Category:Letter type:RNP
MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld2024-06-28028 June 2024 Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0076, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-12-0909 December 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0254, Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves2021-12-0909 December 2021 Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-06-0909 June 2021 Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20093J0982020-08-21021 August 2020 Issuance of Amendment No. 269 Regarding Technical Specification Change Incorporating Three New Feedwater Bypass Isolation Valves RA-20-0007, Request to Correct Administrative Renewed Facility Operating License Error2020-01-21021 January 2020 Request to Correct Administrative Renewed Facility Operating License Error RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0206, Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses2018-11-0606 November 2018 Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses RA-18-0048, Corrected Technical Specification Pages for TSTF-425 License Amendment Request2018-09-25025 September 2018 Corrected Technical Specification Pages for TSTF-425 License Amendment Request ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program ML18099A1302018-04-0505 April 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. ML18038B2892018-02-0707 February 2018 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17205A2332017-09-29029 September 2017 Issuance of Amendment Regarding Request to Modify the Licensing Basis Alternate Source Term RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RNP-RA/16-0044, Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-09-16016 September 2016 Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0057, License Amendment Request to Modify the Licensing Basis Alternate Source Term2016-09-14014 September 2016 License Amendment Request to Modify the Licensing Basis Alternate Source Term ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0003, Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report...2016-02-0303 February 2016 Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report... RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress2016-02-0101 February 2016 License Amendment Request, Change in Corporate Form of Duke Energy Progress RNP-RA/15-0117, Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-12-22022 December 2015 Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And..2015-11-19019 November 2015 Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation2014-02-10010 February 2014 License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 82013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 RNP-RA/13-0002, License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements2013-06-0707 June 2013 License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements BSEP 13-0013, License Amendment Request to Facility Operating Licenses for Change of Licensee Name2013-04-20020 April 2013 License Amendment Request to Facility Operating Licenses for Change of Licensee Name RA-12-031, Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-09-12012 September 2012 Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones ML12263A4242012-09-0606 September 2012 License Amendment Request to Delete Technical Specification Reactor Protection System Trip on Steam Generator Water Level Low Coincident with Steam Flow/Feedwater Flow Mismatch RNP-RA/12-0057, License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*)2012-08-29029 August 2012 License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/12-0028, Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2012-06-0808 June 2012 Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.502011-03-30030 March 2011 Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 2024-06-28
[Table view] |
Text
Progress Energy CFR 50.90 Serial: RNP-RA/10-0117 JAN 2 0 2011V United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR, AND SECTION 3.8.5, DC SOURCES - SHUTDOWN Ladies and Gentlemen:
In accordance with the provisions of the Code of Federal Regulations, Title 10, Part 50.90, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is submitting a request for an amendment to the Technical Specifications (TS) contained in Appendix A of the Operating License for H. B. Robinson Steam Electric Plant (HBRSEP),
Unit No. 2.
The proposed amendment will revise TS 3.8.3, "Diesel Fuel Oil and Starting Air," and TS 3.8.5, "DC Sources - Shutdown." The proposed change to TS 3.8.3 revises a non-conservative air receiver tank pressure to a value consistent with vendor recommendations. The proposed change to TS 3.8.5 corrects an editorial error related to TS formatting.
Attachment I provides an Affirmation as required by 10 CFR 50.30(b).
Attachment II provides a description of the current condition, a description and justification of the proposed change, a No Significant Hazards Consideration Determination, and an Environmental Impact Consideration.
Attachment III provides a markup of the affected TS pages. Attachment IV provides the retyped TS pages. Attachment V provides a retyped version of the proposed Bases change to Section 3.8.3. The Bases change provides amplifying information related to the TS change.
In accordance with 10 CFR 50.91(b), Progress Energy Carolinas, Inc., is providing the State of South Carolina with a copy of this license amendment request.
Progress Energy Carolinas, Inc. *_bOI Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550
United States Nuclear Regulatory Commission Serial: RNP-RA/10-0117 Page 2 of 2 The proposed change corrects a non-conservative TS requirement and therefore timely Nuclear Regulatory Commission approval of the proposed license amendment is requested. In the interim, station procedures have been revised to ensure the more conservative requirements are met.
If you have any questions concerning this matter, please contact Curt Castell at (843) 857-1626.
Sincerely, c.4, .2 Chris Kamilaris Manager - Support Services - Nuclear Attachments:
I. Affirmation II. Request for Technical Specifications Changes related to Section 3.8.3, "Diesel Fuel Oil and Starting Air," and Section 3.8.5, "DC Sources - Shutdown III. Markup of Technical Specifications Pages IV. Retyped Technical Specifications Pages V. Retyped Technical Specifications Bases Pages RAC/rac c: Ms. S. E. Jenkins, Manager, Infectious and Radioactive Waste Management Section (SC)
Mr. A. Gantt, Chief, Bureau of Radiological Health (SC)
Mr. L. A. Reyes, NRC, Region II Ms. B. Mozafari, NRC Project Manager, NRR NRC Resident Inspector, HBRSEP Attorney General (SC)
United States Nuclear Regulatory Commission Attachment Ito Serial: RNP-RA/10-0117 Page l of 1 AFFIRMATION The information contained in letter RNP-RA/10-01 17 is true and correct to the best of my information, knowledge, and belief; and the sources of my information are officers, employees, contractors, and agents of Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. I declare under penalty of perjury that the foregoing is true and correct.
Executed On: i. ZOft, 20, Chris Kamilaris Manager - Support Services - Nuclear
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/10-0117 Page 1 of 4 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR, AND SECTION 3.8.5. DC SOURCES - SHUTDOWN Description of Current Condition Technical Specifications (TS) Limiting Condition for Operation (LCO) 3.8.3, "Diesel Fuel Oil and Starting Air," provides the operability requirements, allowed conditions, required actions, completion times, and surveillance requirements for two supporting functions for the Emergency Diesel Generators (EDG). One of the supporting functions is the EDG starting air subsystem.
Surveillance Requirement (SR) 3.8.3.3 states that the DG air start receiver pressure must be > 210 psig for the EDG to be operable. However, Condition D allows for a period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> before the EDG would have to be declared inoperable if the air start receiver pressure is < 210 psig, but >100 psig. This 48-hour allowance for operability is based on the conclusion that although the EDG would no longer be capable of eight start attempts with the receiver pressure < 210 psig, the 100 psig would provide sufficient capacity for at least one start attempt, and hence there would be a high probability of the EDG starting.
Technical Specifications (TS) Limiting Condition for Operation (LCO) 3.8.5, "DC Sources -
Shutdown," provides the operability requirements, allowed conditions, required actions, completion times, and surveillance requirements for the DC Electrical Power System. Condition 3.8.5.A, "One or more required DC electrical power subsystems inoperable," has a specified Required Action of "A. 1.1 - Declare affected required feature(s) inoperable," followed by allowed alternate Actions A.2.1 through A.2.4.
Description and Justification of the Proposed Change The proposed change to TS 3.8.3 revises the minimum air start receiver pressure as specified in Condition D from 100 psig to 150 psig. The current value of 100 psig is non-conservative with the EDG vendor (Fairbanks Morse) recommendation of a minimum air pressure of 150 psig to ensure a reliable start. The proposed TS change will make the TS requirement consistent with the vendor recommendation. TS 3.8.3 requires that the EDG starting air receiver pressure be maintained greater than or equal to 210 psig, as verified monthly per SR 3.8.3.3. This higher pressure ensures a minimum of eight start attempts. The purpose of the lower specified pressure (100 psig being changed to 150 psig) is to allow for an extension of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to having to declare the EDG inoperable, based on the assessment that the minimum pressure will be sufficient for a reliable start for one attempt, The proposed change supports the intent of this TS LCO.
The proposed change to TS 3.8.5 corrects an editorial error related to TS number formatting.
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/10-0117 Page 2 of 4 No Significant Hazards Consideration Determination Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is proposing changes to Appendix A, Technical Specifications (TS), of Facility Operating License No. DPR-23, for the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The proposed changes will revise TS 3.8.3, "Diesel Fuel Oil and Starting Air," and TS 3.8.5, "DC Sources -
Shutdown." The proposed change to TS 3.8.3 revises the minimum ai? start receiver pressure as specified in Condition D from 100 psig to 150 psig. The current value of 100 psig is non-conservative with the EDG vendor (Fairbanks Morse) recommendation of a minimum air pressure of 150 psig to ensure a reliable start. The proposed TS change will make the TS requirement consistent with the vendor recommendation. The proposed change to TS 3.8.5 corrects an editorial error related to TS number formatting.
An evaluation of the proposed changes has been performed in accordance with 10 CFR 50.91 (a)(1) regarding no significant hazards considerations, using the standards in 10 CFR 50.92(c). A discussion of these standards as they relate to this amendment request follows:
- 1. The Proposed Change Does Not Involve a Significant Increase in the Probability or Consequences of an Accident Previously Evaluated.
The proposed change to TS 3.8.3 revises a non-conservative value in the current TS for EDG air start pressure. The proposed value is consistent with vendor recommendations and will ensure that the intent of the TS requirement is met. Therefore, the proposed change will provide improved assurance that the EDGs will be able to meet their safety function.
The proposed change to TS 3.8.5 is an editorial correction and there will be no actual changes to plant design or operation.
Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. The Proposed Change Does Not Create the Possibility of a New or Different Kind of Accident From Any Previously Evaluated.
As described above, the proposed change to TS 3.8.3 provides improved assurance that the EDGs will be able to meet their safety function. No new failure modes are introduced.
Therefore, no new accident initiators or precursors are introduced by the proposed change.
The proposed change to TS 3.8.5 is an editorial correction and there will be no actual changes to plant design or operation.
Therefore, operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any previously evaluated.
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/10-01 17 Page 3 of 4
- 3. The Proposed Change Does Not Involve a Significant Reduction in the Margin of Safety.
As described above, the proposed change to TS 3.8.3 provides improved assurance that the EDGs will be able to meet their safety function of mitigating events that involve a loss of offsite power. Therefore, the proposed change will preserve any margin of safety.
The proposed change to TS 3.8.5 is an editorial correction and there will be no actual changes to plant design or operation.
Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant reduction in the margin of safety.
Based on the above discussion, Carolina Power and Light Company has determined that the requested change does not involve a significant hazards consideration.
Environmental Impact Consideration 10 CFR 51.22(c)(9) provides criteria for identification of licensing and regulatory actions for categorical exclusion from performing an environmental assessment. A proposed change for an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed change would not (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increases in the amounts of any effluents that may be released offsite; (3) result in a significant increase in individual or cumulative occupational radiation exposure. Carolina Power and Light Company, also known as Progress Energy Carolinas (PEC), Inc., has reviewed this request and determined the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows.
Proposed Change Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), is proposing changes to Appendix A, Technical Specifications (TS), of Facility Operating License No. DPR-23, for the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The proposed changes will revise TS 3.8.3, "Diesel Fuel Oil and Starting Air," and TS 3.8.5, "DC Sources -
Shutdown." The proposed change to TS 3.8.3 revises the minimum air start receiver pressure as specified in Condition D from 100 psig to 150 psig. The current value of 100 psig is non-conservative with the EDG vendor (Fairbanks Morse) recommendation of a minimum air pressure of 150 psig to ensure a reliable start. The proposed TS change will make the TS requirement consistent with the vendor recommendation. The proposed change to TS 3.8.5 corrects an editorial error related to TS number formatting.
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/10-01 17 Page 4 of 4 Basis The proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) for the following reasons:
- 1. As demonstrated in the No Significant Hazards Consideration Determination, the proposed change does not involve a significant hazards consideration.
- 2. As demonstrated in the No Significant Hazards Consideration Determination, the proposed change does not result in a significant increase in the consequences of an accident previously evaluated and does not result in the possibility of a new or different kind of accident. The proposed change is unrelated and hence has no impact on plant effluents from normal operation. Therefore, the proposed change does not result in a significant change in the types or significant increases in the amounts of any effluents that may be released offsite.
- 3. The proposed change does not alter any parameters that impact the individual and cumulative radiation exposure for HBRSEP, Unit No. 2. Therefore, the proposed change does not result in a significant increase in individual or cumulative occupational radiation exposures.
United States Nuclear Regulatory Commission Attachment III to Serial: RNP-RA/10-01 17 3 Pages (including cover page)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR, AND SECTION 3.8.5. DC SOURCES - SHUTDOWN MARKUP OF TECHNICAL SPECIFICATIONS PAGES
Diesel Fuel Oil, and Starting Air 3.8.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. One or more DGs with C.1 Restore stored fuel oil 30 days new fuel oil properties properties to within not within limits, limits.
D. One or more DGs with D.1 Restore starting air 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> starting air receiver receiver pressure to pressure < 210 psig and > 210 psig.
410&-150 psig.
E. Required Action and E.1 Declare associated Immediately associated Completion DG(s) inoperable.
Time not met.
OR Common stored DGs diesel fuel oil or starting air subsystem for each DG not within limits for reasons other than Condition A, B, C, or D.
HBRSEP Unit No. 2 3.8-17 Amendment No. 1-7-6
DC Sources - Shutdown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources-Shutdown LCO 3.8.5 DC electrical power subsystem shall be OPERABLE to support the DC electrical power distribution subsystem(s) required by LCO 3.8.10, "Distribution Systems- Shutdown."
APPLICABILITY: MODES 5 and 6, and During movermnent of irradiated fuel assemblies.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DC A.14 Declare affected Immediately electrical power required feature(s) subsystems inoperable, inoperable.
OR A.2.1 Suspend CORE Immediately ALTERATIONS.
AND A.2.2 Suspend movement of Immediately irradiated fuel assemblies.
AND (continued)
HBRSEP Unit No. 2 3.8-22 Amendment No. 4-7-6
United States Nuclear Regulatory Commission Attachment IV to Serial: RNP-RA/10-0117 3 Pages (including cover page)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR, AND SECTION 3.8.5, DC SOURCES - SHUTDOWN RETYPED TECHNICAL SPECIFICATIONS PAGES
Diesel Fuel Oil, and Starting Air 3.8.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. One or more DGs with C.1 Restore stored fuel oil 30 days new fuel oil properties properties to within not within limits, limits.
D. One or more DGs with D.1 Restore starting air 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> starting air receiver receiver pressure to pressure < 210 psig and > 210 psig.
_ 150 psig.
E. Required Action and E.1 Declare associated Immediately associated Completion DG(s) inoperable.
Time not met.
OR Common stored DGs diesel fuel oil or starting air subsystem for each DG not within limits for reasons other than Condition A, B, C, or D.
HBRSEP Unit No. 2 3.8-17 Amendment No.
DC Sources - Shutdown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources-Shutdown LCO 3.8.5 DC electrical power subsystem shall be OPERABLE to support the DC electrical power distribution subsystem(s) required by LCO 3.8.10, "Distribution Systems - Shutdown."
APPLICABILITY: MODES 5 and 6, and During movement of irradiated fuel assemblies.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DC A.1 Declare affected Immediately electrical power required feature(s) subsystems inoperable, inoperable.
OR A.2.1 Suspend CORE Immediately ALTERATIONS.
AND A.2.2 Suspend movement of Immediately irradiated fuel assemblies.
AND (continued)
HBRSEP Unit No. 2 3.8-22 Amendment No.
United States Nuclear Regulatory Commission Attachment V to Serial: RNP-RA/10-0117 2 Pages (including cover page)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR, AND SECTION 3.8.5. DC SOURCES - SHUTDOWN RETYPED TECHNICAL SPECIFICATIONS BASES PAGES
Diesel Fuel Oil and Starting Air B 3.8.3 BASES ACTIONS C.1 (continued) may involve feed and bleed procedures, filtering, or combinations of these procedures. Even if a DG start and load was required during this time interval and the fuel oil properties were outside limits, there is a high likelihood that the DG would still be capable of performing its intended function.
D.1 With starting air receiver pressure < 210 psig, sufficient capacity for eight successive DG start attempts does not exist. However, as long as the receiver pressure is > 150 psig, there is adequate capacity for at least one start attempt, and the DG can be considered OPERABLE while the air receiver pressure is restored to the required limit. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration to the required pressure prior to declaring the DG inoperable. This period is acceptable based on the remaining air start capacity, the fact that most DG starts are accomplished on the first attempt, and the low probability of an event during this brief period.
E.1 With a Required Action and associated Completion Time not met, or one or more DG's fuel oil, or starting air subsystem not within limits for reasons other than addressed by Conditions A through D, the associated DGs may be incapable of performing its intended function and must be immediately declared inoperable.
SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate inventory of fuel oil in the storage tanks to support one DG's operation for 7 days at full load. The 7 day period is sufficient time to place the unit in a safe shutdown condition and to bring in replenishment fuel from an offsite location.
(continued)
HBRSEP Unit No. 2 B 3.8-35 Revision No.