y of and/or imprisonment, pursuant to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per violation.

Robert C. Braun, Site Vice President - Salem ___ N/A NAME AND TITLE - AL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE)

_ "_ 12/18/2009 856-339-1998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR I DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capital expenditures and hire personnel,a person having that responsibilityor person designatedby that person shall sign the following certification:

I certify under penalty of law and in accordance with N.J.S.A. 58:lOA-6F(5) that I have reviewed the attached discharge monitpormg reports.

N/A N/N/A N/A____ N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBERI

MONITORED LOCA TION: MONITOR ING PERIOD: FACILITY NAME; NJO005622 484A SW Outfall 484A 11/i/ol T0Q /*o/0,j PSEG NUCLEAR LLC SALEM GENERATII

.ýýl QUANTITY OR LOADING NO.C FREQ. OF IUNITS QUALITY OR CONCENTRATION UNITS EX. ANALYSIS TYPE I I * , ""

~7i7 8.c)o 00400 7 Intake From Stream LC50 Statre 96hr Acu Cyprinodon lcczlý z tq I I TANSA 1 Effluent Grosi Value I -ý ý I5ýC), k I Produced Oxidants I I

'CPOX 1I Effluent Gross Value Option 1 Chlorine Produced Oxidants I . I ý C,k I

  • CPOX 1 3/We ek Effluent Gross Value Option 2 Pre-PrintCreationDate: 7/1/2009 Page'1 of 2

'ERMIT NUMBER: MONITORED LOCATION: MONITORING PERIOD: FACILITY NAM-::

IJ0005622 484A SW Outfall 484A 11/i/ocj TO' t11 /S/oq PSEG NUCLEAR LLC SALEM GENERATIIP I I~

Comments: The permittee is required to perform acute toxicity testing .on a minimum of one representative CWS outfall while DGN 48C is being rou:ted to that outfall.

t i Pre-Print Creation Date: 7/1/2009 Paje.Pof 2

New Jersey Department of Environmental Protection Division of Water Quality Surface Water Discharge Monitoring Report Submittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

NJ0005622 IMonthi Day Year I Month Mo I Sa Ofar 1 2009 To 1 A 485`

PERMITTEE: LOCATION OF ACTIVITY: 4REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM jPSEG NUCILEAR LLC 80 PARK PLAZA GENERATING STATION PO BOX 236/N21  ! i NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: El No Discharge this Monitoring Period El Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall sign the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having that responsibility or person designated by that person shall also sign the second certification at the bottom of this page! If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe thai the information is true, accurate ancd complete. I am aware that there are significant penalties for submitting false information, including fhe possibilihy of and/or imprisonment, pursuant to N.J.A.C. 7:14A-6.9(B). The New.Jersey water Pollution Control Act provides for penalties up to $5,0,000 per violation.

Robert C. Braun, Site Vice President - Salem N/A NAME AND TITLE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE) 856-339-1998 '

12/118/2009 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capitalexpenditures and hirepersonnel,a person having that responsibilityor person'designatedby that person shall sign the following certification:

I certify under penalty of law and in accordance with N.J.S.A. 58:10A-6F(5) that I have reviewed the attached discharge moniioring reports.

N/A N/A N/A N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

PERMIT NUMBER: MONITORED LOCATION: MONITORING PERIOD: FACILITY NAME:

NJ0005622 485A SW Outfall 485A PSEG NUCLEAR LLC SAýLEM GENERATIIW I

Comments: The permittee is required to perform acute toxicity testing on a minimum of one representative OWS outfall while DSN 480 is being routed to that outfall.

Pre-PrintCreation Date: 7/1/2009 I of 9 Page'-1

PERMIT NUMBER: MONITORED LOCATION: MONITORING PERIOD: FACILITY NAME:.-

NJ0005622 485A SW Outfall 485A I%/%/oq TO til*',lo9 PSEG NUCLEAR LLC SALEM bENERATW PARAMETER QUANTITY OR LOADING NO. :FREQ. OF UNITS QUALITY OR CONCENTRATION UNITS rzk ANALYSIS lperature, 0 'I~i Pre-PrintCreation Date: 7/1/2009 . Page,2 of 2

New Jersey Department of Environmental Protection Division of Water Quality Surface Water Discharge Monitoring Report Sub'mittal Form NJPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

Month Day MnYear D Y NJ0005622 11 1 2009 To 1 ffý J2009j 486A - SW Outfall 486A PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM PSEG NUCLEAR LLC 80 PARK PLAZA GENERATING STATION PO BOX 23,6/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: El No Discharge this Monitoring Period Monitoring Report Commefits Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall sign the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures an~d hire personnel, a person having that responsibility or person designated by that person shall also sign the second certification at the bottom of this pag6. If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of and/or imprisonment, pursuant to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per yiolation.

Robert C. Braun, Site Vice President - Salem N/A NAME AND TITLE OF CIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE) 12/18/2009 856-3391998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capitalexpenditures and hire ersonnel, a person having that responsibilityor person designated by thatperson shall sign the following certification: r I certify under penalty of law and in accordance with N.J.S.A. 58:IOA-6F(5) that I have reviewed the attached discharge monitoring reports.

N/A N/A r N/A& N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

PERMIT NUMBER: MONITORED LOCATION:

MONITORING PERIOD: FACILITY NAME:

NJ0005622 486A SW Outfall 486A T itA /a0jTO Ii /3b/oj PSEG NUCLEAR LLC SALEM GENERATIW I

Pro-Print Date: 7/1/2009 1of 2

MONITORING PERIOD: FACILITY NAME:

1j/i/o'q TO' t/SO/o9 PSEG NUCLEAR LLC SALEM GENERATII' I N(D. FREQ. OF UNITS QUALITY OR CONCENTRATION UNITS EX. ANALYSIS Comments: Any questions In regards to the monitoring report form can be directed to G. Rosenwinkal of the RPSP - Region 2 at (609)292-4860, a! .n.L-T1 r 7klf. Pagek2of 2 i on a e:

New Jersey Department of Environmental Protection Division of Water Quality Surface Water Discharge Monitoring Report Sul imittal Form NJPDES PERMIT MONITORING PERIOD I MONITORED LOCATION:

NJ0005622 Moth 1 Day 2009 To 11 30_ e 2009 487B* - SW Outfall 487B PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM PSEG NUCLEAR LLC 80 PARK PLAZA GENERATING STATION PO BOX 23:6/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCKS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF.APPLICABLE: 0 No Discharge this Monitoring Period EL-- Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational responsibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest r-anking operator of the treatment works shall sign the certification. Where the highest ranking operator does not have the ability to authorize capital .expnditures anid hire personnel, a person having thai responsibility or person designated by that person shall also sign the second certification at the bottomj of this page. If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shalt sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, .1believe th't the information is true, accurate an*i complete. I am aware that there are significant penalties for submitting false information, including 'the possibility of and/or imprisonment, pursuant.

to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per Vxiolation.

Robert C. Braun. Site Vice President - Salem ___N/A NAME AND TIT PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (IF APPLICABLE) 12/;18/2009 856-339-1998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE i AREA CODE/PHONE NUMBER

  • For a local agency where the highest-rankingoperatordoes not have the ability to authorizecapitalexpenditures and hirejersonnel, a person having that responsibilityor person designatedby that person shall sign the following certification.

I certify under penalty of law and in accordance with N.J.S.A. 58:1OA-6F(5) that I have reviewed the attached discharge momitoring reports.

N/A N/A N/A* N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBER

New Jersey Department of Environmental Pr 9 tection Division of Water Quality Surface Water Discharge Monitoring Report Sublittal Form NjPDES PERMIT MONITORING PERIOD MONITORED LOCATION:

NJ0005622 Mn 1 2009 To L~L1 oiE 2009 489A - SW Outfall 489A PERMITTEE: LOCATION OF ACTIVITY: REPORT RECIPIENT:

PSE&G NUCLEAR LLC PSEG NUCLEAR LLC SALEM PSEG NUCLEAR LLC 80 PARK PLAZA GENERATING STATION PO BOX 23A6/N21 NEWARK, NJ 07101 ALLOWAY CREEK NECK RD HANCOCkS BRIDGE, NJ 08038 HANCOCKS BRIDGE, NJ 08038 REGION / COUNTY: Southern / Salem County CHECK IF APPLICABLE: F1 No Discharge this Monitoring Period Monitoring Report Comments Attached WHO MUST SIGN The highest ranking official having day-to-day managerial and operational respns"ibilities for the discharging facility shall sign the certification or, in his absence a person designated by that person. For a local agency, the highest ranking operator of the treatment works shall sigi the certification. Where the highest ranking operator does not have the ability to authorize capital expenditures and hire personnel, a person having tha responsibility or person designated by that person shall also sign the second certification at the bottom' of this page. If the local agency has contracted with another entity to operate the treatment works, the highest-ranking official of the contracted entity shall sign the certification.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments, and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of and/or imprisonment, pursuant to N.J.A.C. 7:14A-6.9(B). The New Jersey water Pollution Control Act provides for penalties up to $50,000 per liolation.

Robert C. Braun, Site Vice President - Salem N/A NAME AND T PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR GRADE AND REGISTRY NUMBER (iF APPLICABLE) 12/118/2009 856-33941998 SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER, AUTHORIZED AGENT, OR *LICENSED OPERATOR DATE AREA CODE/PHONE NUMBER

  • Fora local agency where the highest-rankingoperatordoes not have the ability to authorize capitalexpenditures and hire personnel,a person having that responsibilityor person designatedby thatperson shall sign the following certification:

I certify under penalty of law and in accordance with N.J.S.A. 58: 1OA-6F(5) that I have reviewed the attached discharge monitoring reports.

N/A N/A N/A NAME AND TITLE SIGNATURE DATE AREA CODE/PHONE NUMBERt

PERMIT NUMBER: MONITORED LOCATION:

MONITORING PERIOD: FACILITY NAME:

NJ0005622 489A SW Outfall 489A 1/1/09, TO ,1/?a/oI' PSEG NUCLEAR LLC SALEM QENERATIP 1 1 S--.---

PARAMETER QUANTITY OR LOADING UNITS QUALITY OR CONCENTRATION uNITS NO. FREQ.10Q " TSAMPLE

or ErX. ANALYSIS SAMPL. 1-I-Thru Treatment Plant MEASUREMENT 0 x),A~ .

'tn.

50050 1 IIEPORT(, 4, ,

Effluent Gross Value 1~EOUP1EMENT oiMOAV 0O1 FrAI 3/4.kilMonth il t~Not Appi6 t)T P Pre-Print