ML12177A363

From kanterella
Jump to navigation Jump to search

Cyber Security, Attachment 2 to Pnp 2012-046, Proposed Pnp Operating Change (Mark-up)
ML12177A363
Person / Time
Site: Palisades 
Issue date: 06/20/2012
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML121770439 List:
References
PNP 2012-046
Download: ML12177A363 (5)


Text

Attachment 2 PNP 201 2-046 Proposed PNP Operating License Change (mark-up)

(showing proposed change; addition is highlighted)

6--

D.

The facility has been granted certain exemptions from the requirements of Section III, G of Appendix R to 10 CFR Part 50, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979. This section relates to fire protection features for ensuring the systems and associated circuits used to achieve and maintain safe shutdown are free of fire damage. These exemptions were granted in letters dated February 8, 1983, July 12, 1985, and July 23, 1985.

In addition, the facility has been granted certain exemptions from Appendix J to 10 CFR Part 50, Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors. This section contains leakage test requirements, schedules and acceptance criteria for tests of the leak-tight integrity of the primary reactor containment and systems and components which penetrate the containment. These exemptions were granted in a letter dated December 6, 1989.

These exemptions granted pursuant to 10 CFR 50.12, are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

ENO shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: Entergy Nuclear Palisades Nuclear Plant Physical Security Plan.

END shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CSP was approved by License Amendment No. 243 (as supplemented by a clarification approved by License Amendment No. 2xx).

F.

[deleted]

G.

ENP and END shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

Renewed License No. DPR-20 Amendment No. 224, 2, 241-, 243 PNP 201 2-046 Renewed Operating License Page Change Instructions and Revised PNP Operating License Page 2 pages follow

ATTACHMENT TO LICENSE AMENDMENT NO.

RENEWED FACILITY OPERATING LICENSE NO. DPR-20 DOCKET NO. 50-255 Remove the following page of the Renewed Facility Operating License and replace with the attached revised page. The revised page is identified by amendment number and contains a line in the margin indicating the area of change.

REMOVE INSERT Page 6 Page 6

6 D.

The facility has been granted certain exemptions from the requirements of Section III, G of Appendix R to 10 CFR Part 50, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979. This section relates to fire protection features for ensuring the systems and associated circuits used to achieve and maintain safe shutdown are free of fire damage. These exemptions were granted in letters dated February 8, 1983, July 12, 1985, and July 23, 1985.

In addition, the facility has been granted certain exemptions from Appendix J to 10 CFR Part 50, Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors. This section contains leakage test requirements, schedules and acceptance criteria for tests of the leak-tight integrity of the primary reactor containment and systems and components which penetrate the containment. These exemptions were granted in a letter dated December 6, 1989.

These exemptions granted pursuant to 10 CFR 50.12, are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

ENO shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: Entergy Nuclear Palisades Nuclear Plant Physical Security Plan.

ENO shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CSP was approved by License Amendment No. 243 (as supplemented by a clarification approved by License Amendment No. 2xx).

F.

[deleted]

G.

ENP and ENO shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

Renewed License No. DPR-20 Amendment No. 243, 2xx