NRC Generic Letter 1987-13

From kanterella
Jump to navigation Jump to search
NRC Generic Letter 1987-013: Integrity of Requalification Examinations at Non-Power Reactors
ML031140385
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane
Issue date: 07/10/1987
From: Miraglia F
Office of Nuclear Reactor Regulation
To:
References
GL-87-013, NUDOCS 8707130260
Download: ML031140385 (6)


UNITED STATES

NOCLEAR REGULATOAY COMMISSION

WASHINGTON, D. C.20555 July 10, 1987 TO ALL NON-POWER REACTOR LICENSEES

Gentlemen:

Subject: INTEGRITY OF REQUALIFICATION EXAM'INATIONS--AT NON-POWER REACTORS

(GENERIC LETTER 87-13 )

The purpose of this Generic Letter is to clarify the staff positionidentified concerning requalification examinations at non-power reactors. NRC recently several licensees that allow requalification examinations to be done at home or on-shi'ft. This is not an acceptable means for certifying individual performance, In accordance with the regulations and as further clarified inthe guidance given in Generic Letter 83-17, issued on April 8, 1983.

In the course of reviewing this matter, we discovered that non-power reactor licensees were'-inadvertently omitted from distribution of Generic Letter 83-17 In 1983. This oversight was corrected when Generic Letter 83-17 was transmit- ted on May 22,-1987, as an attachment to Information Notice No. 87-22. NRC

inspectors are aware that licensees have only recently received a copy of Generic Letter 83-17..-

Please review Information Notice No. 87-22 for applicability to your operator requalification program and consider any appropriate actions. However, this letter is for information only and no specific action'or written response is required.

Questions on this matter should be addressed to Mr. Alexander Adams, Jr., at

301-492-8207.

Sincerely, Frank J. I~ragl a 57.rL_

Associate Director fdr Projects Office of Nuclear Reactor Regulation

.7bb -&<

8 70 7 1 30 2 6 0 za 0 (.Apz

, - WS

LIST OF RECENTLY ISSUED GEl , LETTERS

\-SeI

Generc Date of Letter No. Subject Issuance Issued To GL 87-13 INTEGRITY OF REQUALIFICATION 07/10/97 ALL NON-POWER

EXAMINATIONS AT NON-POWER REACTOR

REACTORS LICENSEES

GL 87-12 50.54(f) LETTER RE. LOSS OF 07/09/87 ALL LICENSEES

RESIDUAL HEAT REMOVAL (RHR) OF OPERATING

DURING MID-LOOP OPERATION PWRS AND

HOLDERS OF

CONSTRUCTION

PERMITS FOR

PWRS

GL 87-11 RELAXATION IN ARBITRARY 06/23/87 ALL OPERATING

INTERMEDIATE PIPE RUPTURE LICENSEES,

REQUIREMENTS CONSTRUCTION

PERMIT

HOLDERS, AND

APPLICANTS FOR

CONSTRUCTION

PERMITS

GL 87-10 IMPLEMENTATION OF 10 CFR 06/12/97 ALL POWER

73.57, REQUIREMENTS FOR FBI REACTOR

CRIMINAL HISTORY CHECKS LICENSEES

SL 87-09 SECTIONS 3.0 AND 4.0 OF THE 06/04/87 ALL LIGHT

STANDARD TECHNICAL WATER REACTOR

SPECIFICATIONS ON THE LICENSEES AND

APPLICABILITY OF LCO AND APPLICANTS

SURVEILLANCE REQUIREMENTS

SL 97-08 IMPLEMENTATION OF 10 CFR 73.55 05/11/87 ALL POWER

MISCELLANEOUS AMENDMENTS AND REACTOR

SEARCH REQUIREMENTS LICENSEES

GL 87-07 INFORMATION TRANSMITTAL OF 03/19/87 ALL FACILITY

FINAL RULEMAKING FOR REVISIONS LICENSEES

TO OPERATOR LICENSINS-1OCFR55 AND CONFORMING AMENDMENTS

GL 87-06 TESTING OF PRESSURE JSOLATION 03/13/87 ALL OPERATING

VALVES REACTOR

LICENSEES

.L 97-05 REQUEST FOR ADDITIONAL 03/12/97 LICENSEES OF

INFORMATION-ASSESSMENT OF OR'S, .

LICENSEE MEASURES TO MITIGATE APPLICANTS FOR

AND/OR IDENTIFY POTENTIAL OL'S, AND

DEGRADATION MKI HOLDERS OF

CP'S FOR SWR

UNITED STAl rES r MARK I

CONTAINMENTS FIRST CLASS MAIL

NUCLEAR REGULATORY COMMISSION POSTASG > FEES PAID

WASHINGTON, D.C. 2055 C.WAUM. USNRCB.C.

PERMIT No. 0s7 OFFICIAL BUSINI ESS

PENALTY FOR PRIVATE USE. 8300

July 10, 1987 TO ALL NON-POWER REACTOR LICENSEES

Gentlemen:

Subject: INTEGRITY OF REQUALIFICATION EXAMINATIONS AT NON-POWER REACTORS

(GENERIC LETTER 87-13 )

The purpose of this Generic Letter is to clarify the staff position concerning requalification examinations at non-power reactors. NRC recently identified several licensees that allow requalification examinations to be done at home or on-shift. This is not an acceptable means for certifying individual performance in accordance with the regulations and as further clarified in the guidance given in Generic Letter 83-17, issued on April 8, 1983.

In the course of reviewing this matter, we discovered that non-power reactor licensees were inadvertently omitted from distribution of Generic Letter 83-17 in 1983. This oversight was corrected when Generic Letter 83-17 was transmit- ted on May 22, 1987, as an attachment to Information Notice No. 87-22. NRC

inspectors are aware that licensees have only recently received a copy of Generic Letter 83-17.

Please review Information Notice No. 87-22 for applicability to your operator requalification program and consider any appropriate actions. However, this letter is for information only and no specific action or written response is required.

Questions on this matter should be addressed to Mr. Alexander Adams, Jr., at

301-492-8207.

Sincerely, Frank J. Miraglia Associate Director for Projects

8707130260 Office of Nuclear Reactor Regulation

  • See Previous Concurrences PDSNP* PDSNP* PDSNP* Tech. Ed.* LOLB* ORPB*

EHylton AAdams:bd HBerkow DGable JHannon TOMartin

06/11/87 06/11/87 06/11/87 06/11/87 06/25/87 07/02/87 A AD

c der ' eld 1 FM agli/

07/7/87 07/g /87 07//o/87

-

TO ALL NON-POWER REACTOR LICENSEES

Gentlemen:

Subject: INTEGRITY OF REQUALIFICATION EXAMINATIONS AT NON-POWER REACTORS

(GENERIC LETTER 87- )

The purpose of this Generic Letter is to clarify the staff position concerning requalification examinations at non-power reactors. NRC recently Identified several licensees that allow requalification examinations to be done at home or on-shift. This is not an acceptable means for certifying individual performance in accordance with the regulations and as further clarified in the guidance given in Generic Letter 83-17, issued on April 8, 1983.

In the course of reviewing this matter, we discovered that non-power reactor licensees were inadvertently omitted from distribution of Generic Letter 83-17 in 1983. This oversight was corrected when Generic Letter 83-17 was transmitted on May 22, 1987, as an attachment to Information Notice No. 87-22. NRC inspectors are aware that licensees have only recently received a copy of Generic Letter 83-17.

Please review Information Notice No. 87-22 for applicability to your operator requalification program and consider any appropriate actions. However, this letter is for information only and no specific action or written response is required.

Questions on this matter should be addressed to Mr. Alexander Adams, Jr., at

301-492-8207.

Sincerely, Dennis M. Crutchfield, Director Division of Reactor Projects - III,

IV, V and Special Projects Office of Nuclear Reactor Regulations

  • See Previous Concurrence PDSNP* PDSNP* PDSNP* Tech. Ed.* LOLEt ORPB -W"#

EHylton AAdams:bd HBerkow DGable JHaioh TOMartin

06/11/87 06/11/87 06/11/87 06/11/87 06,JW/-i/87

87 ADR4 DRSP

FSchroeder DCrutchfield

)D /87 /87

I

TO ALL NON-POWER REACTOR LICENSEES

Gentlemen:

Subject: INTEGRITY OF REQUALIFICATION EXAMINATIONS AT NON-POWER REACTORS

(GENERIC LETTER 87- )

The purpose of this Generic Letter is to clarify the staff position concerning requalification examinations at non-power reactors. NRC recently identified several licensees that allow requalification examinations to be done at home or on-shift. This is not an acceptable means for certifying individual performance in accordance with the regulations and as further clarified in the guidance given in Generic Letter 83-17, issued on April 8, 1983.

In the course of reviewing this matter, we discovered that non-power reactor licensees were inadvertently omitted from distribution of Generic Letter 83-17 in 1983. This oversight was corrected when Generic Letter 83-17 was transmit- ted on May 22, 1987, as an attachment to Information Notice No. 87-22. NRC

inspectors are aware that licensees have only recently received a copy of Generic Letter 83-17.

Please review Information Notice No. 87-22 for applicability to your operator requalification program and consider any appropriate actions. However, this letter is for information only and no specific action or written response is required.

Questions on this matter should be addressed to Mr. Alexander Adams, Jr., at

301-492-8207.

Sincerely, Dennis M. Crutchfield, Director Division of Reactor Projects - III,

IV,V and Special Projects Office of Nuclear Reactor Regulations

  • See Previous Concurrences PDSNP* PDSNP* PDSNP* Tech. Ed.* LOLB* ORPB*

EHylton AAdams:bd HBerkow DGable JHannon TOMartin

06/11/87 06/11/87 06/11/87 06/11/87 06/25/87 07/02/87 ADR4 DRSP

ESehroeder rrutchfield 1- A 1 4 6L lA

0 /87 (6/ /87

07 on7

~-

TO ALL NON-POWER REACTOR LICENSEES

Gentlemen:

Subject: Integrity of Requalification Examinations at Non-Power Reactors (Generic Letter 87- )

The purpose of this Generic Letter is to clarify the staff position concerning requalification examinations at non-power reactors. NRC recently identified several licensees who are giving take-home or on-shift requalification examinations. This is not an acceptable means for certifying individual performance, as conveyed in the guidance given in Generic Letter 83-17, issued on April 8, 1983.

In the course of reviewing this matter, we discovered that non-power reactor licensees were inadvertently omitted from distribution of Generic Letter 83-17 in 1983. This oversight was corrected when Generic Letter 83-17 was transmitted on May 22, 1987, as an attachment to Information Notice No. 87-22.

Therefore, non-power reactor licensees who used take-home or on-shift requalification examinations prior to receipt of Information Notice No. 87-22, if otherwise in accordance with NRC-approved facility operator requalification programs, will not be considered in non-conformance with the guidance of Generic Letter 83-17.

Please review Information Notice No. 87-22 for applicability to your operator requalification program and consider any appropriate actions. However, this letter is for information only and no specific action or written response is required.

Questions on this matter should be addressed to Mr. Alexander Adams, Jr., at

301-492-8207.

Sincerely, Dennis M. Crutchfield, Director Division of Reactor Projects - III,

IV, V and Special Projects Office of Nuclear Reactor Regulations p PDS t ADR4 DRSP

t n Mda Ps.bd  ;*B_9k6w FSchroeder DCrutchfield

06/11 /87 06/d /87 06/1l/87 06/ /87 06/ /87 VJt~i

Template:GL-Nav