( ~ DUKE ENERGY Serial: RA-26-0048 March 12, 2026 Mr. Jason Bundy Senior Operations Engineer U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 Joe Rackley H. B. Robinson Steam Electric Plant Unit 2 Manager-Nuclear Training Duke Energy 3581 West Entrance Road Hartsville, SC 29550 0 : 843 951 1625 Joe.Rack/ey@duke-energy.com 10 CFR 55.40 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES

Dear Mr. Bundy:

In accordance with the guidelines in Revision 12 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy Progress, LLC is providing the enclosed outlines for examinations scheduled to begin the week of August 10, 2026.

Pursuant to 10 CFR 55.40(b)(3), Mr. Mark Santalla, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.

As required by Revision 12 of NUREG-1021, Section ES-1.3, "Exam Security," please ensure that these outlines are withheld from public disclosure until after the examinations are complete.

If you have any questions concerning this matter, please contact Mr. Mark Santalla at (843) 951-1825.

United States Nuclear Regulatory Commission Serial: RA-26-0048 Page 2 of 2 JR/wos Enclosure c:

Document Control Desk (w/o Enclosure)

NRC Resident Inspector, HBRSEP (w/o Enclosure)

NRC Regional Administrator, Region II (w/o Enclosure)

Mrs. Maria Elena Herrera Torres, P.E., NRC Project Manager, NRR (w/o Enclosure)

Mr. Matthew Endress, NRC, Region II (w/o Enclosure)