MONTHYEARRS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-038, Response to Request for Additional Information for the Byron Proposal to Reinsert an Accident Tolerant Fuel Lead Test Assembly2023-02-27027 February 2023 Response to Request for Additional Information for the Byron Proposal to Reinsert an Accident Tolerant Fuel Lead Test Assembly RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-118, Withdrawal of License Amendment Request to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-10-31031 October 2022 Withdrawal of License Amendment Request to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. RS-22-097, License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly2022-08-31031 August 2022 License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator .2022-06-17017 June 2022 Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . RS-22-072, Response to Request for Additional Information Regarding License Amendment to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-06-0606 June 2022 Response to Request for Additional Information Regarding License Amendment to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink 2024-09-13
[Table view] |
Text
Michael P. Gallagher Vice President. License Renewal Exelon Generation Exelon Nuclear 200 Exelon Way Kennett Square. PA 19348 610 765 5958 Office 610 765 5956 Fax www.exeloncorp.com michaelp.gallagher@exeloncorp.com 10 CFR 50 10 CFR 51 10 CFR 54 RS-14-091 March 21, 2014 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Updated Responses to NRC Requests for Additional Information, Set 3, dated November 25, 2013, related to the Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 License Renewal Application
References:
- 1. Letter from Michael P. Gallagher, Exelon Generation Company LLC (Exelon) to NRC Document Control Desk, dated May 29, 2013, "Application for Renewed Operating Licenses."
- 2. Letter from Michael P. Gallagher, Exelon Generation Company LLC (Exelon) to NRC Document Control Desk, dated December 17, 2013, "Response to NRC Requests for Additional Information, Set 3, dated November 25, 2013, related to the Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 License Renewal Application In the Reference 1 letter, Exelon Generation Company, LLC (Exelon) submitted the License Renewal Application (LRA) for the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 (BBS). In Reference 2, Exelon provided responses to NRC Set 3 Requests for Additional Information.
After review of these responses, the NRC staff indicated that additional detail related to the responses to two of the Set 3 RAis, RAI 2.1.3.4-1 and RAI 2.1.3.4-3, is required. This letter provides updated responses to each of these two RAis. These updated responses replace the original responses in their entirety.
March 21, 2014 U.S. Nuclear Regulatory Commission Page 2 Responses to the other four RAis that were part of Set 3 are not affected by this update; therefore, they are not included in this package.
Enclosure A contains the updated responses to RAI 2.1.3.4-1 and RAI 2.1.3.4-3.
Enclosure B contains an update to LRA Section 2, consistent with the updated RAI responses.
There are no new or revised regulatory commitments contained in this letter.
If you have any questions, please contact Mr. AI Fulvia, Manager, Exelon License Renewal, at 610-765-5936.
I declare under penalty of perjury that the foregoing is true and correct.
Respectfully, Michael P. Gallagher <'
Vice President - License Renewal Projects Exelon Generation Company, LLC
Enclosures:
A: Updated Responses to Requests for Additional Information B: Updates to LRA Section 2 cc: Regional Administrator- NRC Region Ill NRC Project Manager (Safety Review), NRR-DLR NRC Project Manager (Environmental Review), NRR-DLR NRC Senior Resident Inspector, Braidwood Station NRC Senior Resident Inspector, Byron Station NRC Project Manager, NRR-DORL-Braidwood and Byron Stations Illinois Emergency Management Agency- Division of Nuclear Safety
RS-14-091 Enclosure A Page 1 of 5 Enclosure A Byron and Braidwood Stations (BBS), Units 1 and 2 License Renewal Application Updated Responses to Requests for Additional Information RAI 2.1.3.4-1 RAI 2.1.3.4-3 Note: To facilitate understanding, the original RAI responses are shown in normal font.
Changes resulting from this submittal are highlighted with bolded italics for inserted text.
RS-14-091 Enclosure A Page 2 of 5 RAI 2.1.3.4-1, SATs and SBO recovery boundary - Byron Applicability: Byron
Background:
On Page 8.3-5 of the Byron-Braidwood Stations (BBS) Updated Final Safety Analysis Report (UFSAR), Section 8.3.1.1.2.1, the licensee provided the preferred configuration for both stations Unit 1 and Unit 2 under normal operating conditions in the following statements: The 4160-volt ESF bus 141 (241 [for Unit 2]) fed from the 345-kV utility grid through system auxiliary transformer (SAT) 142-1 (242-1) and circuit breaker 1412 (2412) and The 4160-volt ESF bus 142 (242) fed from the 345-kV utility grid through SAT 142-2 (242-2) and circuit breaker 1422 (2422)... The staff notes that these statements indicate that there are SATs and circuit breakers between the 345-kilo-volts (kV) utility grid and the 4160-volt ESF buses.
Issue:
Figure 2.1-2 in the LRA, Section 2.1.3.4, which depicts the Byron Station Blackout (SBO) recovery boundary, does not show circuit breakers 1412, 1422, 2412, and 2422 between the 345-kV circuit breakers and the 4160-volt ESF buses.
Request:
- a. Clarify why circuit breakers 1412, 1422, 2412 and 2422 are not included in Figure 2.1-2.
- b. Confirm that all components, including breakers and disconnect switches, between the 345-kV utility grid and the 4160-volt ESF buses that are in the SBO recovery path are within the scope of license renewal.
- c. Provide a revised Figure 2.1-2, as applicable, for the Byron SBO recovery boundary including all components in the SBO recovery path that shows a clear distinction between components that are within the scope of license renewal and those that are not.
Exelon Response:
- a. LRA Figure 2.1-2, Byron Station Blackout (SBO) Recovery Boundary is a simplified representation of the Byron SBO recovery path. Circuit breakers 1412, 1422, 2412, and 2422 were not shown on LRA Figure 2.1-2 and circuit breakers 1413, 1414, 1423, 1424, 2413, 2414, 2423, and 2424 were shown, but not labeled on LRA Figure 2.1-2 to maintain the figure as simple as possible. Circuit breakers 1412, 1413, 1414, 1422, 1423, 1424, 2412, 2413, 2414, 2422, 2423, and 2424 are within the scope of license renewal.
- b. The components in the SBO recovery path between the 345-kV utility grid and the 4160-volt ESF buses, including breakers and disconnect switches, are within the scope of license renewal.
RS-14-091 Enclosure A Page 3 of 5 The 4160-volt ESF bus power paths from:
the normal offsite source from the 345-kV utility grid, the reserve offsite source from the 345-kV utility grid, the alternate AC source are described below using Byron Unit 1, 4160-volt ESF bus 141 as an example.
The normal offsite source from the 345-kV system is through the Unit 1 System Auxiliary Transformer 142-1 and then through breaker 1412 to energize the 4160-volt ESF bus 141.
The reserve offsite source from the 345-kV system is through the Unit 2 System Auxiliary Transformer 242-1 and then through breakers 2412, 2414 and 1414 to energize the 4160-volt ESF bus 141.
The alternate AC source is from the Unit 2 diesel generator DG2A through breakers 2413, 2414 and 1414 to energize the 4160-volt ESF bus 141.
The power paths for remaining Byron Units 1 and 2 4160-volt ESF buses are similar.
- c. Consistent with this response, LRA Figure 2.1-2, page 2.1-14, is revised as shown in Enclosure B. The revised LRA Figure 2.1-2 for the Byron SBO recovery boundary includes circuit breakers 1412, 1422, 2412, and 2422 and labels for circuit breakers 1413, 1414, 1423, 1424, 2413, 2414, 2423, and 2424. Also, an explicit demarcation line that shows a clear distinction between components that are within the scope of license renewal and those components that are not in the scope of license renewal is added to LRA Figure 2.1-2.
RS-14-091 Enclosure A Page 4 of 5 RAI 2.1.3.4-3, SATs and SBO recovery boundary - Braidwood Applicability: Braidwood
Background:
On Page 8.3-5 of the Byron-Braidwood Stations (BBS) Updated Final Safety Analysis Report (UFSAR), Section 8.3.1.1.2.1, the licensee provided the preferred configuration for both stations Unit 1 and Unit 2 under normal operating conditions in the following statements: The 4160-volt ESF bus 141 (241 [for Unit 2]) fed from the 345-kV utility grid through system auxiliary transformer (SAT) 142-1 (242-1) and circuit breaker 1412 (2412) and The 4160-volt ESF bus 142 (242) fed from the 345-kV utility grid through SAT 142-2 (242-2) and circuit breaker 1422 (2422)... The staff notes that these statements indicate that there are SATs and circuit breakers between the 345-kilo-volts (kV) utility grid and the 4160-volt ESF buses.
Issue:
Figure 2.1-3 in the LRA, Section 2.1.3.4, which depicts the Braidwood Station Blackout (SBO) recovery boundary, does not show circuit breakers 1412, 1422, 2412, and 2422 between the 345-kV circuit breakers and the 4160-volt ESF buses.
Request:
- a. Clarify why circuit breakers 1412, 1422, 2412 and 2422 are not included in Figure 2.1-3.
- b. Confirm that all components, including breakers and disconnect switches, between the 345-kV utility grid and the 4160-volt ESF buses that are in the SBO recovery path are within the scope of license renewal.
- c. Provide a revised Figure 2.1-3, as applicable, for the Byron SBO recovery boundary including all components in the SBO recovery path that shows a clear distinction between components that are within the scope of license renewal and those that are not.
Exelon Response:
- a. LRA Figure 2.1-3, Braidwood Station Blackout (SBO) Recovery Boundary is a simplified representation of the Braidwood SBO recovery path. Circuit breakers 1412, 1422, 2412, and 2422 were not shown on LRA Figure 2.1-3 and circuit breakers 1413, 1414, 1423, 1424, 2413, 2414, 2423, and 2424 were shown, but not labeled on LRA Figure 2.1-3 to maintain the figure as simple as possible.
Circuit breakers 1412, 1413, 1414, 1422, 1423, 1424, 2412, 2413, 2414, 2422, 2423, and 2424 are within the scope of license renewal.
- b. The components in the SBO recovery path between the 345-kV utility grid and the 4160-volt ESF buses, including breakers and disconnect switches, are within the scope of license renewal.
RS-14-091 Enclosure A Page 5 of 5 The 4160-volt ESF bus power paths from:
the normal offsite source from the 345-kV utility grid, the reserve offsite source from the 345-kV utility grid, the alternate AC source are described below using Braidwood Unit 1, 4160-volt ESF bus 141 as an example.
The normal offsite source from the 345-kV system is through the Unit 1 System Auxiliary Transformer 142-1 and then through breaker 1412 to energize the 4160-volt ESF bus 141.
The reserve offsite source from the 345-kV system is through the Unit 2 System Auxiliary Transformer 242-1 and then through breakers 2412, 2414 and 1414 to energize the 4160-volt ESF bus 141.
The alternate AC source is from the Unit 2 diesel generator DG2A through breakers 2413, 2414 and 1414 to energize the 4160-volt ESF bus 141.
The power paths for remaining Braidwood Units 1 and 2 4160-volt ESF buses are similar.
- c. Consistent with this response, LRA Figure 2.1-3, page 2.1-15, is revised as shown in Enclosure B. The revised LRA Figure 2.1-3 for the Braidwood SBO recovery boundary includes circuit breakers 1412, 1422, 2412, and 2422 and labels for circuit breakers 1413, 1414, 1423, 1424, 2413, 2414, 2423, and 2424. Also, an explicit demarcation line that shows a clear distinction between components that are within the scope of license renewal and those components that are not in the scope of license renewal is added to LRA Figure 2.1-3.
RS-14-091 Enclosure B Page 1 of 3 Enclosure B Byron and Braidwood Stations, Units 1 and 2 License Renewal Application (LRA) updates resulting from the responses to the following RAIs:
RAI 2.1.3.4-1 RAI 2.1.3.4-3 Note: To facilitate understanding, the original LRA Figure 2.1-2, page 2.1-14 and Figure 2.1-3, page 2.1-15 have been repeated in this Enclosure, with revisions indicated. Original LRA text is shown in normal font. Changes originating from this letter and from Exelon letter RS-13-273, dated December 17, 2013 are highlighted with bolded italics for inserted text.
RS-14-091 Enclosure B Page 2 of 3 As a result of the updated response to RAI 2.1.3.4-1 provided in Enclosure A of this letter, and the original response to RAI 2.1.3.4-2 provided in Enclosure A of Exelon letter RS-13-273, LRA Figure 2.1-2, "Byron SBO Recovery Boundary," page 2.1-14, is revised as shown below:
Figure 2.1-2
RS-14-091 Enclosure B Page 3 of 3 As a result of the updated response to RAI 2.1.3.4-3 provided in Enclosure A of this letter, and the original response to RAI 2.1.3.4-4 provided in Enclosure A of Exelon letter RS-13-273, LRA Figure 2.1-3, page 2.1-15, "Braidwood SBO Recovery Boundary," is revised as shown below:
Figure 2.1-3