MONTHYEARNL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0828, Main Steam Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpolnt Drift2023-11-30030 November 2023 Main Steam Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpolnt Drift NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-22-0799, License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52022-12-20020 December 2022 License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-22-0897, Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A,2022-12-0909 December 2022 Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value NL-21-0989, License Amendment Request to Relocate Augmented Piping Inspection Program Details2021-12-22022 December 2021 License Amendment Request to Relocate Augmented Piping Inspection Program Details NL-21-0925, Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2021-12-22022 December 2021 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-21-1017, License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure2021-12-13013 December 2021 License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure NL-21-0930, Joseph F. Farley Nuclear Plant, Units 1 & 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-10-21021 October 2021 Joseph F. Farley Nuclear Plant, Units 1 & 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements NL-21-0658, Joseph Farley, Units 1 and 2, Vogtle, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for for Steam Generator Tube Inspections2021-09-17017 September 2021 Joseph Farley, Units 1 and 2, Vogtle, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for for Steam Generator Tube Inspections NL-21-0613, Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, .2021-06-30030 June 2021 Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, . NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications2021-06-22022 June 2021 License Amendment Request to Remove Table of Contents from Technical Specifications NL-21-0042, Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System2021-06-0909 June 2021 Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System NL-21-0065, License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls2021-03-25025 March 2021 License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls NL-20-0949, License Amendment Request to Revise, Technical Specifications to Adopt TSTF-541, Revision 22020-10-30030 October 2020 License Amendment Request to Revise, Technical Specifications to Adopt TSTF-541, Revision 2 ML20224A4642020-08-11011 August 2020 Southern Nuclear Operating Co, Inc - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML20192A1402020-06-30030 June 2020 Southern Nuclear Operating Co., Inc. - License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions NL-20-0275, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2020-05-29029 May 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues NL-19-0331, License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors2019-12-12012 December 2019 License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors NL-19-0963, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process2019-12-11011 December 2019 Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process NL-19-1063, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition2019-12-10010 December 2019 Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition NL-19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-07-15015 July 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NL-19-0771, Risk Informed Technical Specification Information Only Bases Changes2019-06-27027 June 2019 Risk Informed Technical Specification Information Only Bases Changes NL-18-0668, Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2018-12-14014 December 2018 Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material NL-18-1189, Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations- TSTF-51 and TSTF-4712018-11-29029 November 2018 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations- TSTF-51 and TSTF-471 ML18226A0942018-08-0909 August 2018 Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables NL-18-0039, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ...2018-07-27027 July 2018 License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ... NL-18-0733, Supplement to License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow and Response to Request for Additional Information2018-06-0707 June 2018 Supplement to License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow and Response to Request for Additional Information ML18065A0222018-03-0606 March 2018 March 12, 2018, Public Meeting - Draft 4b Application ML18065A0252018-03-0606 March 2018 Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures NL-17-0190, Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process2017-12-21021 December 2017 Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process NL-17-0611, Units 1 and 2, License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow2017-12-21021 December 2017 Units 1 and 2, License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow NL-17-1088, Submittal of License Amendment Request, Relocation of the Emergency Operations Facility2017-08-30030 August 2017 Submittal of License Amendment Request, Relocation of the Emergency Operations Facility NL-16-2384, Non-Voluntary License Amendment Request to Correct Non-Conservative Technical Specification 3.7.12017-03-22022 March 2017 Non-Voluntary License Amendment Request to Correct Non-Conservative Technical Specification 3.7.1 ML15329A0322017-01-23023 January 2017 Issuance of Amendment Related to Renewed Facility Operating License Condition 2.C.(23) Required Completion Date ML16340A0052016-12-0101 December 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Rev 4, Clarify Use and Application Rules. NL-16-1026, Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2016-11-21021 November 2016 Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements 2024-09-04
[Table view] |
Text
~ Southern Nuclear J. J. Hutto Regulatory Affairs Director 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 205 992 5872 tel 205 992 7601 fax jjhutto@ southernco.com December 21, 2017 NL-17-0190 Docket Nos.: 50-348 50-364 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 and 2 Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable using the Consolidate Line Item Improvement Process Ladies and Gentlemen:
In accordance with the provisions of 10 CFR 50.90 of Title 10 of the Code of Federal Regulations (1 0 CFR), Southern Nuclear Operating Company (SNC) is submitting a request for an amendment to the technical specifications (TS) for Joseph M. Farley Nuclear Plant (FNP)
Units 1 and 2.
The proposed amendment establishes Conditions, Required Actions, and Completion Times in the TS for the Condition where one steam supply to the turbine driven Auxiliary Feedwater (AFW) pump is inoperable concurrent with an inoperable motor driven AFW train. In addition, this amendment establishes changes to the TS, that establish specific Actions: (1) for when two motor driven AFW trains are inoperable at the same time and; (2) for when the turbine driven AFW train is inoperable either (a) due solely to one inoperable steam supply, or (b) due to reasons other than one inoperable steam supply. The change is consistent with NRC-approved Technical Specification Task Force (TSTF) Traveler, TSTF-412, Revision 3, "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable." The availability of this technical specification improvement was announced in the Federal Register on July 17, 2007 as part of the consolidated line item improvement process (CLIIP). provides a description of the proposed changes and confirmation of applicability. provides the existing TS pages marked-up to show the proposed changes. provides the clean typed TS pages to show the proposed changes. provides the existing TS Bases pages marked-up to reflect the proposed changes (information only).
U.S. Nuclear Regulatory Commission NL-17-0190 Page 2 SNC requests approval of the proposed license amendments by December 21, 2018. The proposed changes will be implemented within 90 days of issuance of the amendment.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at 205.992.7369.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 21 51 day of December 2017.
Respectfully submitted,
--99c:?
J. J. Hutto Regulatory Affairs Director JJH/GKM/KGL
Enclosure:
- 1. Description and Assessment
- 2. FNP Technical Specification Marked Up Pages
- 3. FNP Technical Specification Clean Typed Pages
- 4. FNP Technical Specification Bases Marked Up Pages (for information only) cc: Regional Administrator, Region II NRR Project Manager- Farley Senior Resident Inspector- Farley Director. Alabama Office of Radiation Control RType: CFA04.054
Joseph M. Farley Nuclear Plant, Units 1 and 2 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable using the Consolidate Line Item Improvement Process Enclosure 1 Description and Assessment
Enclosure to NL-17-0190 Description and Assessment Description and Assessment
1.0 DESCRIPTION
The proposed license amendment establishes a new Completion Time for technical specifications section 3.7.5 where one steam supply to the turbine driven AFW pump is inoperable concurrent with an inoperable motor driven AFW train. This amendment also establishes specific Conditions and Action requirements: (1) for when two motor driven AFW trains are inoperable at the same time and; (2) for when the turbine driven AFW train is inoperable either (a) due solely to one inoperable steam supply, or (b) due to reasons other than one inoperable steam supply.
The changes are consistent with NRC approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-412, Revision 3, "Provide Actions for One Steam Supply to Turbine Driven AFW Pump Inoperable." The availability of this technical specification improvement was announced in the Federal Register on July 17, 2007 (72 FR 39089) as part of the consolidated line item improvement process (CLIIP).
2.0 ASSESSMENT 2.1 Applicability of Published Safety Evaluation Southern Nuclear Operating Company (SNC) has reviewed the safety evaluation published on July 17, 2007 (72 FR 39089) as part of the CLIIP. This verification included a review of the NRC staff's evaluation as well as the supporting information provided to support TSTF-412, Revision 3. SNC has concluded that the justifications presented in the TSTF proposal and the safety evaluation prepared by the NRC staff are applicable to Joseph M. Farley Nuclear Plant (FNP), Units 1 and 2 and justify this amendment for the incorporation of the changes to the FNP Technical Specifications.
2.2 Optional Changes and Variations SNC is not proposing any variations or deviations from the technical specification changes described in TSTF-412, Revision 3, or the NRC staff's model safety evaluation published in the Federal Register on July 17, 2007 (72 FR 39089).
3.0 REGULATORY ANALYSIS
A description of the proposed change and its relationship to applicable regulatory requirements and guidance was provided in the Notice of Availability published on July 17, 2007 (72 FR 39089).
3.1 No Significant Hazards Determination SNC has reviewed the proposed no significant hazards consideration determination published on July 17, 2007 as part of the CLIIP. SNC has concluded that the proposed determination presented in the notice is applicable to FNP and the determination is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91 (a).
E-1
Enclosure to NL-17-0190 Description and Assessment 3.2 Verification and Commitments There are no new regulatory commitments associated with this proposed change.
4.0 ENVIRONMENTAL EVALUATION SNC has reviewed the environmental evaluation included in the model safety evaluation published in the Federal Register on July 17, 2007 (72 FR 39089) as part of the CLIIP. SNC has concluded that the NRC staff's findings presented in that evaluation are applicable to FNP and the evaluation is hereby incorporated by reference for this application.
Joseph M. Farley Nuclear Plant, Units 1 and 2 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable using the Consolidate Line Item Improvement Process Enclosure 2 FNP Technical Specification Marked Up Pages
AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
NOTE-------------------------------------------------------
LCO 3.0.4b is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. Turbine driven AFW train A.1 Restore affected equipment 7 days inogerable due to one to OPERABLE status.
inogerable steam suggi~Gne steaFR Sl:lf:lf:lly te t~;;~Feine 9Fiven At;;W J:ll:lffiJ:l ineJ:lOFaele.
OR
NOTE-----------
Only applicable if MODE 2 has not been entered following refueling.
One turbine driven AFW pump inoperable in MODE 3 following refueling.
B. One AFW train B.1 Restore AFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons OPERABLE status.
other than Condition A.
ACTIONS (continued)
Farley Units 1 and 2 3.7.5-1 Amendment No. a.G3 (Unit 1)
Amendment No. -+99 (Unit 2)
AFW System 3.7.5 CONDITION REQUIRED ACTION COMPLETION TIME
- c. Turbine driven AFW train C.1 Restore the steam SU[2[2Iy to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ino12erable due to one the turbine driven train to ino12erable steam SU[2[2Iy. OPERABLE status.
AND OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C.2 Restore the motor driven One motor driven AFW AFW train to OPERABLE train ino12erable.
status.
DG. Required Action and DG.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time offe!: Condition A,_ AND
.!2,. or CB not met.
DG.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR Two AFW trains inoperable for reasons other than Condition C.
~G. Three AFW trains ~G.1 --------------NOTE---------------
inoperable. LCO 3.0.3 and all other LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.
Initiate action to restore Immediately one AFW train to OPERABLE status.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 -------------------------------NOTE-------------------------------
AFW train(s) may be considered OPERABLE during ali nment and o eration for steam enerator level Farley Units 1 and 2 3.7.5-2 Amendment No. ~ (Unit 1)
Amendment No . ..:t-99 (Unit 2)
Joseph M. Farley Nuclear Plant, Units 1 and 2 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable using the Consolidate Line Item Improvement Process Enclosure 3 FNP Technical Specification Clean Typed Pages
AFWSystem 3.7.5
- 3. 7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3. 7.5 Three AFW trains shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
N0 TE-------------------------------------------------------
LCO 3.0.4b is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. Turbine driven AFW train A.1 Restore affected equipment 7 days inoperable due to one to OPERABLE status.
inoperable steam supply.
OR
NOTE-----------
Only applicable if MODE 2 has not been entered following refueling .
One turbine driven AFW pump inoperable in MODE 3 following refueling.
B. One AFW train B.1 Restore AFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons OPERABLE status.
other than Condition A.
Farley Units 1 and 2 3.7.5-1 Amendment No. (Unit 1)
Amendment No. (Unit 2)
AFWSystem 3.7.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Turbine driven AFW train C.1 Restore the steam supply to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable due to one the turbine driven train to inoperable steam supply. OPERABLE status.
AND OR One motor driven AFW C.2 Restore the motor driven 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> train inoperable. AFW train to OPERABLE status.
D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, B, or AND C not met.
D.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR Two AFW trains inoperable for reasons other than Condition C.
E. Three AFW trains E.1 --------------NOTE---------------
inoperable. LCO 3.0.3 and all other LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.
Initiate action to restore Immediately one AFW train to OPERABLE status.
Farley Units 1 and 2 3.7.5-2 Amendment No. (Unit 1)
Amendment No. (Unit 2)
AFWSystem 3.7.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 -------------------------------N0 TE -------------------------------
AFW train(s) may be considered OPERABLE during alignment and operation for steam generator level control, if it is capable of being manually realigned to the AFW mode of operation.
Verify each AFW manual, power operated, and In accordance automatic valve in each water flow path, and in both with the steam supply flow paths to the steam turbine driven Surveillance pump, that is not locked, sealed, or otherwise Frequency secured in position, is in the correct position. Control Program SR 3.7.5.2 -----------------------------N0 T E---------------------------------
Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after~ 1005 psig in the steam generator.
Verify the developed head of each AFW pump at the In accordance flow test point is greater than or equal to the required with the lnservice developed head. Testing Program.
SR 3.7.5.3 -----------------------------N0 T E--------------------------------- In accordance AFW train(s) may be considered OPERABLE during with the alignment and operation for steam generator level Surveillance control, if it is capable of being manually realigned to Frequency the AFW mode of operation. Control Program Verify each AFW automatic valve that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
Farley Units 1 and 2 3.7.5-3 Amendment No. (Unit 1)
Amendment No. (Unit 2)
AFWSystem 3.7.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.4 ----------------------------NOTES---------------------------------
- 1. Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after ~ 1005 psig in the steam generator.
- 2. AFW train(s) may be considered OPERABLE In accordance during alignment and operation for steam with the generator level control, if it is capable of being Surveillance manually realigned to the AFW mode of Frequency operation. Control Program Verify each AFW pump starts automatically on an actual or simulated actuation signal.
SR 3.7.5.5 Verify the turbine driven AFW pump steam admission In accordance valves open when air is supplied from their respective with the air accumulators. Surveillance Frequency Control Program Farley Units 1 and 2 3.7.5-4 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Joseph M. Farley Nuclear Plant, Units 1 and 2 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable using the Consolidate Line Item Improvement Process Enclosure 4 FNP Technical Specification Bases Marked Up Pages (Information Only)
AFW System B 3.7.5 B 3. 7 PLANT SYSTEMS B 3. 7.5 Auxiliary Feedwater (AFW) System BASES BACKGROUND The AFW System automatically supplies feedwater to the steam generators to remove decay heat from the Reactor Coolant System upon the loss of normal feedwater supply. The turbine-driven and motor-driven AFW pumps take suction through separate and independent suction lines (one for the turbine-driven pump and one shared by both motor-driven pumps) from the condensate storage tank (CST) (LCO 3.7.6, "Condensate Storage Tank (CST)") and pump to the steam generator secondary side via separate and independent lines up to the common connection to the main feedwater (MFW) piping to each steam generator outside containment. The steam generators function as a heat sink for core decay heat. The heat load is dissipated by releasing steam to the atmosphere from the steam generators via the main steam safety valves (MSSVs) (LCO 3. 7 .1 ...
"Main Steam Safety Valves (MSSVs)") or atmospheric relief valves (ARVs) (LCO 3.7.4, "Atmospheric Relief Valves (ARVs)") . If the main condenser is available, steam may be released via the steam dump valves and recirculated to the CST.
The AFW System consists of two motor driven AFW pumps and one steam turbine driven pump configured into three trains. The pumps are equipped with recirculation lines to prevent pump operation against a closed system. Each motor driven AFW pump is powered from an independent Class 1E power supply and feeds all steam generators through a common header. The steam turbine driven AFW pump receives steam from two main steam lines upstream of the main steam isolation valves. Each of the steam feed lines will supply 100% of the requirements of the turbine driven AFW pump.
The turbine driven AFW pump supplies a common header capable of feeding all steam generators via DC solenoid air operated control valves actuated by the Engineered Safety Feature Actuation System (ESFAS). Thus, the requirement for diversity in motive power sources for the AFW System is met.
The AFW System is capable of supplying feedwater to the steam generators during normal unit startup, shutdown, and hot standby conditions.
One pump at full flow is sufficient to remove decay heat and cool the unit (normal cooldown) to residual heat removal (RHR) entry conditions.
(continued)
Farley Units 1 and 2 B 3.7.5-1 Revision G
AFW System B 3.7.5 BASES LCO generators are OPERABLE. This requires that the two motor-driven (continued) AFW pump trains be OPERABLE with one shared flow path, each supplying AFW to all steam generators. In addition, the turbine driven AFW pump train is required to be OPERABLE with redundant steam supplies from each of two main steam lines upstream of the MSIVs, and shall be capable of supplying AFW to any of the steam generators via its associated flow path. The control room manual actuation switches for each AFW pump shall also be OPERABLE.
The piping, valves, instrumentation, and controls in the required flow paths also are required to be OPERABLE. A flow path is operable when it is capable of supporting the required AFW flow.
APPLICABILITY In MODES 1, 2, and 3, the AFW System is required to be OPERABLE in the event that it is called upon to function when the MFW is lost. In addition, the AFW System is required to supply enough makeup water to replace the steam generator secondary inventory, lost as the unit cools to MODE 4 conditions.
In MODE 4 the AFW System may be used for heat removal via the steam generators. However, the OPERABILITY of the AFW system in MODE 4 is not assumed in the safety analysis and this LCO does not require the AFW system OPERABLE in MODE 4.
In MODE 5 or 6, the steam generators are not normally used for heat removal, and the AFW System is not required.
ACTIONS A Note prohibits the application of LCO 3.0.4b to an inoperable AFW train. There is an increased risk associated with entering a MODE or other specified condition in the Applicability with an AFW train inoperable and the provisions of LCO 3.0.4b, which allow entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, should not be applied in this circumstance.
If one of tho two steam supplies to the turbine driven AFW train is inoperable due to one inoperable steam supply, or if turbine driven pump is inoperable for any reason while in MODE 3 immediately following refueling, action must be taken to restore the inoperable equipment to an OPERABLE status within 7 days. The 7 day Completion Time is reasonable, based on the following reasons:
(continued)
Farley Units 1 and 2 B 3.7.5-5 Revision ++
AFW System B 3.7.5 BASES ACTIONS A.1 (continued)
- a. For the inoperability of a steam supply to the turbine driven AFW pump due to one inoperable steam supply, the 7 day Completion time is reasonable since there is a redundant steam supply line for the turbine driven pump and the turbine driven train is still capable of performing its specified function for most postulated events.
- b. For the inoperability of a turbine driven AFW pump while in MODE 3 immediately subsequent to a refueling, the 7 day Completion time is reasonable due to the minimal decay heat levels in this situation.
- c. For both the inoperability of a steam supply line to the turbine driven pump due to one inoperable steam supply and an inoperable turbine driven AFW pump while in MODE 3 immediately following a refueling, the 7 day Completion time is reasonable due to the availability of redundant OPERABLE motor driven AFW pumps; and due to the low probability of an event requiring the use of the turbine driven AFW pump.
Condition A is modified by a Note which limits the applicability of the Condition for an inoperable turbine driven AFW pump in MODE 3 to when the unit has not entered MODE 2 following a refueling.
Condition A allows one AFW train to be inoperable for 7 days vice the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time in Condition B. This longer Completion Time is based on the reduced decay heat following refueling and prior to the reactor being critical.
With one of the required AFW trains (pump or flow path) inoperable for reasons other than Condition A, action must be taken to restore OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. A flow path is inoperable if it is blocked such that the required AFW flow cannot be delivered. This Condition includes the loss of two steam supply lines to the turbine driven AFW pump. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable, based on the redundant capabilities afforded by the AFW System, the time needed for repairs, and the low probability of a DBA occurring during this time period.
Farley Units 1 and 2 B 3.7.5-6 Revision ++
AFW System B 3.7.5 BASES ACTIONS C.1 and C.2 (continued)
With one of the required motor driven AFW trains (pump or flow path) inoperable and the turbine driven AFW train inoperable due to one inoperable steam supply, action must be taken to restore the affected equipment to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Assuming no single active failures when in this condition. the accident (a FLB or MSLB) could result in the loss of the remaining steam supply to the turbine driven AFW pump due to the faulted SG. In this condition, the AFW system may no longer be able to meet the required flow to the SGs assumed in the safety analysis due to the analysis requiring flow from two AFW pumps.
The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is reasonable based on the remaining OPERABLE steam supply to the turbine driven AFW pump, the availability of the remaining OPERABLE motor driven AFW pump, and the low probability of an event occurring that would require the inoperable steam supply to be available for the turbine driven AFW pump D.1 and D.2 When Required Action A.1 ..-GF-_B.1 , C.1, or C.2 -cannot be completed within the required Completion Time, or if two AFW trains are inoperable for reasons other than Condition C, the unit must be placed in a MODE in which the LCO does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
In MODE 4, AFW is not required since the RHR system is available.
If all three AFW trains are inoperable, the unit is in a seriously degraded condition with no safety related means for conducting a cooldown, and only limited means for conducting a cooldown with nonsafety related equipment. In such a condition, the unit should not be perturbed by any action, including a power change, that might result in a trip. The seriousness of this condition requires that action be started immediately to restore one AFW train to OPERABLE status.
Farley Units 1 and 2 B3.7.5-7 Revision ~
AFW System 8 3.7.5 Required Action £G.1 is modified by a Note indicating that all required MODE changes or po*Nor reduotions are suspended until one AFW train is restored to OPERABLE status. In this case, LCO 3.0.3 is not applicable because it could force the unit into a less safe condition.
SURVEILLANCE SR 3.7.5.1 REQUIREMENTS Verifying the correct alignment for manual, power operated, and automatic valves in the AFW System water and steam supply flow paths provides assurance that the proper flow paths will exist for AFW operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since they are verified to be in the correct position prior to locking, sealing, or securing. This SR also does not apply to valves that cannot be inadvertent!~ misaligned, such as check valves. This Surveillance does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position.
(continued)
Farley Units 1 and 2 8 3.7.5-8 Revision ad