RNP-RA/11-0074, Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations
ML11242A019
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/24/2011
From: Kamilaris C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 11-004, RNP-RA/11-0074
Download: ML11242A019 (3)


Text

jProgress Energy Serial: RNP-RA/I 1-0074 AUG 2 4 2011 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 RESPONSE TO REGULATORY ISSUE

SUMMARY

2011-04, "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" Ladies and Gentlemen:

H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, is providing a completed NRC Form 536, "Operator Licensing Examination Data," as an attachment to this letter. This completed form is being provided in accordance with NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations." Data estimates are provided for initial operator licensing examination needs, including intentions regarding preparation of the examinations and an estimate of the number of applicants to be examined.

If you have any questions concerning this matter, please contact me at (843) 857-1253.

Sincerely, Chris l6milaris Manager - Support Services - Nuclear CK/cac Attachment c: NRC Resident Inspector, HBRSEP Mr. Victor McCree, NRC, Region II Mr. M. T. Widmann, NRC, Region II Ms. B. Mozafari, NRC, NRR Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550 AQ

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/l 1-0074 2 Pages (including cover sheet)

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 NRC Form 536, Operator Licensing Examination Data

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 Cy 13 Cy 14 Cy 15 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 CY 13 Cy 14 CY 15 NUMBER OF REACTOR 4 6 8 6 OPERATORS NUMBER OF SENIOR REACTOR 5 6 4 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 0 0 4 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 02/25/13 12/02/13 10/06/14 04/06/15 ALTERNATE DATE 03/11/13 12/16/13 10/20/14 04/20/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 80 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER