ML16272A158

From kanterella
Jump to navigation Jump to search
Retraction of Reported Discharge to the Delaware River
ML16272A158
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/16/2016
From: Gregory H
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
16-09-16-0916-17, LR-E16-0109
Download: ML16272A158 (2)


Text

{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236., Hancocks Bridge, NJ 08038-0236 LR-E16-0109 Dated: SEP "1 *6 2016 Certified Mail, Return Receipt Requested OPSEG Article Number: 7013 2630 0000 0535 8672 NuclearLLC Bureau of Release Prevention New Jersey Department of Environmental Protection PO Box 424 Trenton, New Jersey 08625-0424 Attn: Discharge Confirmation Report RE: PSEG Nuclear LLC - Salem Generating Station NJDEP Case No. 16-09-16-0916-17 Operator# 25 Retraction of Reported Discharge to the Delaware River

Dear Sir/Madam:

PSEG Nuclear LLC (PSEG) is submitting this report to provide additional information to rescind the notification of, what at the time, was believed to be a discharge of 2-3 ounces of fish oiL(vegetable oil)"to the Delaware River. In order to meetthe 15-minute immediate notification required by the spill regulations, the hotline* was called until verification of thE? discharge could be made. The. disch~rge ~as, reported to the New Jersey Department of Environmental Protection (NJDEP) hotline at 0916 hours on September 16, 2016 and assigned case number 16-09.-16-0916-17 by Operator#25. This discharge was also reported to the U.S. Nuclear Regulatory Commission (NRC) in accordance with the Station's NRC license. On September 16; 2016 at approximately 0858 hours, a hydraulic line on a rake leaked fish oil (vegetable oil) *at the Circulating Water strudure. It was initially reported that approximately 2-:3 ounces had entered the Delaware River. We have since determined that the spill was not reportable as there was no discharge to the Delaware River. The NJDEP was updated later that same day (09/16/2016) at 1005 hours, that PSEG was retracting the original spill report because the leak did not reach the Delaware River an9 therefore this was a non-reportable spill. Should you have any questions or require further information, please do not hesitate to contact Michael Pego*at (856) 339-1404. *

  • SincerelY;,
.c!lk"th1d H~*lell. Gregory ,~    v.,,--{) :..*

Environmental Compliance* Manager - Nuclear

Bureau of Discharge Prevention LR-E16-0109 cc: U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 NJDEP-Water Compliance and Enforcement Southern Water Enforcement Attn: Steven Mathis 2 Riverside Drive, Suite 201 Camden, NJ 08103 2}}