MONTHYEARNL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-23-0611, Core Operating Limits Report, Cycle 11 Version 12023-07-19019 July 2023 Core Operating Limits Report, Cycle 11 Version 1 NL-23-0330, Core Operating Limits Report, Cycle 25, Version 12023-04-26026 April 2023 Core Operating Limits Report, Cycle 25, Version 1 NL-22-0273, Core Operating Limits Report, Cycle 23, Version 12022-04-12012 April 2022 Core Operating Limits Report, Cycle 23, Version 1 NL-21-0962, Core Operating Limits Report, Cycle 24, Version 12021-10-26026 October 2021 Core Operating Limits Report, Cycle 24, Version 1 ML21046A0962021-02-15015 February 2021 Core Operating Limits Report, Cycle 1, Version 3 ND-21-0084, (VEGP) Unit 3 - Affidavits of Brian H. Whitley & Zachary S. Harper2020-12-11011 December 2020 (VEGP) Unit 3 - Affidavits of Brian H. Whitley & Zachary S. Harper NL-20-1130, Core Operating Limits Report, Cycle 22, Version 22020-09-29029 September 2020 Core Operating Limits Report, Cycle 22, Version 2 NL-20-0415, Vogle, Unit 1, Core Operating Limits Report Cycle 23 Version 32020-04-13013 April 2020 Vogle, Unit 1, Core Operating Limits Report Cycle 23 Version 3 NL-18-1356, Core Operating Limits Report, Cycle 22, Version 12018-10-30030 October 2018 Core Operating Limits Report, Cycle 22, Version 1 NL-17-1757, Core Operating Limits Report, Cycle 20, Version 12017-11-0202 November 2017 Core Operating Limits Report, Cycle 20, Version 1 NL-17-1063, Core Operating Limits Report, Cycle 21 Version 12017-06-0606 June 2017 Core Operating Limits Report, Cycle 21 Version 1 NL-16-0597, Cycle 19 Core Operating Limits Report, Version 22016-04-20020 April 2016 Cycle 19 Core Operating Limits Report, Version 2 NL-15-2014, Submittal of Core Operating Limits Reports2015-11-0202 November 2015 Submittal of Core Operating Limits Reports NL-15-1602, Cycle 19 Core Operating Limits Report Version 22015-08-21021 August 2015 Cycle 19 Core Operating Limits Report Version 2 NL-14-1719, Cycle 18 Core Operating Limits Report, Version 12014-10-30030 October 2014 Cycle 18 Core Operating Limits Report, Version 1 NL-14-0753, Cycle 19 Core Operating Limits Report2014-05-13013 May 2014 Cycle 19 Core Operating Limits Report ML14133A6772014-05-13013 May 2014 Cycle 19 Core Operating Limits Report NL-14-0753, Vogtle, Unit 1 - Cycle 19 Core Operating Limits Report2014-05-13013 May 2014 Vogtle, Unit 1 - Cycle 19 Core Operating Limits Report NL-13-0646, Cycle 17 Core Operating Limits Reports2013-04-0505 April 2013 Cycle 17 Core Operating Limits Reports NL-12-2622, Unit 1 Cycle 18 Core Operating Limits Report2012-12-19019 December 2012 Unit 1 Cycle 18 Core Operating Limits Report NL-11-2044, Cycle 16 Version 2 Core Operating Limits Report2011-10-26026 October 2011 Cycle 16 Version 2 Core Operating Limits Report NL-11-0919, Cycle 17 Core Operating Limits Report2011-05-16016 May 2011 Cycle 17 Core Operating Limits Report NL-10-1213, Cycle 15 Version 3 Core Operating Limits Report2010-06-28028 June 2010 Cycle 15 Version 3 Core Operating Limits Report NL-10-0662, Unit 2 Cycle 15 Version 2 Core Operating Limits Report2010-04-0202 April 2010 Unit 2 Cycle 15 Version 2 Core Operating Limits Report NL-10-0389, Cycle 15 Core Operating Limits Report2010-03-17017 March 2010 Cycle 15 Core Operating Limits Report NL-09-1588, Cycle 16 Core Operating Limits Report, Rev. 0, & Rev. 12009-10-26026 October 2009 Cycle 16 Core Operating Limits Report, Rev. 0, & Rev. 1 NL-08-1651, Supplement to Unit 2 Cycle 14 Core Operating Limits Report, Rev 02008-10-31031 October 2008 Supplement to Unit 2 Cycle 14 Core Operating Limits Report, Rev 0 NL-07-0744, Cycle 13 Core Operating Limits Report, Rev. 02007-04-11011 April 2007 Cycle 13 Core Operating Limits Report, Rev. 0 NL-07-0012, Revision 1 of Unit 1 Cycle 14 Core Operating Limits Report2007-01-30030 January 2007 Revision 1 of Unit 1 Cycle 14 Core Operating Limits Report NL-06-2319, Cycle 14 and Unit 2 Cycle 12 - Core Operating Limits Reports2006-10-20020 October 2006 Cycle 14 and Unit 2 Cycle 12 - Core Operating Limits Reports NL-06-1092, Cycle 13 Core Operating Limits Report2006-05-31031 May 2006 Cycle 13 Core Operating Limits Report NL-06-0151, Cycle 13 Core Operating Limits Report2006-01-31031 January 2006 Cycle 13 Core Operating Limits Report NL-05-2061, Revision 1 of Unit 1 Cycle 13 Core Operating Limits Report2005-11-18018 November 2005 Revision 1 of Unit 1 Cycle 13 Core Operating Limits Report NL-05-1739, Cycle 12 Core Operating Limits Report2005-09-30030 September 2005 Cycle 12 Core Operating Limits Report NL-05-0533, Cycle 13 Core Operating Limits Report2005-03-21021 March 2005 Cycle 13 Core Operating Limits Report NL-04-0623, Cycle 11 Core Operating Limits Report2004-04-28028 April 2004 Cycle 11 Core Operating Limits Report NL-03-1078, Cycle 11 Core Operating Limits Report2003-05-13013 May 2003 Cycle 11 Core Operating Limits Report ML0230202852002-10-16016 October 2002 Cycle 10 Core Operating Limits Report ML0209301632002-03-28028 March 2002 Cycle 11 Core Operating Limits Report 2024-09-25
[Table view] Category:Letter type:NL
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0128, License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency2024-04-0404 April 2024 License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0098, Report on Status of Decommissioning Funding2024-03-28028 March 2024 Report on Status of Decommissioning Funding NL-24-0112, Request for Revision to NRC Staff Assessment of Vogtle Site Updated Seismic Hazards2024-03-28028 March 2024 Request for Revision to NRC Staff Assessment of Vogtle Site Updated Seismic Hazards NL-24-0097, Exemption Request: Final Safety Analysis Report Update Schedule2024-03-22022 March 2024 Exemption Request: Final Safety Analysis Report Update Schedule NL-22-0267, License Amendment Request to Revise Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, AC Sources – Operating, Surveillance Requirements2024-03-20020 March 2024 License Amendment Request to Revise Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, AC Sources – Operating, Surveillance Requirements NL-24-0060, Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03)2024-02-15015 February 2024 Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03) NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0045, Supplement to Response to Requests for Additional Information for Proposed Alternative ALT-VR-022024-02-0808 February 2024 Supplement to Response to Requests for Additional Information for Proposed Alternative ALT-VR-02 NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0038, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2024-02-0202 February 2024 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-24-0031, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R23 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0742, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications2023-09-20020 September 2023 To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002S2) NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0672, Licensee Guarantees of Payment of Deferred Premiums2023-08-10010 August 2023 Licensee Guarantees of Payment of Deferred Premiums NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 2024-09-09
[Table view] |
Text
"*' Southern Nuclear J. J. Hutto Regulatory AHairs Director 40 lm cm~s~ Center Parkway Post Office Box 1295 Btmungham. AI 3'\242 205 992 5872 tel 205 992 760 I fa~
NOV 0 2 2017 jjhutto@southcmco.corn Docket No.: 50-425 NL-17-1757 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant- Unit 2 Core Operating Limits Report. Cycle 20, Version 1 Ladies and Gentlemen:
fn accordance with Technical Specification (TS) 5.6.5.d for Vogtle Electric Generating Plant (VEGP), Southern Nuclear Operating Company (SNC) submits the VEGP Core Operating Limits Report (COLA) for Unit 2, Cycle 20, Version 1.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at 205.992.7369.
Respectfully submitted, J. J. Hutto Regulatory Affairs Director jjh/kgl/cg
Enclosure:
VEGP Unit 2 COLA, Cycle 20, Version 1 Cc: Regional Administrator NRR Project Manager- Vogtle 1 & 2 Senior Resident Inspector- Vogtle 1 & 2 RType: CVC7000
ENCLOSURE to NL-17-1757 Vogtle Electric Generating Plant- Unit 2 Core Operating Limits Report. Cycle 20, Version 1 Vogtle Electric Generating Plant (VEGP) Unit 2 Cycle 20 Core Operating Limits Report Version 1
V<XiTLE ELECTRIC GENERATING PLANT (VEGP) UNIT 2 CYCLE 20 CORE OPERATING LIMITS REPORT (COLR)
Version I June 2017
CORE OPERATING LIMITS REPORT. VEGP UNJT 2 CYCLE 20 JUNE2017 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for VEGP Unit 2 Cycle 20 has been prepared in accordance with the requirements ofTechnical Specification 5.6.5.
The Technical Requirement affected by this report is listed below:
13.1.1 SHUTDOWN MARGIN- MODES 1 and 2 The Technical Specifications affected by this report are listed below:
3.1.1 SHUTDOWN MARGIN- MODES 3, 4 and 5 3.1.3 Moderator Temperature Coefficient 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor - Fo(Z) 3.2.2 Nuclear Enthalpy Rise Hot Channnel Factor- FNAH 3.2.3 Axial Flux Difference 3.9.1 Boron Concentration Page 1 of13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using NRC-approved methodologies including those specified in Technical Specification 5.6.5.
2.1 SHUTDOWN MARGIN - MODES I and 2 (Technical Requirement 13. 1.1) 2.1.1 The SHUTDOWN MARGIN shall be greater than or equal to 1.30 percent~
22 SHUTDOWN MARGIN - MODES 3, 4 and 5 (Specification 3.1.1) 2.2.1 The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figures I and 2.
Page 2 of13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 2.3 Moderator Temperature Coefficient (Specification 3.1.3) 2.3.1 The Moderator Temperature Coefficient (MTC) limits are:
The BOUAROIHZP-MTC shall be less positive than +0. 7 x I o-t L\k/k/°F for power levels up to 700/o RTP with a linear ramp to 0 L\k/k/°F at 100% RTP.
4 The EOL/AROIRTP-MTC shall be less negative than -5.50 x 10 AlclkflF. 1 2.3.2 The MTC Surveillance limits are:
The 300 ppm/ARO/RTP-MTC should be less negative than or equal to
-4.75 X 104 Aklk/°F. 1 The revised predicted near-EOL 300 ppm MTC shall be calculated using Figure 6 and the following algorithm:
Revised Predicted MTC = Predicted MTC* + AFD Correction** + Predictive Correction***
where,
- Predicted MTC is calculated from Figure 6 at the bumup corresponding to the measurement of300 ppm at RTP conditions,
- AFD Correction is the more negative value of:
{0 pcrni°F or (MFD
where: t..AFD is the measured AFD minus the predicted AFD from an incore flux map taken at or near the bumup corresponding to 300 ppm, AFD Sensitivity = 0.08 pcrnloF I t.AFD
- Predictive Correction is -3 pcm/°F.
The 60 ppm/ARO/RTP-MTC should be less negative than -5.35 x 104 t..klk/°F. 1 where: BOL stands for Beginning of Cycle Life ARO stands for All Rods Out HZP stands for Hot Zero THERMAL POWER EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER I Applicable for full-power T-average of 583.8 to 586.8 °F.
Page3 of13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 2.4 Shutdown Bank Insertion Limits (Specification 3.1.5) 2.4. I The shutdown banks shaiJ be withdrawn to a position greater than or equal to 225 steps.
2.5 Control Bank Insertion Limits (Specification 3. I .6) 2.5. I The control rod banks shaiJ be limited in physical insertion as shown in Figure 3.
2.6 Heat Flux Hot Channel Factor - FQ(Z) (Specification 3.2. I)
FR17' 2.6. I F0 ( Z) ~ ___2___
- p FRJP F0 (Z) ~ ___2___
- 0.5 THERMAL POWER where: P=--------------------
RATEDTHERMAL POWER 2.6.2 2.6.3 K(Z) is provided in Figure 4.
F 1111'
- K(Z) 2.6.4 F (Z) < Q for P > 0.5 Q - P*W(Z)
F 1171'. K(Z)
F (Z) < Q for P ~ 0.5 Q - 0.5 *W(Z) 2.6.5 W(Z) values are provided in Table 2.
2.6.6 The FQ(Z) penalty factors are provided in Table 1.
Page 4 of13
CORE OPERATlNG LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 2.7 Nuclear EnthaJpy Rise Hot Channel Factor- FN~"(Specification 3.2.2) 2.7.1 F:ft 5,F:Jr *(l+PF.v~ *(1-P))
THERMAL POWER where: P=----------
RATED THERMAL POWER 2.7.2 F:J~' = 1.65 2.7.3 PFMl = 0.3 2.8 Axial Flux Difference (Specification 3.2.3) 2.8.1 The Axial Flux Difference,(AFD) Acceptable Operation Limits are provided in Figure 5. .
2.9 Boron Concentration (Specification 3.9.1) 2.9.1 The boron concentration shall be greater than or equal to 2000 ppm. 2 2
This concentration bounds the condition ofk.,ff::; 0.95 (all rods in less the most reactive rod) and subcriticality (all rods out) over the entire cycle. This concentration includes additional boron to 10 address uncertainties and B depletion.
Page 5 of13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 Tablet FQ(Z) PENALTY FACTOR Bumup Penalty (MWDIMil.J) Factor 0 1.0276 150 1.0276 368 1.0370 585 1.0483 803 1.0536 1021 1.0548 1238 1.0501 1456 1.0415 1674 1.0322 1891 1.0233 2109 1.0200 Notes:
- 1. The Penalty Factor, to be applied to Fo(Z) in accordance with SR 3.2.1.2, is the maximum factor by which Fo(Z) is expected to increase over a 39 EFPD interval (surveillance interval of 31 EFPD plus the maximum allowable extension not to exceed 25% of the surveillance interval per SR 3.0.2) starting from the bumup at which the Fo(Z) was determined.
- 2. Linear interpolation is adequate for intermediate cycle bumups.
- 3. For all cycle bumups outside the range of the table, a penalty factor of 1.020 shall be used.
Page 6 of13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 Table2 RAOCW(Z)
Adal Eln'atioD ISO 4000 8000 12000 16000 20000 Poiot (feet) MWD~rru MWD~ITU MWD~ITU 1\IWD~ITU MWD~ITU 1\1\\'00ITU 1-5 12.072 - 11.267 UJOOO 1.0000 1.0000 1.0000 1.0000 1.0000 6 11.066 1.3235 1.4111 12431 1.2572 1.1130 1.2139 7 10.865 1.30S4 1.3879 1.2425 usn 1.2111 1.2250 8 10.664 1.3027 1.3653 1.1270 1.2482 1.2029 1.2100 9 10.462 1.3085 1.3551 12184 1.2353 1.1888 1.1907 10 18.261 1.1929 1.3343 1.2165 12244 un3 I 1804 II 10.060 12428 1.29-tl 1.2142 1.2118 U814 11824 12 9.859 1.2421 1.2706 1.2103 1.1966 1.1859 1.1850 13 9.658 12685 1.2644 1.2075 usn 1.1830 1.1886 14 9.456 12610 '-2404 1.2022 11860 1.1835 Ll919 IS 9.255 1.2417 1.2413 Ll954 Ll843 1.1890 1. 1935 16 9.054 1.2307 1.2411 1.1897 1.1811 1.1912 11974 17 &.853 12286 1.2361 1.1820 1.1763 11896 1.2084 18 8.652 12230 1.2314 Ll805 uno 1.1012 1.2234 19 8.450 1.1212 1.2229 1.1874 Ll803 12131 1.2333 20 8.249 12213 12150 1.1910 I 1820 12248 1.1460 21 8.048 12246 1.2086 1.1925 1.1875 1.1343 1.2580 22 7.847 1.2269 1.2022 1.1923 I 1945 1.2416 12686 23 7.646 12256 I 1996 11900 1.1986 1.1466 1.2811 24 7.444 12214 1.1943 1.1865 1.1013 11503 12907 25 7.243 12163 1.1859 1.1800 1.2004 1.2497 1.1950 26 7.042 1.2083 1.1757 11719 I 1972 1.2463 1.2952 27 6.841 1. 1989 Ll644 1.1628 1.1927 1.2415 1.2933 28 6.640 1.1875 I 1515 I 1547 1.1864 12353 12887 29 6.438 1.1751 1.1387 1.1469 1.1787 1.2297 1.2813 30 6.237 1.1629 1.1344 I 1394 1.1708 1.2230 12710 31 6.036 1.1523 1.1302 1.1311 I 1623 1.2153 1.2587 32 5.835 1.1441 I 1251 I 1247 1.1531 12063 1.2472 33 5.634 1.1357 1.1198 1.1211 1.1538 I 1992 12391 34 5.432 1.1321 I 1189 I 1206 1.1602 11998 1.2338 35 5.231 1.1334 1.1255 1.1311 1.1665 1.2050 1.2336 36 5.030 I 1388 1.1340 1.1399 1.1710 1.2098 12332 37 4.829 1.1431 1.1419 I 1485 1.1780 1.2131 1.2327 38 4.628 1.1478 1.1494 1.1566 1.1836 1.2148 1.2313 39 4.426 1.1528 1.1563 I 1640 I 1880 L2149 1.2278 40 4.225 I 1567 1.1624 1.1706 I 1912 1.2135 1.2228 41 4.024 1.1598 I 1678 1.1766 1.1934 1.2108 12177 42 3.823 1.1620 1.1725 I 1815 I 1945 1.2059 1.2107 43 3.622 1.1648 1.1763 I 1854 1.1949 1.1991 I 2011 44 3.420 I 1698 I 1797 1.1885 1.1949 I 1914 1.1911 45 3.219 I 1747 1.1810 1.1916 1.1936 I 1854 1.1794 46 3.018 I 1784 I 1943 1.2027 I 1959 1.1834 I 1780 47 2.817 1.1843 I 2175 1.2222 1.2086 1.1862 1.1869 48 2.616 1.1972 1.2415 1.2429 1.2237 1.1962 1.1992 49 2.414 1.2115 I 2655 I 2634 1.2381 I 2076 1.2112 so 2.213 I 2257 I 2900 I 2843 1.2527 1.2187 I 2233 51 2.012 1.2406 I 3143 13045 1.2661 1.2284 1.2336 52 1.811 1.2556 13382 I 3243 1.2789 1.2376 I 2*133 53 1.610 12700 1.3610 I 3432 12915 1.2472 1.2537 54 1.408 1.2840 1.3824 I 3611 1.3036 1.2570 1.2645 55 1.207 1.2975 14023 1.3777 1.3151 I 2666 I 2755 56 1.006 I 3102 14204 1.3929 1.3260 1.2763 1.2868 57-61 0.805 - 0.000 1.0000 I 0000 1.0000 1.0000 1.0000 1.0000 Top and BottomS Points Excluded per Technical Specification 83.2.1.
These W(Z) values are consistent with Figure 5, and are valid over the HFP Tavg temperature range from 583.8 to 586.8°F.
Page 7 of13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 FIGUREl REQUIRED SHUTDOWN MARGIN FOR MODES 3 AND 4 (FOUR LOOPS FD.LED AND VENTED AND AT LEAST ONE REACTOR COOLANT PUMP RUNNING) 5.0 4.0 ACCEPTABLE OPERATING REGION I
(2 00, .1 D)
/
/
/
/
REQUIRED SHUTDOWN MARGIN!
.,... v /
(1 00, .2 5)
/
v/
/
/
v /
.//
!UNACCEPTABLE OPERATING REGION I
( ~sc , .:i 0) 1.0 0.0 0 500 1000 1 500 2000 2500 RCS BORON CONCENTRATION (ppm)
Page 8 of13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 FIGURE2 REQUIRED SHUTDOWN MARGIN FOR MODES 4 AND 5 (MODE 4 WHEN FIGURE 1 NOT APPLICABLE) 5.0 (2 00 ~ . .9
~
l/
v v
~
l/
vv
/
4.0 7
!ACCEPTABLE OPERATING REGIONl vv /
~
........ /
v
~ /
<l 3.0 df' IREQUIRED SHUTDOWN MARGIN~ (1 50, .a ~)
- z; v
H CJ
~
v
~
§ 0 2.0 v
v t:l
~
1:1:
v til I
/ UNACCEPTABLE OPERATING REGION 1.0
(!16(, . ( 0) 0.0 0 500 1000 1500 2000 2500 RCS BORON CONCENTRATION (ppm)
Page 9 of13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 FIGUREJ ROD BANK INSERTION LIMITS VERSUS% OF RATED THERMAL POWER (Fully Withdrawn *)
220 I v ( .0, 22 1) I ,/ l118 . ~~ ~ SIJ
,/
v v
200
/ BANK B
/
1/ /
ll' 1/
v v v (J% 6 1. '/ L( I(% .6 l.
'/
v m
Ill
!l 140 til BANK C
/ I/
~ 120 ,/ v v
H E-t ,/
H v v v v til
- i! 100
~
lQ RO Q
0 ./
P'. / BANK D Ll /
60 v Ll k"' v v /
40
[(J% .IJ 6[)
v v
20 u
0 10 20 30 40 50 60 70 80 90 1 0 POWER (% of Rated Thermal Power)
- Fully withdrawn shall be the condition where control rods are at a position within the interval ::2: 225 and :s; 231 steps withdrawn.
NOTE: The Rod Bank Insertion Limits are based on the control bank withdrawal sequence A, B, C, D and a control bank tip-to-tip distance of 115 steps.
Page 10 of13
CORE OPERATING LIMITS REPORT, VEGP UNIT 2 CYCLE 20 JUNE2017 FIGURE4 K(Z)- NORMALIZED FQ(Z) AS A FUNCTION OF CORE HEIGHT 1.4 1.2 FQ = 2.50 CORE HT. K(Z) 0.00 1.00 6.00 1. 00 12.0 .925 N
Ill:
0.4 0.2 0.0 0 2 4 6 8 10 12 CORE HEIGHT {feet)
Page 11 of 13
CORE OPERATING LIMITS REPORT. VEGP UNIT 2 CYCLE 20 JUNE2017 FIGURES AXIAL FLUX DIFFERENCE LIMITS AS A FUNCfiON OF% RATED mERMAL POWER FORRAOC 120 110
(-15, 100) (+10, 100) 100 I 1\
~
CD 90 u ~AC EP~ ABIE I \ UN cc PTJl BLE
)
0 Po I \
I \
e r-1 as 80 I \
CD
..c:=
E-1 70 I L A""CE PTAl LE
\
'1:1 li I \
CD
.1.)
liS 60 I \
PI
""'0 I dP 50 1\
PI l ( -30, 50) I (+26, 50) I
~ 40 0
p.
30 20 10 0
-50 -40 -30 -20 -10 0 10 20 30 40 50 AXIAL FLUX DIFFERENCE (percent ~I)
Page 12 of13
CORE OPERATING LIMITS REPORT, VEGP UNIT 2 CYCLE 20 JUNE2017 FIGURE6 PREDICTED HFP 300 PPM MTC VS CYCLE BURNUP
-27 . 5 I I I I I i ' .....
~
Gl
-28.0
,...... !'oo..
........,I I 0 ~
"l
""'""'Gl I I ........
0 u
Gl - 28 . 5 I I 1-1 i"'-...
.flIll ......
1-1 Gl """"" ......
ftGJ """""
E-t -29 . 0 I 1-1 0
.jJ Ill 1-1
~ -29 . 5 17000 18000 19000 20000 21000 Cycle Burnup (MWD/MTU)
Cycle Burnup Modemtor Tempemture Coefficient (MWD/MTU) (pcm/0 f) 17000 -27.76 18000 -28.02 19000 -28.33 20000 -28.58 21000 -28.84 Page 13 of13