Supplement to License Amendment Request 18-02. Application to Revise the Technical Specifications Associated with Movable Control Rods
ML19274D342
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/30/2019
From: Mccartney E
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LAR 18-02, SBK-L-19110
Download: ML19274D342 (2)


Text

NEXTera ENERGY~

SEABROOK September 30, 2019 SBK-L-19110 10 CFR50.90 United States Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 RE: Seabrook Station Docket No. 50-443 Supplement to License Amendment Request 18-02. Application to Revise the Technical Specifications Associated with Movable Control Rods

Reference:

License Amendment Request 18-02, Application to Revise the Technical Specifications Associated with Movable Control Rods, October 4, 2018 (ADAMS Accession No. ML18277A377)

In the referenced letter, NextEra Energy Seabrook, LLC (NextEra) requested an amendment to the Seabrook Station (Seabrook) Technical Specifications (TS). The proposed license amendment adopts changes provided in TSTF-234, "Add Action for More than One [D]RPI Inoperable"; TSTF-547, "Clarification of Rod Position Requirements"; and makes various other changes to align the Seabrook TS more closely with NUREG-1431, "Standard Technical Specifications Westinghouse Plants."

In the referenced letter, NextEra also requested NRC approval of the license amendment request within one-year and stated that the amendment would be implemented within the following 90 days.

However, additional time is needed to align planned maintenance scheduled for the upcoming refueling outage and therefore, NextEra will implement the amendment by May 28th, 2020.

Should you have any questions or require additional information, please contact Ken Browne, Site Director, Nuclear Safety Assurance and Learning, at 603-773-7932 This letter contains no new or revised regulatory commitments.

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

Enclosure to SBK-L-19110 Page 2 I declare under penalty of perjury that the foregoing is true and correct.

Executed on September 2(,, , 2019 i/ i Ii~

~cCartney \J Site Director (VP) - Seabrook Nuclear Power Plant N extEra Energy cc: NRC Region I Administrator NRC Project Manager NRC Senior Resident Inspector Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 Mr.John Giarn1sso, Jr., Nuclear Preparedness Manager The Co1n1llonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399