CLEVELAND ELECTRIC ILLUMINATING COMPANY.

PERRY NUCLEAR POWER PLAlfr MARCH 1,1988 - MARCH 31,1988 M0ffrHLY OPERATING R2. PORT TO NRC DOCKET NUMBER:

50-440 LICENSE NUMBER: NPF-38 5

i s

i i

8804190081 880331 3

/j i PDR ADOCK 05000440 R

DCD

V Table of Contents Average Daily Unit Power Level................

1 Operating Data Report.

.2 Unit Shutdowns and Power Reductions.

.3 l

l l

l l

l i

l

i Avarege Daily Unit Power Lsvel DOCKET No.

50-440-( -

DATE-4/10/88 UNIT Perry-1 Contact G.A.Dunn Telephone (216)259-3737 HONTH Harch 1988 DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net)

(MVe-Net) 1 1194 17 1191 2

1188 18 1191 l

3 1192 19 1188 4

1191 20 1010 5

1190 21 935 6

1177 22 933 7

1186 23 922 8

1173 24 927 9

1186 25 926 10 1192 26 930 I

11 1191 27 938 12 1186 28 1036 13 1076 29 1174 14 1192 30 1185 15 1192 31 1190 16 1192 INSTRUCTIONS On this form list the average daily unit power level in MVe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

~

Oparating Data Report UNIT:

Perry-1 DATE:

4/10/88 OPERATING STATUS 1.

Docket:

50-440 2.

Reporting Period:

March 1988 3.

Utility

Contact:

G,.A.

Dunn (216) 259-3737 4.

Licensed Thermal Power (MVt):

3579 5.

Nameplate Rating (Gross MVe):

1250 6.

Design Electrical Rating (Net MVe): 1205 7.

Maximum Dependable Capacity (Gross MVe):

1250 (Estimated) 8.

Maximum Dependable Capacity (Net MVe):

1205 (Estimated) 9.

If Changes Occur in Capacity Ratings (Item Numbers 5 through 7) Since Last Report, Give Reasons:

None

10. Power Level To Which Restricted, If Any (Net MVe):

100%

11. Reasons for Restrictions, If Any:

Technical Specification Limit This Month Yr-to-Date Cumulative

12. Hours In Reporting Period 744 2,184 3,228
13. Hours Reactor Vas Critical 744 1,525.5 2,336.8
14. Reactor Reserve Shutdown Hours 0

0 0

15. Hours Generator On-Line 744 1,441.3 2,214.7
16. Unit Reserve Shutdown Hours 0

0 0

17. Gross Thermal Energy (MVH) 2,510,544 4,759,711 7,321,230 l
18. Gross Electrical Energy (MVH) 872,166 J,642,909 2,521,371
19. Net Electrical Energy (MVH) 829.758 1,548,183 2,376,667
20. Unit Service Factor 100 66 68.6
21. Unit Availability Factor 100 66 68.6
22. Unit Capacity Factor (Using HDC Net) 92.6 58.8 61.1 l
23. Unit Capacity Factor (Using l

DER Net) 92.6 38.8 61.1 l

24. Unit Forced Outage Rate 0

7.5 14.9 l

25. Forced Outage Hours 0

116.8 387.4

26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

None 27.

If Shut Down at end of Report Period, Estimated Date of Startup:

N/A i

l

UNIT SilDTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-440 UNIT NAME Perry-l REPORT MONTil March, 1988 DATE 4-10-88 CONTACT G. Dunn TELEP110NE (216) 259-3737

'7.

M a

o eo.o.

c c4 c

~;

j)[;

g, jj o Licensee E,

  • d; Cause & Corrective g, g Action to No.

Date R

ag cj a y Event u

  • yj y ajg Report #

g-[j gu Prevent Recurrence H

av X ses o o

n 1

3-20-88 F

197 A

5 SB ISV During monthly testing on March 20, one inboard Main Steam Isolation Valve exhibited a delay in opening after successful closure.

Pending the completion of further testing to assure safety functions were not af fected, one Main Steam Line was isolated and power was conservatively reduced to 80%.

Upon successful completion of the testing, normal plant operation was resumed on March 28.

SUMMARY

Perry-l experienced I forced pcuer reduction in March for reasons stated above.

'F:

Forced Reason:

Method:

Exhibit C - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Haintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Continued 1022)

E-Operator Training &

5.-Reduced Load License Examination 9-Other 5Exhibit 1-Same Source F-Administrative C-Operational Error (Explain)

H-Other (Explain)

[

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O.

DOX 97 m

PERRY. OHIO 44081 m

TELEPHONE (216) 259-3737 m

ADDRESS-to CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan April 15, 1983 wce mescocui PY-CEI/NRR-0833 L NUCLEAR GaovP U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report

Dear Sir:

Attached is the March 1988 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If there are any questions, please f eel f ree to call.

Very truly yours, 4

  • hl,

m W-Al Kaplan Vice President Nuclear Group AK: cab Attachment cc: