NRC Generic Letter 80-43, IEB 80-13 Cracking in Core Spray Spargers
text
GL80043
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
May 12, 1980
MEMORANDUM FOR: B. H. Grier, Director, Region I J. P. O'Reilly, Director, Region II J. G. Keppler, Director, Region III K. V. Seyfrit, Director, Region IV R. H. Engelken, Director, Region V
FROM: Norman C. Moseley, Director, Division of Reactor Operations Inspection, Office of Inspection and Enforcement
SUBJECT: IE BULLETIN No. 80-13 - CRACKING IN CORE SPRAY SPARGERS
The subject IE Bulletin should be dispatched for action May 12, 1980 to all BWR's with an operating license. The Bulletin should be sent for information to BWR facilities with a construction permit.
The text of the Bulletin and draft letter to licensees are enclosed for this purpose.
Norman C. Moseley, Director Division of Reactor Operations Inspection Office of Inspection and Enforcement
Enclosure:
- 1. Draft Transmittal Letter
CONTACT
- R. A. Hermann, IE 49-28180
.
(Draft letter to BWR power reactor facilities with an operating license)
Addressee:
Enclosed is IE Bulletin No. 80-13 which requires action by you with regard to your power reactor facility(ies) with an operating license.
Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.
Sincerely,
Signature (Regional Director)
Enclosures:
- 2. List of Recently Issued IE Bulletins
.
(Draft letter to all GE power reactor facilities with a construction permit.)
IE Bulletin No. 80-13
Addressee:
The enclosed IE Bulletin No. 80- 13 is forwarded to you for information. No written response is required. If you desire additional information regarding this matter, please contact this office.
Sincerely,
Signature (Regional Director)
Enclosures:
- 2. List of Recently Issued IE Bulletins