Revised Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations.
ML12060A343
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/10/2012
From: Kamilaris C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/12-0015, RIS-11-004
Download: ML12060A343 (3)


Text

jProgress Energy Serial: RNP-RAJ12-0015 FEB 10 2012 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REVISED RESPONSE TO REGULATORY ISSUE

SUMMARY

2011-04, "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" Ladies and Gentlemen:

H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, is providing a revised NRC Form 536, "Operator Licensing Examination Data," as an attachment to this letter. This revised form is being provided in accordance with NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations." Data estimates are provided for initial operator licensing examination needs, including intentions regarding preparation of the examinations and an estimate of the number of applicants to be examined.

If you have any questions concerning this matter, please contact me at (843) 857-1253.

Sincerely, Chris Kamilaris Manager - Support Services - Nuclear CK/cac Attachment c: NRC Resident Inspector, HBRSEP Mr. Victor McCree, NRC, Region II Mr. M. T. Widmann, NRC, Region II Ms. Araceli Billoch, NRC, NRR Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550 1,.* L

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/12-0015 2 Pages (including cover sheet)

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 NRC Form 536. Operator Licensing Examination Data

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (9-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 II DOCKET NO. 50-261/LICENSE NO. DPR-23 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 NUMBER OF REACTOR 4 8 8 8 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 07/29/13 05/19/14 05/18/15 05/17/16 ALTERNATE DATE 08/13/13 06/16/14 06/15/15 06/14/16 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER NUMBR MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEj DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (9-2011)