Press Release-III-07-009, - Ncr to Discuss 2006 Performance Assessment for Monticello Nuclear Power Plant

From kanterella
Jump to navigation Jump to search
Press Release-III-07-009 - Ncr to Discuss 2006 Performance Assessment for Monticello Nuclear Power Plant
ML070890322
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/29/2007
From:
Office of Public Affairs Region II
To:
Category:Press Release
References
Press Release-III-07-009
Download: ML070890322 (2)


Text

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION 2443 Warrenville Road Lisle IL 60532 Web Site: http://www.nrc.gov E-mail: opa3@nrc.gov No. III-07-009 March 29, 2007 CONTACT: Viktoria Mitlyng (630) 829-9662 NRC TO DISCUSS 2006 PERFORMANCE ASSESSMENT FOR MONTICELLO NUCLEAR POWER PLANT The Nuclear Regulatory Commission staff will meet with representatives of Nuclear Management Co. on Wednesday, April 4, to discuss the agencys assessment of safety performance for last year at the Monticello Nuclear Power Plant. The plant is located in Monticello, Minn.

The meeting, which will be open to the public, is scheduled to begin at 9 a.m. at the Monticello Training Center, MPR Meeting Room, 2100 W. River St., Monticello. The NRC staff will present the results of the assessment and be available to respond to questions or comments from the public before the close of the meeting.

The public may also participate in the meeting through a telephone conference call. For instructions on how to participate, interested persons should contact Bruce Burgess at 630/829-9629.

The NRC continually reviews the performance of the Monticello plant and the nations other commercial nuclear power facilities, NRC Region III Administrator James Caldwell said. This meeting will provide an opportunity for a discussion of our annual assessment of safety performance with the company and with local officials and residents who live near the plant. Our goal is to explain the NRC oversight process and make as much information as possible available to the public regarding our regulation of these facilities.

A letter sent from the NRC Region III Office to plant officials addresses the performance of the plant during the period and will serve as the basis for the meeting discussion. It is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/mont_2006q4.pdf The NRCs assessment concluded that the Monticello plant operated safely during the period.

The NRC uses color-coded inspection findings and performance indicators to assess nuclear plant performance. The colors start with green and then increase to white, yellow or red, commensurate with the safety significance of the issues involved.

All of the inspection findings and performance indicators for Monticello during 2006 were determined to be green. As a result of this performance, the NRC will conduct the normal, baseline level of inspections during the upcoming year.

Routine inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region III Office in Lisle, Ill., and the agencys headquarters in

Rockville, Md. Among the areas of plant operations to be inspected this year by NRC specialists are equipment testing and inspection, emergency preparedness, fire protection, effluent monitoring, and engineering and design control. The agency will also perform a pre-operational inspection of the plants spent fuel cask storage facility.

Current performance information for Monticello is available on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/MONT/mont_chart.html NRC news releases are available through a free list server subscription at the following Web address:

http://www.nrc.gov/public-involve/listserver.html . The NRC Home Page at www.nrc.gov also offers a Subscribe to News link in the News & Information menu. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web Site.