RIS 2001-25, NEI 99-02, Revision 2: Voluntary Submission of Performance Indicator Data

From kanterella
(Redirected from RIS 2001-25)
Jump to navigation Jump to search
NEI 99-02, Revision 2: Voluntary Submission of Performance Indicator Data
ML013340212
Person / Time
Issue date: 12/12/2001
From: Imbro E
Operational Experience and Non-Power Reactors Branch
To:
Thompson John T., NRR/DIPM, 301-415-1011
References
NEI 99-02, OMB-3150-0195 RIS-01-025
Download: ML013340212 (5)


OMB Control No.: 3150-0195 UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001 December 12, 2001 NRC REGULATORY ISSUE SUMMARY 2001-25 NEI 99-02, REVISION 2, VOLUNTARY SUBMISSION OF

PERFORMANCE INDICATOR DATA

ADDRESSEES

All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)

to inform power reactor licensees that the NRC has endorsed the Nuclear Energy Institutes (NEIs), Regulatory Assessment Performance Indicator Guideline, NEI 99-02, Revision 2, for addressee use in collecting and reporting performance indicator (PI) data to the NRC. PI data provides input to the Reactor Oversight Process (ROP), the NRCs process for overseeing the performance of nuclear power reactor plants. This RIS requires no action or written response on the part of addressees.

BACKGROUND INFORMATION

The NRC began implementing the ROP on April 2, 2000. The ROP uses PI information, along with results from the reactor inspection program, as the basis for assessing plant performance and determining the appropriate regulatory response. PIs are objective, periodic measures of plant performance and the effectiveness of licensee programs. PI data is a basic element of the ROP and is expected to reduce NRC regulatory burden on licensees.

The PI data provides a broad sample of information on licensee safety performance. The data is not intended to cover every aspect of plant design and operation. The data objectively indicates the performance of plant systems and licensee programs in specific risk-significant areas. The NRC compares the PI data submitted by a licensee to risk-informed, objective thresholds to assess plant performance within cornerstone areas. Reporting of PI data to the NRC is a voluntary program in which all licensees participate.

ISSUE SUMMARY

During initial implementation of the ROP, the NRC established a formal process to (1) address questions and feedback from internal and external stakeholders, (2) make changes to existing PIs and thresholds based on lessons learned, and (3) develop new PIs and thresholds. The process provides an opportunity for NRC and industry personnel to raise questions regarding interpretation of the reporting criteria. These frequently asked questions (FAQs) are reviewed at periodic public meetings of the NRC/Industry ROP Working Group to resolve issues raised and to develop approved responses.

Revision 2 to NEI 99-02 incorporates changes to reflect the insights gained from the resolution of FAQs and contains new guidance on resetting fault exposure hours for reporting data for the safety system unavailability PI. In addition, it incorporates minor changes to several PI

definitions and some clarifications to the reporting guidance. The revised document is expected to reduce unnecessary reporting burdens and provide clearer guidance to power reactor licensees on the accurate and consistent reporting of PI information.

The effectiveness of the PIs in the ROP depends upon the submission of accurate data by addressees for their respective reactor facilities in accordance with the guidance in NEI 99-02, Revision 2. The NRC has endorsed this industry document for addressee use in reporting PI

data.

PIs will continue to be refined as experience is gained with the ROP. Changes will be made in accordance with the formal change process (which gives stakeholders an opportunity to comment) and will be published in subsequent revisions to NEI 99-02. The NRC anticipates that the voluntary reporting of PI data will contribute to a more objective assessment of plant performance and will reduce regulatory burden on licensees as a result of the offsetting reduction in NRC inspection under the ROP.

Addressees

may wish conform to the guidance contained in this RIS for the voluntary reporting of PI data. As indicated in NEI 99-02, Revision 2, the PI data can be provided as an attachment to an e-mail to <pidata@nrc.gov>. The guidance contained in this revision is effective for data collection as of January 1, 2002, which is the beginning of the first reporting quarter. All subsequent PI data should be submitted on or before the 21st day of the month following the end of the reporting quarter.

BACKFIT DISCUSSION

This RIS requires no action or written response. Any action on the part of addressees to collect and transmit PI data in accordance with the guidance contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109. Therefore, the staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register because the NRC has worked closely with NEI, industry representatives, members of the public, and other stakeholders since early 1998 on the development of NRCs ROP and the collection of PI data. The NRC has solicited public comments on its intention to collect PI data in five Federal Register notices (dated January 22, April 19, May 26, July 19, and August 11, 1999) and at numerous public meetings.

PAPERWORK REDUCTION ACT STATEMENT

This RIS contains a voluntary information collection that is subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. The collection of this information is covered by OMB clearance number 3150-0195, which expires on October 31, 2002.

If you have any questions about this matter, please telephone or e-mail the technical contact listed below.

/Patrick M. Madden Acting for/

Eugene V. Imbro, Chief Operational Experience and Non-Power Reactors Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation

Technical Contact:

John W. Thompson, NRR

301-415-1011 E-mail: jwt1@nrc.gov Attachment: List of Recently Issued NRC Regulatory Issue Summaries

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register because the NRC has worked closely with NEI, industry representatives, members of the public, and other stakeholders since early 1998 on the development of NRCs ROP AND

the collection of PI data. The NRC has solicited public comments on its intent to collect PI data in five Federal Register notices (dated January 22, April 19, May 26, July 19, and August 11,

1999), and at numerous public meetings.

PAPERWORK REDUCTION ACT STATEMENT

This RIS contains a voluntary information collection that is subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. The collection of this information is covered by OMB clearance number 3150-0195, which expires on October 31, 2002.

If you have any questions about this matter, please telephone or e-mail the technical contact listed below.

/Patrick M. Madden Acting for/

Eugene V. Imbro, Chief Operational Experience and Non-Power Reactors Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation

Technical Contact:

John W. Thompson, NRR

301-415-1011 E-mail: jwt1@nrc.gov Attachment: List of Recently Issued NRC Regulatory Issue Summaries Distribution:

RIS Reading File PUBLIC

ACCESSION NO.: ML013340212 Template #: NRR-052 OFFICE

DIPM:IIPM

Tech Editor DIPM:IIPM

OGC*

NAME

J.Thompson*

PKleene*

MJohnson*

RKHoefling DATE

11/01/2001

11/09/2001

11/06/2001

11/28/2001 REXB

C:REXB

JTappert EImbro/PMMadden/

12/06/2001

12/11/2001 OFFICIAL RECORD COPY

______________________________________________________________________________________

OL = Operating License CP = Construction Permit Attachment LIST OF RECENTLY ISSUED

NRC REGULATORY ISSUE SUMMARIES

_____________________________________________________________________________________

Regulatory Issue Date of Summary No.

Subject Issuance Issued to

_____ _______________________________________________________________________________

2001-24 Status of Receipt of NRC Mail Following the Closing of the Brentwood Postal Facility

12/06/2001 All NRC licensees

2001-23 Resetting Fault Exposure Hours for Safety System Unavailability Performance Indicators

12/03/2001 All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel

2001-22 Attributes of A Proposed No Significant Hazards Consideration Determination

11/20/2001 All holders of operating licenses for nuclear power reactors, including those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel

2001-21 Licensing Action Estimates for Operating Reactors

11/16/2001 All power reactor licensees, including those that have elected to permanently cease operations and have submitted certifications pursuant to Title 10, Section

50.82(a)(1), of the Code of Federal Regulations (10 CFR 50.82(a)(1))

2001-20

Revisions to Staff Guidance for Implementing NRC Policy on Notices of Enforcement Discretion

11/14/2001 All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel