SBK-L-15040, Response to Request for Additional Information for License Amendment Request 14-04 Revised Reactor Coolant System Pressure - Temperature Limits Applicable for 55 Effective Full Power Years

From kanterella
Jump to navigation Jump to search

Response to Request for Additional Information for License Amendment Request 14-04 Revised Reactor Coolant System Pressure - Temperature Limits Applicable for 55 Effective Full Power Years
ML15072A036
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/09/2015
From: Dean Curtland
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15072A023 List:
References
SBK-L-15040
Download: ML15072A036 (3)


Text

Enclosure 3 to this Letter Contains Proprietary Information Withhold Enclosure 3 from Public Disclosure in Accordance with 10 CFR 2.390 NExTera ENERGYPA__

March 9, 2015 10 CFR 50.90 SBK-L-15040 Docket No. 50-443 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Response to Request for Additional Information for License Amendment Request 14-04 Revised Reactor Coolant System Pressure - Temperature Limits Applicable for 55 Effective Full Power Years

References:

1. Seabrook Station License Amendment Request 14-04, "Revised Reactor Coolant System Pressure - Temperature Limits Applicable for 55 Effective Full Power Years," SBK-L-14102, July 24, 2014 (ML14216A404).
2. NRC letter to Seabrook Station, "Seabrook Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Technical Specification Pressure-Temperature Limits and Request for Exemption from 10 CFR Part 50, Appendix G Minimum Temperature requirements (TAC Nos. MF4576 and MF4577)," dated January 9, 2015 (ML14363A367).

In Reference 1, NextEra Energy Seabrook, LLC (NextEra) submitted License Amendment Request (LAR) 14-04 to the Technical Specifications (TS) for Seabrook Station and requested an exemption from the requirements of 10 CFR 50 Appendix G. The proposed change revises the pressure-temperature (P/T) limits in TS 3.4.9.1, Reactor Coolant System Pressure-Temperature Limits, to be applicable to 55 effective full power years. The change also revises TS 3.4.9.3, Overpressure Protection Systems, by providing new overpressure protection setpoints and lowering the RCS temperature at which the TS is applicable.

In Reference 2, the NRC requested additional information to complete its review of LAR 14-04.

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874 XC

U.S. Nuclear Regulatory Commission SBK-L- 15040/Page 2 The responses to RAIs 2.1.1, 2.1.2, 2.1.3 and 2.1.4 are provided in enclosures 1 and 3 of this letter. Enclosure 1 provides the non-proprietary, redacted responses to the RAIs. Enclosure 3 provides the responses to the RAIs and contains information proprietary to Westinghouse Electric Company LLC, and is supported by an affidavit in Enclosure 2 signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.3 90. Accordingly, NextEra requests that the information that is proprietary to Westinghouse (Enclosure 3) be withheld from public disclosure in accordance with 10 CFR 2.390. Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW- 15-4115 and should be addressed to J.A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.

The response to RAI 2.2.1 will be provided by separate correspondence by June 30, 2015.

This response does not modify the changes to the TS as previously proposed and does not alter the conclusion in Reference 1 that the changes do not present a significant hazards consideration.

This letter contains no regulatory commitments.

Should you have any questions regarding this letter, please contact Mr. Michael Ossing, Licensing Manager, at (603) 773-7512.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on March 9 ,2015.

Sincerely, NextEra Energy Seabrook, LLC Dean Curtland Site Vice President Enclosure

U.S. Nuclear Regulatory Commission SBK-L- 15040/Page 3 cc: D. Dorman, NRC Region I Administrator J. Lamb, NRC Project Manager, Project Directorate 1-2 P. Cataldo, NRC Senior Resident Inspector Mr. Perry Plummer Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 John Giarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399