ML14246A523
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/29/2014
From: Pierce C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14246A545 List:
References
NL-14-1273
Download: ML14246A523 (132)


Text

Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7872 Attachments S and W contains information not for public disclosure. Withhold under 10 CFR 2.390.

Fa x 2 0 5.9 9 2.7 601/

AUG 2 9 2014 SOUTHERNA COMPANY Docket Nos.: 50-348 NL-14-1273 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generating Plants Ladies and Gentlemen:

By letter dated September 25, 2012, the Southern Nuclear Operating Company (SNC) submitted a license amendment request (LAR) for Joseph M. Farley Units 1 and 2 (Ref. TAC NOS. ME9741 and ME9742). The proposed amendment requests the review and approval for adoption of a new fire protection licensing basis which complies with the requirements in Sections 50.48(a) and 50.48(c) to Title 10 to the Code of Federal Regulations (10 CFR), and the guidance in Regulatory Guide (RG) 1.205, Revision 1, Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants.

By letter dated December 12, 2012, the Nuclear Regulatory Commission (NRC)

Staff requested supplemental information regarding the acceptance of the license amendment (Adams Accession No. ML12345A398). SNC provided the requested information by letter dated December 20, 2012. The NRC staff subsequently completed the acceptance review by letter dated January 24, 2013, (Adams Accession No. ML13022A158).

By letter dated July 8, 2013, the NRC Staff formally transmitted a request for additional information (RAI) related to the referenced license amendment. SNC's responses to these RAls are being provided by three submittals. By letter dated September 16, 2013, SNC provided the first set of responses. By letter dated October 30, 2013, SNC provided the second set of responses and by letter dated November 12, 2013, SNC provided the remaining set of responses.

By letter dated March 28, 2014, the NRC Staff formally transmitted the second round of requests for additional information related to the referenced license

U.S. Nuclear Regulatory Commission NL-14-1273 Page 2 amendment request. By letter dated April 23, 2014, SNC provided the 30 day response to the second round of RAIs. By letter dated May 23, 2014, SNC provided the 60 day response to six of the eight remaining RAIs.

By letter dated July 3, 2014, SNC provided revised Attachments S, V, and W.

The updated total plant, Fire PRA, and delta risk values were provided in the updated Attachments V and W. These attachments provided the response to PRA RAIs 06.a.01 and 35. The revised Attachment S reflected the updates associated with the RAI responses. Revisions to Table C-2 in Attachment C and Attachment G were to be provided in a separate submittal. Along with other revisions, a new modification item was added to Attachment S for installation of the Generation III Westinghouse shutdown seals for the reactor coolant pumps on both Unit 1 and Unit 2.

By letter dated July 11, 2014, the NRC staff transmitted additional RAIs related to the credit for the next generation of the Westinghouse Reactor Coolant Pump shutdown seals (PRA RAI 35.01) and the composite analysis of the probabilistic risk assessment (PRA RAI 36). By letter dated August 11, 2014, SNC provided the response to PRA RAIs 16.a.02 and 35.01. During a teleconference held on August 1, 2014, it was agreed that the response to PRA RAI 36 would be provided by August 29, 2014.

The enclosure to this letter provides the response to PRA RAI 36. The response contains a summary of changes as requested in the August 1, 2014 teleconference. Revisions to Table C-2 in Attachment C, NFPA 805 Required Fire Protection Systems and Features, are provided as an attachment. Based on the nature of the changes involved with previous RAI responses, there have been no significant changes to the current VFDR dispositions as identified in Table C-1 found in Attachment C. Also, no VFDRs have been added or deleted. As a result, it is not necessary to revise Table C-1. It should be noted that the A CDF and A LERF numbers and "Required Fire Protection Systems and Features" tables in Table C-1 will change as a result of the PRA model changes. However, this information is included in other attachments which are being revised. Therefore, the C-1 table will not be revised at this time.

Also, reviews have determined that there are no revisions to Attachment G that are necessary to account for recovery actions that are required for risk or defense in depth. Revisions to Attachment S, Modifications and Implementation Items, Attachment V, Fire PRA Quality, and Attachment W, Fire PRA Insights, are also provided. These revisions reflect the updates associated with the RAI responses and add back 4 implementation items to Attachment S that were inadvertently omitted in a previous revision. Attachments S and W contain sensitive information and should be withheld from public disclosure under 10 CFR 2.390.

The No Significant Hazards Consideration determination provided in the original submittal is not altered by the RAI responses provided herein.

This letter contains no new NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

U.S. Nuclear Regulatory Commission NL-14-1273 Page 3 Mr. C. R. Pierce states he is Regulatory Affairs Director of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true and correct.

Respectfully submitted, C. R. Pierce Regulatory Affairs Director CRP/jkb/lac S, ¢to and subscribed before me this Q___

day of,,L

, 2014.

Notary Public My commissi on expires:

Zo : Response to Request for Additional Information Attachments: Table C-2 in Attachment C-Required Fire Protection Systems and Features Attachment S-Modifications and Implementation Items Attachment V-Fire PRA Quality Attachment W - Fire PRA Insights cc:

Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Ms. C. A. Gayheart, Vice President - Farley Mr. B. L. Ivey, Vice President - Regulatory Affairs Mr. T. E. Tynan, Vice President - Fleet Operations Mr. B. J. Adams, Vice President - Engineering Mr. D. R. Madison, Vice President - Vogtle Mr. R. R. Martin, Regulatory Manager - Farley RTYPE: CFA04.054 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. S. A. Williams, NRR Project Manager - Farley Mr. P. K. Niebaum, Senior Resident Inspector - Farley Mr. K. E. Miller, Resident Inspector - Farley Alabama Department of Public Health Dr. D. E. Williamson, State Health Officer

Joseph M. Farley Nuclear Plant Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c)

NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generating Plants Response to Request for Additional Information Response to Request for Additional Information Farley RAI PRA 36 By letter dated September 25, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12279A235), as supplemented by letter dated October 30, 2013 (ADAMS Accession No. ML13305A105),

Southern Nuclear Company (SNC) requested an amendment to the Technical Specifications for the Joseph M. Farley Nuclear Plant (Farley). Specifically, the requested change would allow the licensee to adopt National Fire Protection Association Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants."

Section 2.4.3.3 of NFPA 805 states that the Probabilistic Risk Assessment approach, methods, and data shall be acceptable to the NRC. Section 2.4.4.1 of NFPA-805 further states that the change in public health risk arising from transition from the current fire protection program to an NFPA-805 based program, and all future plant changes to the program, shall be acceptable to the NRC. RG 1.174 provides quantitative guidelines on core damage frequency, large early release frequency, and identifies acceptable changes to these frequencies that result from proposed changes to the plant's licensing basis and describes a general framework to determine the acceptability of risk-informed changes. The U.S. Nuclear Regulatory Commission (NRC) staff has identified additional information that is required to fully characterize the risk estimates.

Provide the results of a composite analysis that shows the integrated impact on the fire risk (core damage frequency (CDF), larger early release frequency (LERF), change in (A)CDF, ALERF) after replacing all the identified methods and weaknesses. As the review process is concluded, additional changes to replace any method or weakness still under review may be required. In this composite analysis, for those cases where the individual issues have a synergistic impact on the results, a simultaneous analysis must be performed, specifically for those items listed below.

For cases where no synergy exists, a one-at-a-time analysis may be done. If the impact on the change in risk from transition is negligible, a quantitative evaluation is unnecessary.

a.

The results from the analysis for PRA RAI 35.01 above.

b.

In the LAR submittal dated September 12, 2012, and the LAR supplement dated December 20, 2012, sensitivities related to the electrical cabinet fire severity method (Section V.2.1) and use of control power transformer (CPT) (Section V.2.3; also response to PRA RAI 08.a).

c.

In the letter dated September 16, 2013 (ADAMS Accession No. ML14038A019) containing the following RAI responses:

PRA RAI 01.a - Removal of credit for very early warning fire detection systems (VEWFDS) in the MCR (also PRA RAI 01.01),

PRA RAI 15.a - Revised seismic CDF based on 2008 United States Geological Survey (USGS) data, and E1-1 Response to Request for Additional Information PRA RAI 28.k - Validity of current ignition bin 15 fire frequencies.

d.

In the letter dated November 12, 2013 (ADAMS Accession No. ML13318A027) containing the following RAI responses:

PRA RAI 17.d - turbine building collapse, and PRA RAI 33.c - Revised main control room (MCR) abandonment analysis (also RAI PRA 33.c.01). (incorporates PRA RAI 07.e - Use of 0.1 CCDP for MCR abandonment)

e.

Fire Modeling (FM) RAI responses from letters dated September 16, 2013 (ADAMS Accession ML14038A017 and ML14038A019), October 30, 2013 (ADAMS Accession No. ML13305A105), November 12, 2013 (ADAMS Accession No. ML13318A027), and April 23, 2014 (ADAMS Accession No. ML14114A550):

FM RAI 01.b - Use of FAQ 08-0052 Recommended or Shorter Fire Growth Rates for MCR Abandonment Analysis, FM RAI 01.c - Use of Society of Fire Protection Engineers (SFPE)

Handbook Heats of Combustion for Teflon and Tefzel in MCR Abandonment Analysis, FM RAI 01.d - Update of MCR Abandonment Analysis for Wall and Corner Effects for Transient Fires, FM RAI 01.h - Development of new zone of influence (ZOI) Tables for Generic Fire Modeling Treatments, FM RAI 01.i-Use of New hot gas layer (HGL) Tables in Generic Fire Modeling Treatments Involving Secondary Combustibles, and FM RAI 08 - Assumption of Instantaneous Peak heat release rates (HRR) for Fires in Medium Voltage switchgear (SWGR) following a high energy arcing fault.

E1-2 Response to Request for Additional Information

RESPONSE

The response below addresses each of the items specified in the RAI with respect to the manner in which these issues are addressed in the Fire PRA Model used to provide the quantification results that accompany this RAI transmittal. The disposition of the issues specified below have been applied in the Fire PRA model and the change in risk calculations.

a) PRA RAI 35.01 - The responses to PRA RAI 35.01 (Adams Accession No. ML14223A646) justifies the credit for the SDS in the Farley model. Based on available supporting documentation for the new SDS by Westinghouse, the current credit is judged to be bounding. As identified, Implementation item 32 has been added to Attachment S, Table S-3 to address the specific model change once the new seals are installed.

b) From NFPA 805 LAR submittal, the December 20, 2012 LAR Supplement and subsequent RAI responses:

i) NFPA 805 LAR Submittal Section V.2.1 - The electrical cabinet fire severity method is no longer used in the Farley Fire PRA.

ii) NFPA 805 LAR Submittal Section V.2.3 and the response to RAI PRA 08(a) - The hot short-induced spurious operation conditional likelihood estimates used in the development of the Fire PRA has been updated to reflect the guidance provided in ML14086A165, "Supplemental Interim Technical Guidance on Fire-Induced Circuit Failure Mode Likelihood Analysis". This guidance has been incorporated into the base model. The original response to RAI PRA 08(a) (ADAMS Accession No. ML13318A027) indicated that this issue would be addressed via a sensitivity analysis. This response supersedes the previous response.

c) From RAI Responses dated September 16, 2013:

i)

PRA RAI 01.a - Credit for VEWFDS has been eliminated from the control room main control board area (fire zone 0401). (See PRA RAI 01.a (Adams Accession No. ML14038A019) and subsequent PRA RAI 01.01 response) (Adams Accession No. ML14147A368).

ii) PRA RAI 15.a - The updated seismic contribution to the total plant risk, as specified in PRA RAI 15.a, is being used. (ADAMS Accession No. ML14038A019) iii) PRA RAI 28.k - The number of vertical sections of 1 F Switchgear in Room 0335 was corrected to 15 from 16 and sensitivity analysis was performed for the discrepancy of total plant count of electrical cabinets. The sensitivity analysis provided in the RAI 28.k submittal (ADAMS Accession No. ML14038A019) demonstrated that the associated discrepancy had an insignificant impact on the Fire PRA.

Therefore, this change is not included in the updated fire PRA risk evaluation in support of the NFPA 805 LAR. This change will be incorporated in conjunction with other future changes as appropriate.

E1-3 Response to Request for Additional Information d) For RAI Responses dated November 12, 2013: (ADAMS Accession No. ML13318A027) i)

PRA RAI 17.d - The ignition frequency and suppression terms for the Turbine Building Collapse scenarios have been updated in accordance with the response to PRA RAI 17.d (ADAMS Accession No. ML14147A368).

ii) PRA RAI 33.c - See response to PRA RAI 33.c.01 (ADAMS Accession No. ML14147A368) for a discussion and clarification of the methodology used for the MCR Abandonment analysis.

e) For RAI responses dated September 16, 2013, October 30, 2013, November 12, 2013 and April 23, 2014:

i)

FM RAI 01.b - The updated baseline results reflect the response specified in FM RAI 01.b (ADAMS Accession No.ML14038A019).

ii) FM RAI 01.c - The updated baseline results reflect the response specified in FM RAI 01.c (ADAMS Accession No. ML14038A019).

iii) FM RAI 01.d - The updated baseline results reflect the response specified in FM RAI 01.d (ADAMS Accession No.ML14038A019). The response to FM RAI 01.d identified an implementation item to be included in Attachment S, Table S-3. This item addresses the amount of allowed combustible material to bring into the main control room.

Based on this response there is no model update required. An updated Attachment S is provided with this response to reference this new implementation item along with adding back other implementation items from previous RAIs (FM 01.d (ADAMS Accession No. ML13318A027), PROG 05 (ADAMS Accession No. M114038A019),

FPE 05 (ADAMS Accession No. ML14038A019) and FPE 09 (ADAMS Accession No. ML14038A019)).

iv) FM RAI 01.h - The updated baseline results reflect the response specified in FM RAI 01.h (ADAMS Accession No. ML13318A027).

v)

FM RAI 01.i - The updated baseline results reflect the response specified in FM RAI 01.i (ADAMS Accession No. ML13318A027).

vi) FM RAI 08 - The updated baseline results reflect the response specified in FM RAI 08 (ADAMS Accession No. ML14114A550).

The updated base risk results includes the composite effect from the RAI responses referenced above, with the exception of PRA 28.k above, which has been judged to have insignificant impact on the risk results and FM 01.d which includes a new implementation item to address the control of the amount of transient combustible materials in the main control room.

Updated total plant, Fire PRA, and delta risk values are included in the updated LAR Attachment W which is included as an attachment to the transmittal of this RAI. Due to the update of plant risk results, Attachment W is also provided to update the ignition frequency sensitivity originally provided. An updated Attachment S is also provided in response to PRA 36.e.iii. Revised NFPA 805 LAR, Table C-2 in Attachment C is provided to reflect changes resulting from E1l-4 Response to Request for Additional Information the update of the Fire PRA associated with the RAIs. Also, reviews have determined there are no revisions to Attachment G that are necessary to account for recovery actions that are required for risk or defense in depth. Based on the nature of the changes involved with previous RAI responses, there have been no changes to the current VFDR dispositions as identified in Table C-1 found in Attachment C. Also, no VFDRs have been added or deleted. As a result, it is not necessary to revise Table C-1.

After a review of Attachment W, Table W-6 and discussions with the NRC, further review of the total additional risk of Recovery Actions was required. The current additional risk of recovery actions was taking credit for the non VFDR risk reduction modifications. Elimination of this credit provides a clearer identification of the risk associated with the credited recovery actions. As such, this additional credit has been removed. When this is done, the additional risk of recovery action increases to 9.98E-06/3.49E-07 and 1.54E-05/6.56E-07 for Unit 1 CDF/LERF and Unit 2 CDF/LERF, respectively. This results in the Unit 2 CDF additional risk of recovery action being in Region I of RG 1.174 and the Unit 1 CDF additional risk of recovery action being right at the threshold of going into Region I. Based on these results, the additional risk of recovery action was revisited to address this concern.

The potential risk of each recovery action is currently bounded by the total delta risk of the Fire Area including all VFDRs. To reduce the conservatism associated with this approach, the additional risk of recovery actions was calculated independently rather than using the bounding value.

To calculate the risk of recovery actions per scenario, a new compliant case (compliant with respect to recovery actions and recovery action related to VFDRs only) was created in which the variant case was modified to set the recovery action failure probability to zero and to set only VFDRs associated with the recovery action to their random failure probability. This new compliant case scenario was then quantified. The delta between the variant case and the new compliant case for these scenarios represents the additional risk of the recovery actions.

All updates to the analysis, including those that included risk result changes, were made using methods previously identified in the NFPA 805 LAR or subsequent RAI responses. A key method that was used in the post LAR revision 01 submittal was the credit taken for the application of non-suppression probabilities in lieu of the removal of the electrical cabinet severity factor method. PRA RAI 01 discussed the use of this approach in the context of the sensitivity evaluation performed for the removal of panel factors. This methodology later became part of the of the baseline Fire PRA analysis as the panel factor removal was incorporated into the baseline Fire PRA model. Other PRA refinements consistent with those used elsewhere in the analysis supporting the original LAR revision 01 submittal were incorporated as needed to reduce the contribution of scenarios for which risk increases resulted from the resolution of the various RAIs.

E1-5 Response to Request for Additional Information Table 1 below provides the summary of the updated results for the risk of recovery actions.

Table 1 Risk of Recover Action Summary Additional Additional Risk Riskofal of RAs (CDF)

RfR Totals Unit 1:

9.98E-06 6.47E-07 Total reduction from removing 5.60E-07 conservatisms New Total Unit 1 9.42E-06 6.47E-07 Totals Unit 2:

1.54E-05 6.68E-07 Total reduction from removing 7.14E-06 conservatisms New Total Unit 2 8.26E-06 6.68E-07 E1-6

Joseph M. Farley Nuclear Plant Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c)

NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generating Plants Table C-2 in Attachment C - Required Fire Protection Systems and Features

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

044-Ul - Control Room Complex & TSC Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R, D Modifications: R D Procedures/Recovery Actions: R D 0401-Ul 401 Control Room None D

None Detection System, 1A-54: D 0412-Ul 412 Kitchen None D

None Detection System, 1A-117: D 0413-Ul 413 Kitchen store None D

None Detection System, 1A-117: D 0414-Ul 414 Toilet None None None None 0416-Ul 416 Unit 1 Instrument Rack Area None D

None Detection System, 1A-54: D 0471-Ul 471 Unit 2 Instrument Rack Area None D

None Detection System, 1A-54: D 0472-Ul 472 Control Room Supply None D

None Detection System, 1A-117: D 0474-U1 474 Office None None None None 0476-Ul 476 Offices None None None None 2453-U1 2453 Technical Support Center None D

None Detection System, 2A-51: D 2454-Ul 2454 Technical Support Center None D

None Detection System, 2A-200: D Detection System, 2A-51: D 2455-Ul 2455 Technical Support Center None D

None Detection System, 2A-200: D Detection System, 2A-51: D Fire Area ID:

044-U2 - Control Room Complex & TSC Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide 0401 -U2 0412-U2 0413-U2 0414-U2 0416-U2 0471 -U2 0472-U2 0474-U2 0476-U2 2453-U2 2454-U2 401 Control Room 412 Kitchen 413 Kitchen store 414 Toilet 416 Unit 1 Instrument Rack Area 471 Unit 2 Instrument Rack Area 472 Control Room Supply 474 Office 476 Offices 2453 Technical Support Center 2454 Technical Support Center None None None None None None None None None None None None None D

D D

None D

D D

None None D

D R, D None None None None None None None None None None None Modifications: R D Procedures/Recovery Actions: R D Detection System, 1A-54: D Detection System, 1A-117: D Detection System, 1A-117: D None Detection System, 1A-54: D Detection System, 1A-54: D Detection System, 1A-117: D None None Detection System, 2A-51: D Detection System, 2A-200: D Detection System, 2A-51: D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:41 Page: I of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

044-U2 - Control Room Complex & TSC Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2455-U2 2455 Technical Support Center None D

None Detection System, 2A-200: D Detection System, 2A-51: D Fire Area ID:

051 -U1 - Control Room HVAC Equipment Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 0501-Ul 501 Control Room HVAC None None None None Equipment Room 2501-Ul 2501 Control Room HVAC None None None None Equipment Room Fire Area ID:

051 -U2 - Control Room HVAC Equipment Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0501 -U2 501 Control Room HVAC None None None None Equipment Room 2501-U2 2501 Control Room HVAC None None None None Equipment Room Fire Area ID:

056A-U1 - DG Building Switchgear Room Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R DGB-56A-U1 DG Building Switchgear Room Train A E, R, D E, R, D E

Detection System, 1 D-115: E R D Detection System, 1 D-80: E R D Detection System, 2D-80: E R D Gaseous Suppression, 1 D-80: E R D Gaseous Suppression, 2D-80: E R D Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:42 Page: 2 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

056A-U2 - DG Building Switchgear Room Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R DGB-56A-U2 DG Building Switchgear Room E, R, D E, R, D E

Detection System, 1 D-115: ER D Train A Detection System, 1D-80: E R D Detection System, 2D-80: E R D Gaseous Suppression, 1D-80: E R D Gaseous Suppression, 2D-80: E R D Restricted transient controls: E Fire Area ID:

056B-U1 - DG Building Switchgear Room Train B & Foyer Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R DGB-56B-U1 DG Building Switchgear Room E, R, D E, R, D E

Detection System, 1D-115: E R D Train B Detection System, 1 D-81: E R D Detection System, 2D-81: E R D Gaseous Suppression, 1 D-81: E R D Gaseous Suppression, 2D-81: E R D Restricted transient controls: E DGB-FOY-U1 DG Building Foyer None E, R, D None Detection System, 1 D-115: E R D Fire Area ID:

056B-U2 - DG Building Switchgear Room Train B & Foyer Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

DGB-56B-U2 DGB-FOY-U2 Area Wide None DG Building Switchgear Room Train B DG Building Foyer E, R, D None None E, R, D R, D R

E None Modifications: R Procedures/Recovery Actions: R Detection System, 1D-115: E R D Detection System, 1D-81: E R D Detection System, 2D-81: E R D Gaseous Suppression, 1 D-81: E R D Gaseous Suppression, 2D-81: E R D Restricted transient controls: E Detection System, 1D-115: R D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:42 Page: 3 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

057-Ul - Diesel Generator Room 2C Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R DGB-2C-U1 Diesel Generator Room 2C E, D E, R, D E

Detection System, 1D-78: E R D Gaseous Suppression, 1 D-78: E D Restricted transient controls: E Fire Area ID:

057-U2 - Diesel Generator Room 2C Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R DGB-2C-U2 Diesel Generator Room 2C E, D E, R, D E

Detection System, 1D-78: E R D Gaseous Suppression, 1 D-78: E D Restricted transient controls: E Fire Area ID:

058-U 1 - Diesel Generator Room 1B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None E, D None E, R, D R

E DGB-1 B-U1 Diesel Generator Room 1 B Modifications: R Procedures/Recovery Actions: R Detection System, 1D-78: E R D Gaseous Suppression, 1D-78: E D Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:42 Page: 4 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

058-U2 - Diesel Generator Room 1 B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R DGB-1 B-U2 Diesel Generator Room 1 B E, D E, R, D E

Detection System, 1 D-78: E R D Gaseous Suppression, 1D-78: E D Restricted transient controls: E Fire Area ID:

059-Ul - Diesel Generator Room 2B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R DGB-2B-U1 Diesel Generator Room 2B E

E, R E

Detection System, 1 D-78: E R Gaseous Suppression, 1 D-78: E Restricted transient controls: E Fire Area ID:

059-U2 - Diesel Generator Room 2B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R DGB-2B-U2 Diesel Generator Room 2B E

E, R E

Detection System, 1 D-78: E R Gaseous Suppression, 1 D-78: E Restricted transient controls: E Fire Area ID:

060-U1 - Diesel Generator Room 1C Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

DGB-1C-UI Area Wide None E, D None E, R, D R

E Diesel Generator Room 1C Modifications: R Procedures/Recovery Actions: R Detection System, 1 D-78: E R D Gaseous Suppression, 1 D-78: E D Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:42 Page: 5 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

060-U2 - Diesel Generator Room 1C Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R DGB-1C-U2 Diesel Generator Room 1C E, D E, R, D E

Detection System, 1D-78: E R D Gaseous Suppression, 1D-78: E D Restricted transient controls: E Fire Area ID:

061-Ul - Diesel Generator Room 1-2A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R DGB-1-2A-U1 Diesel Generator Room 1-2A E, D E, R, D E

Detection System, 1D-78: E R D Gaseous Suppression, 1 D-78: E D Restricted transient controls: E Fire Area ID:

061-U2 - Diesel Generator Room 1-2A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

DGB-I-2A-U2 Area Wide None E, D None E, R, D R

E Diesel Generator Room 1-2A Modifications: R Procedures/Recovery Actions: R Detection System, 1D-78: E R D Gaseous Suppression, 1D-78: E D Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:43 Page: 6 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

062 - Day Fuel Tank Room 2C Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DGB-DFT-2C Day Fuel Tank Room 2C E

E E

Detection System, 1D-79: E Gaseous Suppression, 1 D-79: E Restricted transient controls: E Fire Area ID:

063 - Day Fuel Tank Room 1B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DGB-DFT-1B Day Fuel Tank Room 18 E

E E

Detection System, 1 D-79: E Gaseous Suppression, 1 D-79: E Restricted transient controls: E Fire Area ID:

064 - Day Fuel Tank Room 2B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DGB-DFT-2B Day Fuel Tank Room 2B E

E E

Detection System, 1 D-79: E Gaseous Suppression, 1 D-79: E Restricted transient controls: E Fire Area ID:

065 - Day Fuel Tank Room lC Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DGB-DFT-1C Day Fuel Tank Room 1C E

E E

Detection System, 1 D-79: E Gaseous Suppression, 1D-79: E Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:43 Page: 7 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

066 - Day Fuel Tank Room 1-2A Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DGB-DFT-1-2A Day Fuel Tank Room 1-2A E

E E

Detection System, 1 D-79: E Gaseous Suppression, 1 D-79: E Restricted transient controls: E Fire Area ID:

067 - RWIS Pump Room B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details RWIS-PR-B RWIS Pump Room B None None None None Fire Area ID:

068 - RWIS Pump Room A Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details RWIS-PR-A RWIS Pump Room A None None None None Fire Area ID:

069 - RWIS Switchgear Room-Train B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details RWIS-SG-B RWIS Switchgear Room-Train B None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:43 Page: 8 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

070 - RWIS Switchgear Room-Train A Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details RWIS-SG-A RWIS Switchgear Room-Train A None R

None Detection System, 1 RW-96: R Fire Area ID:

071 - DG Building Corridor Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DGB-COR DG Building Corridor None E

E Detection System, 1D-116: E Restricted transient controls: E Fire Area ID:

072-Ul - Service Water Pump Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Fire Zone ID (All)

SWIS-72A-U1 SWIS-72B-U1 SWIS-72C-U1 SWIS-72D-U1 SWIS-72E-U1 SWIS-PR-U1 Description Area Wide Service Water Pump Room Service Water Pump Room Service Water Pump Room Service Water Pump Room Service Water Pump Room Service Water Pump Room Required Suppression System None None None None None None D

Required Detection System None None None None None None R, D Required Fire Protection Feature R

None None None None None None Required Fire Protection Feature and System Details Procedures/Recovery Actions: R None None None None None Detection System, 1SW-111: R D Detection System, 1SW-111A: R D Detection System, 1SW-111 B: R D Water Suppression, ISW-111: D Water Suppression, 1SW-111A: D Water Suppression, 1SW-111 B: D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:43 Page: 9 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

072-U2 - Service Water Pump Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R SWIS-72A-U2 Service Water Pump Room None None None None SWIS-72B-U2 Service Water Pump Room None None None None SWIS-72C-U2 Service Water Pump Room None None None None SWIS-72D-U2 Service Water Pump Room None None None None SWIS-72E-U2 Service Water Pump Room None None None None SWIS-PR-U2 Service Water Pump Room D

R, D None Detection System, 1SW-111: R D Detection System, 1SW-111A: R D Detection System, 1SW-111B: R D Water Suppression, 1SW-111: D Water Suppression, 1SW-111A: D Water Suppression, 1SW-i11 B: D Fire Area ID:

073 - SWIS Battery Room-Train B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details SWIS-BAT-B SWIS Battery Room-Train B None E

E Detection System, 1 SW-97: E Restricted transient controls: E Fire Area ID:

074 - SWIS Battery Room-Train A Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details SWIS-BAT-A SWIS Battery Room-Train A None E

E Detection System, 1SW-97: E Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:43 Page: 10 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

075-U1 - SWIS 5 kV Switchgear Room B & West Stairs Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R SWIS-SG-B-U1 SWIS 5 kV Disconnect Switch E, D E, R, D E

Detection System, 1 SW-97: E R D Train B, Switchgear Room B Gaseous Suppression, 1 SW-99: E D Gaseous Suppression, 2SW-99: E D Restricted transient controls: E SWIS-STAIR-W-U1 SWIS West Stairwell None R, D None Detection System, 1SW-97: R D Fire Area ID:

075-U2 - SWIS 5 kV Switchgear Room B & West Stairs Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R SWIS-SG-B-U2 SWIS 5 kV Disconnect Switch E, D E, R, D E

Detection System, 1SW-97: E R D Train B, Switchgear Room B Gaseous Suppression, 1SW-99: E D Gaseous Suppression, 2SW-99: E D Restricted transient controls: E SWIS-STAIR-W-U2 SWIS West Stairwell None R, D None Detection System, 1 SW-97: R D Fire Area ID:

076-Ul - SWIS 5 kV Switchgear Room A & East Stairs Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

SWIS-SG-A-U1 SWIS-STAIR-E-U1 Area Wide SWIS 5 kV Disconnect Switch Train A, Switchgear Room A SWIS East Stairwell None E, D None None E, R, D R, D R

E None Procedures/Recovery Actions: R Detection System, 1SW-97: E R D Gaseous Suppression, 1SW-99: E D Gaseous Suppression, 2SW-99: E D Restricted transient controls: E Detection System, 1SW-97: R D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:44 Page: 11 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

076-U2 - SWIS 5 kV Switchgear Room A & East Stairs Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R SWIS-SG-A-U2 SWIS 5 kV Disconnect Switch E, D E, R, D E

Detection System, 1SW-97: E R D Train A, Switchgear Room A Gaseous Suppression, ISW-99: ED Gaseous Suppression, 2SW-99: E D Restricted transient controls: E SWIS-STAIR-E-U2 SWIS East Stairwell None R, D None Detection System, 1SW-97: R D Fire Area ID:

093 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0601 Drumming Area/Combustible None None None None Storage Room 0602 Passageway/Combustible None None None None Storage Room 0603 Drum Storage Area/Combustible None None None None Storage Room 2601 Drumming Area/Combustible None None None None Storage Room 2602 Passageway/Combustible E

E E

Detection System, 1A-134: E Storage Room Restricted transient controls: E Water Suppression, 1A-134: E 2603 Drum Storage Area/Combustible None None None None Storage Room Fire Area ID:

1-001 - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide 0101 0102 0103 101 Waste Gas Decay Tank Room 102 Valve Compartment Room 103 Corridor None None None None None R

R None None E

Modifications: R Procedures/Recovery Actions: R Detection System, 1A-132: R Detection System, 1A-132: R Detection System, 1A-132: E R Restricted transient controls: E R

E, R Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:44 Page: 12 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-001 - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0104 104 Passageway to Unit 2 None E, R E

Detection System, 1A-132: E R Plant staff Training: E Restricted transient controls: E Detection System, 1A-132: R 0105 0106 0108 0109 0110 0111 0112 0113 0114 0115 0118 0119 0120 0121 0122 0123 0124 0125 0126 0127 0128 0129 0130 0131 0169 0183 105 Catalytic H2 Recombiner 1A Room 106 Catalytic H2 Recombiner 1B Room 108 Waste Monitor Tank Room 109 Waste Monitor Tank Pump Room 110 Monitor Control Panel Room 111 Containment Spray Pump Room 1A 112 Access to Tendon Access Gallery 113 Valve Encapsulation 114 Pipe Chase 115 Hallway 118 Floor Drain Tank Room 119 Waste Holdup Tank Room 120 Corridor 121 Floor Drain Tank Pump Room 122 Waste Evaporator Feed Pump Room 123 Pipe Chase 124 Valve Encapsulation 125 Containment Spray Pump Room 1B 126 Pipe Chase 127 Pipe Chase 128 RHR Heat Exchanger Room 129 RHR Low Head Pump Room 130 Pipe Chase 131 RHR Low Head Pump Room 169 Duct and Pipe Chase 183 Tendon Access Gallery Entrance None None None None None None None None None None None None None None None None None None None None None None None None None None R

R R

R R

R None R

None None R

R R

R None None None None None None None None None E

None None None None None None None None None None None None None None None E

Detection System, 1A-132: R Detection System, 1A-100: R Detection System, 1A-100: R Detection System, 1A-100: R Detection System, 1A-i100: R None Detection System, 1A-i100: R None Restricted transient controls: E Detection System, 1A-100: R Detection System, IA-100: R Detection System, IA-100: R Detection System, 1A-100: R Detection System, IA-100: R None Detection System, 1A-100: R Detection System, 1A-100: E R D None None Detection System, 1A-1 00: R Detection System, 1A-1 00: R D None Detection System, 1A-1 00: R D None Detection System, 1A-1 01: E R D Restricted transient controls: E R

None R

E, R, D None None R

R, D None R, D None E, R, D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:44 Page: 13 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-001 -Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0184 184 Piping Penetration Room, El.

None R, D None Detection System, 1A-1 02: R D 100'-0",

0196 196 Access to Tendon Access None None None None Gallery 0223 223 Piping Penetration Room, El.

D R

None Detection System, 1A-45: R 121'-0" Water Suppression, 1A-45: D Fire Area ID:

1-004-Ul - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide 0140-U1 0151-U1 0152-U1 0153-U1 0154-Ul 0154A-U1 0155-U1 0156-U1 0157-U1 0158-Ul 0159-Ul 0160-Ul 0161-Ul 0162-Ul 0163-U1 140 Waste Gas Decay Tank Drain Filter Room 151 Waste Gas Decay Tank Rooms 152 Valve Compartment Room 153 Waste Gas Compressor Room 154 Waste Evaporator Steam Generator Room 154A Valve Compartment Room 155 Passageway to Unit 2(1) 156 Holdup Tank Room 157 Holdup Tank Room 158 Holdup Tank Room 159 Recycle Evaporator Feed Pump Room 160 Hatch Area 161 Corridor None None None None None None None None None None None None None E, D E, D E, D None None D

D D

D D

None None None None None D

E, D E, D E, D R

None None None None None None E

None None None None None E

E, D None Modifications: R Procedures/Recovery Actions: R None Detection System, 1A-1i02: D Detection System, 1A-1 02: D Detection System, 1A-102: D Detection System, 1A-1 02: D Detection System, 1A-102: D Restricted transient controls: E None None None None Detection System, 1A-118: D Detection System, 1A-118: E D Restricted transient controls: E Water Suppression, 1A-118: E D Detection System, 1A-25: E D Restricted transient controls: E D Water Suppression, 1A-25: E D Detection System, 1A-25: E D Water Suppression, 1A-25: E D 162 Hallway 163 WDS Control Panel Room Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:44 Page: 14 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-004-Ul - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0164-Ul 164 Laundry and Hot Shower D

D None Detection System. 1A-25: D 0165-Ul 0166-U1 0168-Ul 0170-U1 0175-Ul 0176-Ul 0177-Ul 0178-U1 0180-U1 0186-U1 0187-Ul 0188-Ul 0203-U1 0204-Ul 0205-U1 0206-Ul 0207-Ul 0208-U1 0209-U1 0215-U1 0216-U1 0217-U1 Tank Room/Storage Room 165 Waste Gas Decay Tank Room 166 Waste Gas Decay Tank Room 168 Chemical and Laundry Drain Tank Room 170 Letdown Heat Exchanger Room 175 Hallway 176 Secondary Spent-Resin Storage Tank Room 177 Pump Room 178 Filter Room 180 Recycle Evaporator Steam Generator Room 186 Boric Acid Area 187 Hydro Test Pump Room 188 Boric Acid Tank Area 203 Waste Condenser Tanks and Pump Room 204 Waste Evaporator Package Room 205 Passageway to Unit 2 206 Heat Exchanger Room 207 Hatch Area 208 Corridor 209 Hallway 215 Duct and Pipe Chase 216 Valve Compartments Area 217 Volume Control Tank Room None None D

D D

D None E, D None None None None E, D E, D None E, D D

D D

None None None None None None E, D E, D D

None None None D

D D

D D

None None D

None None None None None None None None None None None E

None E

E None None None None Water Suppression, 1A-25: D Detection System, 1A-102: D Detection System, 1A-1i02: D Detection System, 1A-25: D Restricted transient controls: D Water Suppression, 1A-25: D Detection System, 1A-101: E D Detection System, 1A-118: E D Water Suppression, 1A-118: E D None Detection System, 1A-101: E D Detection System, 1A-101: D Detection System, 1A-101: D Detection System, 1A-118: D Water Suppression, 1A-118: D Detection System, 1A-101: D Detection System, 1A-103: D Detection System, 1A-104: D Detection System, 1A-104: D Detection System, 1A-35: E D Restricted transient controls: E Detection System, 1A-1i04: D Detection System, 1A-35: E D Restricted transient controls: E Water Suppression, 1A-1 30: E D Detection System, IA-35: E D Restricted transient controls: E Water Suppression, 1A-35: E D Detection System, 1A-35: D Water Suppression, 1A-35: D None Detection System, 1A-103: D None E, D D

E, D E, D D

None D

None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:45 Page: 15 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-004-Ul - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0218-U1 0219-Ul 0220-Ul 0221-Ul 0222-U1 0230-Ul 0231-Ul 0232-Ul 0236-Ul 0237-Ul 0238-Ul 0239-Ul 0240-Ul 0253-Ul 0301-Ul 0302-U1 0303-Ul 0304-U1 0305-Ul 0306-Ul 0307-Ul 0308-Ul 0309-Ul 0310-U1 031 1-Ul 0312-Ul 218 Chiller Unit Room 219 Pipe Chase 220 Valve Compartment Room 221 Primary Spent-Resin Storage Tank Room 222 Corridor 230 Recycle Evaporator Package Room 231 Sluice Pump Room 232 Sluice Filter Room 236 Duct Chase 237 Corridor 238 Cask Storage Area 239 Transfer Canal 240 Spent-Fuel Pool Room 253 Valve Compartment 301 Seal Water Filter Room 302 Recycle Evaporator Feed Filter Room 303 Reactor Coolant Filter Room 304 Waste Monitor 305 Seal Injection Filter Room 306 Recycle Evaporator Feed Demineralizer Room 307 Valve Compartment Room 308 Waste Condensate and Monitor Tank Demineralizer Room 309 Hatch Area 310 Valve Compartment Room 311 Recycle Evaporator Concentrates Filter Room 312 Corridor 313 Floor Drain and Laundry Tank Filter Room None None None None None None D

None None None None None D

None None None None None None None None None None None None None None None None None None None None D

None D

D D

D None D

D D

D None D

D D

D D

None D

None E, D D

D D

D None None None None None None None None None None None None None None None None None None E

None None None None None None Detection System, 1A-103: D None Detection System, 1A-35: D Water Suppression, 1A-35: D Detection System, 1A-1 03: D Detection System, 1A-103: D Detection System, 1A-103: D None Detection System, 1A-103: D Detection System, 1A-103: D Detection System, 1A-107: D Detection System, 1A-107: D Detection System, 1A-107: D None Detection System, 1A-105: D Detection System, IA-105: D Detection System, 1A-105: D Detection System, 1A-105: D Detection System, 1A-105: D None Detection System, 1A-105: D None Detection System, 1A-1 05: E D Restricted transient controls: E Detection System, 1A-105: D Detection System, 1A-105: D Detection System, 1A-105: D Detection System, 1A-48: D Water Suppression, 1A-48: D Detection System, 1A-105: D 0313-U1 Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:45 Page: 16 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-004-Ul - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0314-Ul 314 Waste Evaporator Feed Filter None D

None Detection System, 1A-1 05: D 0315-Ul 0316-U1 0322-U1 0323-U1 0324-U1 0325-U1 0326-Ul 0327-Ul 0328-Ul 0329-Ul 0330-Ul 0331-Ul 0332-Ul 0340-Ul 0341-Ul 0342-Ul 0348-Ul 0351-Ul 0400-U 1 0402-U 1 0403-Ul 0405-Ul 0406-Ul 0407-Ul 0408-Ul Room 315 Recycle Waste Condenser Filter Room 316 Passageway to Unit 2 322 Hallway 323 Sample Room 324 Primary Chemistry Lab 325 Counting Room/Spectro-photometer Lab 326 Radiochemistry Lab 327 Valve Access Area 328 BTR Demineralizer Room 329 Pipe Tunnel 330 Chiller Surge Tanks Pump Room 331 Valve Access Area 332 MCC 1A/2A Area 340 Demineralizer Compartment 341 Pipe Chase 342 Spent-Fuel Pool Pump Room 348 Cask Wash Area Chiller Surge Tank Room Primary Access Point 402 Passage to Unit 2 403 Hot Instrument Shop 405 Hatch Room 406 Decontamination Room 407 Hot Machine Shop 408 Hallway None D

D E, D None None None None None None None None None None None None None None None None D

None None E, D None None E, D E, D D

D D

D None None D

D None E

E None None None None None None None None None None None None None None None E

None None None E

E None Detection System, 1A-105: D Detection System, 1A-48: E D Restricted transient controls: E Water Suppression, 1A-48: D Detection System, 1A-48: E D Restricted transient controls: E Water Suppression, 1A-48: E D Detection System, 1A-49: D Detection System, 1A-49: D Detection System, 1A-49: D Detection System, 1A-49: D None None Detection System, 1A-105: D Detection System, 1A-107: D Detection System, 1A-48: D Detection System, 1A-48: D Detection System, 1A-48: D None None Detection System, 1A-48: D Detection System, 1A-1 07: D None Plant staff Training: E Detection System, 1A-114: D Water Suppression, 1A-114: D Detection System, 1A-57: D Detection System, 1A-57: D Detection System, 1A-136: E D Restricted transient controls: E Water Suppression, 1A-1 36: E D Detection System, 1A-107: E D Restricted transient controls: E Detection System, 1A-107: D D

D None None D

D None None D

D D

E, D E, D D

Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:45 Page: 17 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-004-Ul -Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0409-Ul 409 Hallway None D

E Detection System, 1A-57: D 0410A-U1 041 OB-U 1 0415-U1 0417-U1 0418-U1 0419-U1 0422-Ul 0423-Ul 0424-Ul 0425-Ul 0426-Ul 0427-U1 0429-U1 0432-U1 0438-Ul 0441-U 1 0445-Ul 0446-U 1 0448-U 1 0449-Ul 0450-Ul 0451-U1 0453-U 1 0454-U 1 410A 600-V Load Center 410B 600-V Load Center 415 Corridor 417 Corridor 418 Auxiliary Building and Containment Purge Vent Equipment Room 419 Demineralizer Hatch Area 422 Corridor 423 Valve Compartment 424 Demineralizer Compartment 425 Demineralizer Compartment 426 Demineralizer Compartment 427 Demineralizer Compartment 429 Containment Purge Air Equipment Room 432 Corridor 438 Hot Water Heater Room 441 Tool Room 445 Spent-Fuel Pool Heat Exchanger Room 446 Hallway 448 SFPC Pump Room 449 Demineralizer Room 450 Valve Compartment 451 Filter Room 453 Clean Janitor 454 Lobby D

D D

D D

D D

D D

None None None None None None None None None D

D D

None None None None E, D None None None None None None None None None None None None E

None None E

None None None None None None None E

Restricted transient controls: E Detection System, 1A-57: D Gaseous Suppression, 1A-50: D Detection System, 1A-57: D Gaseous Suppression, 1A-50: D Detection System, 1A-114: D Water Suppression, 1A-114: D Detection System, 1A-114: D Water Suppression, 1A-114: D Detection System, 1A-107: D Detection System, 1A-57: D Detection System, 1A-107: D Detection System, 1A-107: D None None None None Detection System, 1A-108: E D Restricted transient controls: E Detection System, 1A-114: D Water Suppression, 1A-114: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-57: E Restricted transient controls: E Detection System, 1A-107: D Detection System, 1A-107: D Detection System, 1A-107: D None None None Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-114: E D Restricted transient controls: E Water Suppression, 1A-114: E D D

D D

None None None None None None None D

E, D D

E D

D D

None None None D

E, D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:45 Page: 18 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-004-Ul - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0455-Ul 455 Clean Toilet Room (Men's)

D D

None Detection System, 1A-108: D 0456-U1 0461-U1 0462-U 1 0463-U1 0464-U 1 0467-Ul 0478-Ul 0480-Ul 0481-Ul 0482-Ul 0483-U 1 0484-U 1 0485-U1 0486-Ul 0487-Ul 0488-Ul 0489-Ul 0490-Ul 0491-U1 0504-Ul 0505-U1 456 Drying Area 461 Dosimetry Lab 462 Nonradioactive Vent Equipment Room 463 Storage Room 464 Storage Room 467 SFP Heat Exchanger Room 478 Motor Control Center Room 480 Health Physics Briefing/Planning Room 481 Health Physicist Room 482 Air Sample & Smear Analysis Rm.

483 Passage 484 Hot Toilet (Women's) 485 Hot Toilet (Men's) 486 Survey Preparation Room 487 Instrument Calibration Room 488 Instrument Issue & Storage Rm.

489 Waste & Decon. Foreman Office 490 Clean Toilet (Women's) 491 Passage 504 Stair No. 6, El. 184'-0" 505 Spent-Fuel Pool Vent Equipment Room D

D D

None None None None D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

None None None None None None None None None None None None None None None None None None None None None Water Suppression, 1A-52B: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-51: D Water Suppression, 1A-52A: D Water Suppression, 1A-52B: D Detection System, 1A-51: D Water Suppression, 1A-51: D Detection System, 1A-51: D Detection System, 1A-51: D Detection System, 1A-107: D Detection System, IA-107: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-1 08: D Water Suppression, 1A-52B: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, lA-108: D Water Suppression, 1A-52B: D Detection System, lA-108: D Water Suppression, 1A-52B: D Detection System, 1A-108: D Water Suppression, 1A-52B: D Detection System, 1A-108: D Detection System, 1A-114: D Water Suppression, 1A-52B: D Detection System, 1A-109: D Detection System, 1A-109: D None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:46 Page: 19 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-004-Ul - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0506-U1 506 Component Cooling Surge None D

None Detection System, 1A-110: D Tank Room 0604-Ul 604 Passage None E, D E

Detection System, 1A-105: E D Restricted transient controls: E 0605-Ul 605 Blowdown Pumps and Surge None D

None Detection System, 1A-105: D Tank Room 0606-Ul 606 Filter Room None D

None Detection System, 1A-105: D 0607-Ul 607 Filter Room None D

None Detection System, 1A-105: D 0608-U1 608 Blowdown Heat Exchanger None D

None Detection System, 1A-105: D Room 0609-U1 609 Storage Room None D

None Detection System, 1A-105: D 0610-U1 610 Valve Compartment Room None D

None Detection System, 1A-105: D CHASE-Ul CHASE None None None None Fire Area ID:

1-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0140-U2 140 Waste Gas Decay Tank Drain None None None None 0151-U2 0152-U2 0153-U2 0154-U2 0154A-U2 01 55-U2 0156-U2 0157-U2 0158-U2 0159-U2 0160-U2 Filter Room 151 Waste Gas Decay Tank Rooms 152 Valve Compartment Room 153 Waste Gas Compressor Room 154 Waste Evaporator Steam Generator Room 154A Valve Compartment Room 155 Passageway to Unit 2(1) 156 Holdup Tank Room 157 Holdup Tank Room 158 Holdup Tank Room 159 Recycle Evaporator Feed Pump Room 160 Hatch Area None None None None None None None None None None None R

R R

R R

E None None None None None E

None None None None None Detection System, 1A-102: R Detection System, 1A-102: R Detection System, 1A-102: R Detection System, lA-102: R Detection System, 1A-102: R Detection System, 1A-25: E Restricted transient controls: E None None None None Detection System, 1A-118: R None None None None R

Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:46 Page: 20 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

Compliance Basis:

1-004-U2 - Aux Building NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature 0161-U2 161 Corridor E

E, R E

01 62-U2 0163-U2 01 64-U2 01 65-U2 01 66-U2 01 68-U2 0170-U2 0175-U2 0176-U2 0177-U2 0178-U2 0180-U2 0186-U2 0187-U2 0188-U2 0203-U2 0204-U2 0205-U2 0206-U2 0207-U2 0208-U2 162 Hallway E

163 WDS Control Panel Room 164 Laundry and Hot Shower Tank Room/Storage Room 165 Waste Gas Decay Tank Room 166 Waste Gas Decay Tank Room 168 Chemical and Laundry Drain Tank Room 170 Letdown Heat Exchanger Room 175 Hallway 176 Secondary Spent-Resin Storage Tank Room 177 Pump Room 178 Filter Room 180 Recycle Evaporator Steam Generator Room 186 Boric Acid Area 187 Hydro Test Pump Room 188 Boric Acid Tank Area 203 Waste Condenser Tanks and Pump Room 204 Waste Evaporator Package Room 205 Passageway to Unit 2 206 Heat Exchanger Room 207 Hatch Area E

None None None None None E

None None None None None None None None None None None E

E, R E, R R

R R

R E, R E, R None E, R R

R R

R R

R R

E, R R

E, R E, R E

None None None None None None None None None None None None None None None None E

None E

E Required Fire Protection Feature and System Details Detection System, 1A-118: E R Restricted transient controls: E Water Suppression, 1A-118: E Detection System, 1A-25: E R Restricted transient controls: E Water Suppression, 1A-25: E Detection System, 1A-25: E R Water Suppression, 1A-25: E Detection System, IA-25: R Detection System, 1A-102: R Detection System, IA-102: R Detection System, 1A-25: R Detection System, IA-101: E R Detection System, 1A-118: E R Water Suppression, 1A-118: E None Detection System, 1A-101: E R Detection System, 1A-101: R Detection System, 1A-101: R Detection System, 1A-118: R Detection System, 1A-101: R Detection System, 1A-103: R Detection System, 1A-104: R Detection System, 1A-104: R Detection System, 1A-35: E R Restricted transient controls: E Detection System, 1A-104: R Detection System, 1A-35: E R Restricted transient controls: E Water Suppression, IA-130: E Detection System, 1A-35: E R Restricted transient controls: E Water Suppression, 1A-35: E 208 Corridor E

Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:46 Page: 21 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0209-U2 0215-U2 0216-U2 0217-U2 0218-U2 0219-U2 0220-U2 0221-U2 0222-U2 0230-U2 0231 -U2 0232-U2 0236-U2 0237-U2 0238-U2 0239-U2 0240-U2 0253-U2 0301-U2 0302-U2 0303-U2 0304-U2 0305-U2 0306-U2 0307-U2 0308-U2 0309-U2 0310-U2 031 1-U2 03112-U2 209 Hallway 215 Duct and Pipe Chase 216 Valve Compartments Area 217 Volume Control Tank Room 218 Chiller Unit Room 219 Pipe Chase 220 Valve Compartment Room 221 Primary Spent-Resin Storage Tank Room 222 Corridor 230 Recycle Evaporator Package Room 231 Sluice Pump Room 232 Sluice Filter Room 236 Duct Chase 237 Corridor 238 Cask Storage Area 239 Transfer Canal 240 Spent-Fuel Pool Room 253 Valve Compartment 301 Seal Water Filter Room 302 Recycle Evaporator Feed Filter Room 303 Reactor Coolant Filter Room 304 Waste Monitor 305 Seal Injection Filter Room 306 Recycle Evaporator Feed Demineralizer Room 307 Valve Compartment Room 308 Waste Condensate and Monitor Tank Demineralizer Room 309 Hatch Area 310 Valve Compartment Room 311 Recycle Evaporator Concentrates Filter Room 312 Corridor None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None R

None R

None None None R

None R

R R

R None R

R None R

None R

R R

R R

None R

None None None None None None None None None None None None None None None None None None None None None None None None None None None E

None None None Detection System, 1A-35: R None Detection System, 1A-103: R None None None Detection System, 1A-103: R None Detection System, 1A-35: R Detection System, IA-103: R Detection System, 1A-103: R Detection System, 1A-103: R None Detection System, 1A-103: R Detection System, 1A-103: R Detection System, 1A-i107: R None Detection System, 1A-107: R None Detection System, 1A-105: R Detection System, 1A-105: R Detection System, 1A-105: R Detection System, 1A-105: R Detection System, 1A-105: R None Detection System, 1A-105: R None Detection System, IA-105: E R Restricted transient controls: E Detection System, 1A-105: R Detection System, IA-105: R Detection System, 1A-105: R Detection System, 1A-48: R E, R R

R R

Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:46 Page: 22 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0313-U2 313 Floor Drain and Laundry None R

None Detection System, 1A-105: R 0314-U2 0315-U2 0316-U2 0322-U2 0323-U2 0324-U2 0325-U2 0326-U2 0327-U2 0328-U2 0329-U2 0330-U2 0331 -U2 0332-U2 0340-U2 0341 -U2 0342-U2 0348-U2 0351-U2 0400-U2 0402-U2 0403-U2 0405-U2 0406-U2 0407-U2 0408-U2 0409-U2 Tank Filter Room 314 Waste Evaporator Feed Filter Room 315 Recycle Waste Condenser Filter Room 316 Passageway to Unit 2 322 Hallway 323 Sample Room 324 Primary Chemistry Lab 325 Counting Room/Spectro-photometer Lab 326 Radiochemistry Lab 327 Valve Access Area 328 BTR Demineralizer Room 329 Pipe Tunnel 330 Chiller Surge Tanks Pump Room 331 Valve Access Area 332 MCC 1AN2A Area 340 Demineralizer Compartment 341 Pipe Chase 342 Spent-Fuel Pool Pump Room 348 Cask Wash Area Chiller Surge Tank Room Primary Access Point 402 Passage to Unit 2 403 Hot Instrument Shop 405 Hatch Room 406 Decontamination Room 407 Hot Machine Shop 408 Hallway 409 Hallway None None None R

R E, R E, R E

None None None None None None None None None None None None None None None None None None None E

None None None R

R R

R None None None R

R R

None None R

None R

None R

R R

E, R E, R R

E, R None None E

E None None None None None None None None None None None None None None None E

None None None E

E None E

Detection System, 1A-105: R Detection System, 1A-105: R Detection System, 1A-48: E R Restricted transient controls: E Detection System, 1A-48: E R Restricted transient controls: E Water Suppression, 1A-48: E Detection System, 1A-49: R Detection System, 1A-49: R Detection System, 1A-49: R Detection System, 1A-49: R None None None Detection System, 1A-48: R Detection System, 1A-48: R Detection System, 1A-48: R None None Detection System, 1A-48: R None Detection System, 1A-48: R Plant staff Training: E Detection System, 1A-114: R Detection System, 1A-57: R Detection System, 1A-57: R Detection System, 1A-136: E R Restricted transient controls: E Water Suppression, 1A-136: E Detection System, 1A-107: E R Restricted transient controls: E Detection System, 1A-107: R Detection System, 1A-57: E R Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08127/2014 12:34:46 Page: 23 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0410A-U2 0410B-U2 0415-U2 0417-U2 0418-U2 0419-U2 0422-U2 0423-U2 0424-U2 0425-U2 0426-U2 0427-U2 0429-U2 0432-U2 0438-U2 0441 -U2 0445-U2 0446-U2 0448-U2 0449-U2 0450-U2 0451 -U2 0453-U2 0454-U2 0455-U2 0456-U2 0461 -U2 0462-U2 0463-U2 0464-U2 0467-U2 410A 600-V Load Center 410B 600-V Load Center 415 Corridor 417 Corridor 418 Auxiliary Building and Containment Purge Vent Equipment Room 419 Demineralizer Hatch Area 422 Corridor 423 Valve Compartment 424 Demineralizer Compartment 425 Demineralizer Compartment 426 Demineralizer Compartment 427 Demineralizer Compartment 429 Containment Purge Air Equipment Room 432 Corridor 438 Hot Water Heater Room 441 Tool Room 445 Spent-Fuel Pool Heat Exchanger Room 446 Hallway 448 SFPC Pump Room 449 Demineralizer Room 450 Valve Compartment 451 Filter Room 453 Clean Janitor 454 Lobby 455 Clean Toilet Room (Men's) 456 Drying Area 461 Dosimetry Lab 462 Nonradioactive Vent Equipment Room 463 Storage Room 464 Storage Room 467 SFP Heat Exchanger Room None None None None None None None None None None None None None None None None None None None None None None None E

None None None None None None None R

R R

R R

R None R

None None None None E, R R

R E, R R

None None None None None R

E, R None None None None None None None None None None None None E

None None E

None None None None None None None E

None None None None None None None Detection System, 1A-57: R Detection System, 1A-57: R Detection System, 1A-114: R Detection System, 1A-114: R Detection System, 1A-1i07: R Detection System, 1A-57: R None Detection System, 1A-1 07: R None None None None Detection System, 1A-108: E R Restricted transient controls: E Detection System, 1A-114: R Detection System, 1A-108: R Detection System, 1A-57: E R Restricted transient controls: E Detection System, 1A-1 07: R None None None None None Detection System, 1A-1i08: R Detection System, 1A-114: E R Restricted transient controls: E Water Suppression, 1A-114: E Detection System, 1A-i108: R Detection System, 1A-1 08: R Detection System, lA-51: R Detection System, lA-51: R Detection System, 1A-51i: R Detection System, 1A-51i: R Detection System, 1A-107: R R

R R

R R

R R

Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:47 Page: 24 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

Compliance Basis:

1-004-U2 - Aux Building NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Fire Zone ID 0478-U2 0480-U2 0481-U2 0482-U2 0483-U2 0484-U2 0485-U2 0486-U2 0487-U2 0488-U2 0489-U2 0490-U2 0491 -U2 0504-U2 0505-U2 0506-U2 0604-U2 0605-U2 0606-U2 0607-U2 0608-U2 0609-U2 0610-U2 CHASE-U2 Description 478 Motor Control Center Room 480 Health Physics Briefing/Planning Room 481 Health Physicist Room 482 Air Sample & Smear Analysis Rm.

483 Passage 484 Hot Toilet (Women's) 485 Hot Toilet (Men's) 486 Survey Preparation Room 487 Instrument Calibration Room 488 Instrument Issue & Storage Rm.

489 Waste & Decon. Foreman Office 490 Clean Toilet (Women's) 491 Passage 504 Stair No. 6, El. 184'-0" 505 Spent-Fuel Pool Vent Equipment Room 506 Component Cooling Surge Tank Room 604 Passage 605 Blowdown Pumps and Surge Tank Room 606 Filter Room 607 Filter Room 608 Blowdown Heat Exchanger Room 609 Storage Room 610 Valve Compartment Room CHASE Required Suppression System None None Required Detection System R

R Required Fire Protection Feature None None Required Fire Protection Feature and System Details Detection System, 1A-107: R Detection System, IA-108: R None None None None None None None None None None None None None None None None None None None None None None R

R R

R R

R R

R R

R R

R R

R None None None None None None None None None None None None None None E

None None None None None None None Detection System, 1A-108: R Detection System, IA-108: R Detection System, 1A-108: R Detection System, 1A-108: R Detection System, 1A-1 08: R Detection System, 1A-108: R Detection System, 1A-108: R Detection System, 1A-108: R Detection System, 1A-108: R Detection System, 1A-108: R Detection System, 1A-108: R Detection System, 1A-114: R Detection System, 1A-109: R Detection System, 1A-109: R Detection System, 1A-110: R Detection System, 1A-105: E R Restricted transient controls: E Detection System, 1A-105: R Detection System, IA-105: R Detection System, 1A-105: R Detection System, 1 A-105: R Detection System, 1A-i105: R Detection System, 1A-i105: R None E, R R

R R

R R

R None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:47 Page: 25 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-005 - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 0172 172 Hallway E, D E, R, D E

Detection System, 1A-118: E R D Restricted transient controls: E Water Suppression, 1A-118: E D 0173 173 Charging/Safety Injection None E, R, D None Detection System, 1A-1 01: E R D Pump Room 0174 174 Charging/Safety Injection None E, R, D None Detection System, 1A-101: E R D Pump Room 0181 181 Charging/Safety Injection None E, R, D None Detection System, 1A-1 01: E R D Pump Room 0182 182 Contaminated Storage Area None R, D None Detection System, 1A-101: R D Fire Area ID:

1-006 - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 0185 0189 0190 0191 0192 0193 0194 0195 0199 Area Wide 185 Component Cooling Water Heat Exchanger Room 189 Plant Heating Equipment Room 190 Motor Control Center 1 E Room 191 Auxiliary Feedwater Pump Room 192 Auxiliary Feedwater Pump Room 193 Auxiliary Feedwater Pump Room 194 Equipment Room 195 Access Hatch Room 199 Phosphate Tank and Pump Area None E, D None E, R, D D

R, D E, D None None None None None None E, R, D R, D R, D R, D R, D None None R, D E

None E

None None None None None E

Modifications: R D Detection System, 1A-119: E R D Detection System, 1A-27: E R D Detection System, Heat Detectors: R D Restricted transient controls: E Water Suppression, 1A-119: E D Water Suppression, 1A-27: E D Detection System, 1A-62: R D Water Suppression, 1A-62: D Detection System, 1A-62: E R D Restricted transient controls: E Water Suppression, 1A-62: E D Detection System, 1A-i102: R D Detection System, 1A-102: R D Detection System, 1A-102: R D Detection System, 1A-62: R D None Curbs: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:47 Page: 26 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-006 - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0241 241 Main Steam and Feedwater None E, R, D None Detection System, 1A-1i06: E R D Valve Room 0242 242 Pipe Chase None None None None 0243 243 Pipe Chase None None None None Fire Area ID:

1-008-Ul -Aux Building Cable Chase, Room 116 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 0116-Ul 116 Cable Chase E, D E, R, D E

Detection System, 1A-53: E R D Restricted transient controls: E Water Suppression, 1A-53: E D Fire Area ID:

1-008-U2 - Aux Building Cable Chase, Room 116 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 0116-U2 Area Wide 116 Cable Chase None E, D None E, R, D R

E Procedures/Recovery Actions: R Detection System, 1A-53: E R D Restricted transient controls: E Water Suppression, 1A-53: E D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:47 Page: 27 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-009-Ul - Aux Building Cable Chase, Rooms 117 & 246 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 01 17-Ul 117 Cable Chase E, R, D E, R, D E, D Detection System, 1A-55: E R D Restricted transient controls: E D Water Suppression, 1A-55: E R D 0246-U1 246 Cable Chase R, D R, D D

Detection System, 1A-55: R D Restricted transient controls: D Water Suppression, 1A-55: R D Fire Area ID:

1-009-U2 - Aux Building Cable Chase, Rooms 117 & 246 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details 0117-U2 117 Cable Chase E, R E, R E

Detection System, 1A-55: E R Restricted transient controls: E Water Suppression, 1A-55: E R 0246-U2 246 Cable Chase R

R None Detection System, 1A-55: R Water Suppression, 1A-55: R Fire Area ID:

1-012 - Hallway & Local Hot Shutdown Panel Room Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 0254 Area Wide None None E, R, D R

E, D 254 Hallway/Local Hot Shutdown None Panel Room Modifications: R Procedures/Recovery Actions: R Detection System, 1A-1 04: E R D Plant staff Training: E Restricted transient controls: E D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:47 Page: 28 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-013-Ul - Aux Building Cable Chase, Rooms 227, 300, 465, 466, & 500 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 0227-U1 227 Vertical Cable Chase, El.

R, S R, D, S R, S Detection System, 1A-23: R D S 128'-0" One Hour Rated Cable: R S Water Suppression, 1A-23: R S 0300-Ul 300 Vertical Cable Chase, El 141 R, S R, D, S R, S Detection System, 1A-23: R D S ft 0 in.

One Hour Rated Cable: R S Water Suppression, 1A-23: R S 0465-U1 465 Vertical Cable Chase, El.

R R, D None Detection System, 1A-23: R D 155'-0" Water Suppression, 1A-23: R 0466-U 1 466 Vertical Cable Chase, El.

R, D R, D None Detection System, 1A-23: R D 155'-0" Water Suppression, 1A-23: R D 0500-Ul 500 Vertical Cable Chase, El.

R, D R, D None Detection System, 1A-23: R D 168'-6" Water Suppression, 1A-23: RD Fire Area ID:

1-01 3-U2 - Aux Building Cable Chase, Rooms 227, 300, 465, 466, & 500 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0227-U2 0300-U2 0465-U2 0466-U2 0500-U2 227 Vertical Cable Chase, El.

128'-0" 300 Vertical Cable Chase, El 141 ft 0 in.

465 Vertical Cable Chase, El.

155'-0" 466 Vertical Cable Chase, El.

155'-0" 500 Vertical Cable Chase, El.

168'-6" R, S R, S R, S R, S R, S R, S None None None R

R R

R R

R Detection System, 1A-23: R S One Hour Rated Cable: R S Water Suppression, 1A-23: R S Detection System, 1A-23: R S One Hour Rated Cable: R S Water Suppression, 1A-23: R S Detection System, 1A-23: R Water Suppression, 1A-23: R Detection System, 1A-23: R Water Suppression, 1A-23: R Detection System, 1A-23: R Water Suppression, 1A-23: R Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:48 Page: 29 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-014 - Computer Room & Duct Chase Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0201 201 Computer Room E

None None Gaseous Suppression, 1A-33: E 0255 255 Duct Chase None None None None Fire Area ID:

1-015 - Communication Room Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 0202 202 Communication Room E, R, D E, R, D E

Detection System, 1A-34: E R D Gaseous Suppression, 1A-34: E R D Restricted transient controls: E Fire Area ID:

1-016 - Aux Building Battery Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0212 212 Battery Room None E

E Detection System, 1A-32: E Restricted transient controls: E Fire Area ID:

1-017 - Aux Building Battery Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0214 214 Battery Room None E

E Detection System, 1A-32: E Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:48 Page: 30 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-018 - Aux Building DC Switchgear Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R, D Modifications: R D 0224 224 dc Switchgear Room None R, D None Detection System, 1A-32: R D Fire Area ID:

1-019 - Aux Building DC Switchgear Room Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 0226 226 dc Switchgear Room None E, R, D E

Detection System, 1A-32: E R D Restricted transient controls: E Fire Area ID:

1-020 - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R, D Modifications: R D 0210 0211 0213 0225 0228 0234 0244 210 Corridor 211 Corridor 213 Battery Service Room 225 Battery Charger Room 228 Corridor 234 Hallway 244 Roof of Battery 1 B Room, El.

1311-0" E, R, D R, D E, R, D None E, R, D E, R, D R, D E, R, D R, D E, R, D E, R, D E, R, D E, R, D R, D E

None E

E E

E None Detection System, 1A-36: E R D Restricted transient controls: E Water Suppression, 1A-36: E R D Detection System, 1A-36: R D Water Suppression, 1A-36: R D Detection System, 1A-32: E R D Restricted transient controls: E Water Suppression, 1A-36: E R D Detection System, 1A-32: E R D Restricted transient controls: E Detection System, 1A-36: E R D Restricted transient controls: E Water Suppression, 1A-36: E R D Detection System, 1A-36: E R D Restricted transient controls: E Water Suppression, 1A-36: E R D Detection System, 1A-36: R D Water Suppression, 1A-36: R D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:48 Page: 31 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-020 - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0245 245 Roof of Battery 1A Room, El.

R, D R, D None Detection System, 1A-36: R D 131'-0" Water Suppression, 1A-36: R D Fire Area ID:

1-021-Ul -Aux Building Switchgear Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 0229-U1 229 Switchgear Room E, R, D E, R, D E

Detection System, 1A-i104: E R D Gaseous Suppression, 1A-28: E R D Gaseous Suppression, 1A-29: E R D Restricted transient controls: E 0233-Ul 233 Switchgear Room E, R, D E, R, D E

Detection System, 1A-1 04: E R D Gaseous Suppression, 1A-28: E R D Gaseous Suppression, 1A-30: E R D Restricted transient controls: E Fire Area ID:

1-021-U2 - Aux Building Switchgear Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 0229-U2 0233-U2 Area Wide 229 Switchgear Room 233 Switchgear Room None E, R, D E, R, D None E, R, D E, R, D R

E E

Procedures/Recovery Actions: R Detection System, 1A-I 04: E R D Gaseous Suppression, 1A-28: E R D Gaseous Suppression, 1A-29: E R D Restricted transient controls: E Detection System, 1A-1 04: E R D Gaseous Suppression, 1A-28: E R D Gaseous Suppression, 1A-30: E R D Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:48 Page: 32 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-023-Ul - Aux Building Switchgear Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 0235-Ul 235 Switchgear Room E, R, D E, R, D E

Detection System, 1A-31: E R D Gaseous Suppression, 1A-31: E R D Restricted transient controls: E Fire Area ID:

1-023-U2 - Aux Building Switchgear Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0235-U2 235 Switchgear Room E, R E, R E

Detection System, 1A-31: E R Gaseous Suppression, 1A-31: E R Restricted transient controls: E Fire Area ID:

1-030-Ul - Aux Building Cable Chase, Rooms 249 & 252 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide 0249-Ul 0252-U1 249 Cable Chase 252 Cable Chase None D

E, D None R, D E, R, D R

None None Modifications: R Procedures/Recovery Actions: R Detection System, 1A-61: R D Water Suppression, 1A-61: D Detection System, 1A-61: E R D Water Suppression, 1A-61: E D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:49 Page: 33 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-030-U2 - Aux Building Cable Chase, Rooms 249 & 252 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0249-U2 249 Cable Chase None R

None Detection System, 1A-61: R 0252-U2 252 Cable Chase E

E, R None Detection System, 1A-61: E R Water Suppression, 1A-61: E Fire Area ID:

1-031-Ul - Aux Building Cable Chase, Rooms 250 & 251 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 0250-Ul 250 Cable Chase E, D E, R, D E

Detection System, 1A-60: E R D Restricted transient controls: E Water Suppression, 1A-60: E D 0251-Ul 251 Cable Chase E, D E, R, D None Detection System, 1A-60: E R D Water Suppression, 1A-60: E D Fire Area ID:

1-031-U2 - Aux Building Cable Chase, Rooms 250 & 251 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 0250-U2 0251-U2 250 Cable Chase 251 Cable Chase E

E E, R E, R E

None Detection System, 1A-60: E R Restricted transient controls: E Water Suppression, 1A-60: E Detection System, 1A-60: E R Water Suppression, 1A-60: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:49 Page: 34 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-034 - Train B Electrical Pen Room & Filtration System Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 0317 317 Penetration Room Filtration None E, R E

Detection System, 1A-48: E R System Equipment Room Restricted transient controls: E 0334 334 Electrical Penetration Room, None E, R, D E

Detection System, 1A-45: E R D Train B Detection System, 1A-46: E R D Restricted transient controls: E Fire Area ID:

1-035 - Train A Electrical Pen Rooms Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0333 333 Electrical Penetration Room, None E, R, D E, D Detection System, 1A-47: E R D Train A Restricted transient controls: E D 0347 347 Electrical Penetration Room None R, D D

Detection System, 1A-47: R D Restricted transient controls: D Fire Area ID:

1-039 - Fuel Storage & Storage Rack Pits Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0349 0350 0459 349 Pits for New Fuel Storage Racks 350 Pits for New Fuel Storage Racks 459 New Fuel Storage Room None None None None None None None None None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:49 Page: 35 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-040-Ul - Cable Spreading Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R, D Modifications: R D Procedures/Recovery Actions: D 0318-Ul 318 Cable Spreading Room E, R, D E, R, D E, D Detection System, 1A-43: E R D Restricted transient controls: E D Water Suppression, 1A-43: E R D Fire Area ID:

1-040-U2 - Cable Spreading Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 0318-U2 318 Cable Spreading Room E, R, D E, R, D E, D Detection System, 1A-43: E R D Restricted transient controls: E D Water Suppression, 1A-43: E R D Fire Area ID:

1-041-Ul - Train A Switchgear & Load Center Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide 0335-U1 335 Load Center Room, Train A 343 Load Center Room, Train A None E, R, D E, R, D None E, R, D E, R, D R

E, R E, R Modifications: R Procedures/Recovery Actions: R Detection System, 1A-39: E R D Detection System, 1A-40: E R D Detection System, 1A-41: E R D Gaseous Suppression, 1A-40: E R D Gaseous Suppression, 1A-41: E R D One Hour Rated Cable: R Restricted transient controls: E Detection System, 1A-39: E R D Detection System, 1A-40: E R D Detection System, 1A-42: E R D Gaseous Suppression, 1A-40: E R D Gaseous Suppression, 1A-42: E R D One Hour Rated Cable: R Restricted transient controls: E 0343-U1 Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:49 Page: 36 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-041-U1 - Train A Switchgear & Load Center Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0346-Ul 346 Switchgear and M-G Set E, R, D E, R, D E

Detection System, 1A-37: E R D Room Detection System, 1A-38: E R D Detection System, 1A-39: E R D Gaseous Suppression, 1A-37: E R D Gaseous Suppression, 1A-38: E R D Restricted transient controls: E Fire Area ID:

1-041-U2 - Train A Switchgear & Load Center Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0335-U2 0343-U2 335 Load Center Room, Train A 343 Load Center Room, Train A 346 Switchgear and M-G Set Room E, R, D E, R, D E, R, D E, R, D E, R, D E, R, D E, R E, R E

Detection System, 1A-39: E R D Detection System, 1A-40: E R D Detection System, 1A-41: E R D Gaseous Suppression, 1A-40: E R D Gaseous Suppression, 1A-41: E R D One Hour Rated Cable: R Restricted transient controls: E Detection System, 1A-39: E R D Detection System, 1A-40: E R D Detection System, 1A-42: E R D Gaseous Suppression, 1A-40: E R D Gaseous Suppression, 1A-42: E R D One Hour Rated Cable: R Restricted transient controls: E Detection System, 1A-37: E R D Detection System, 1A-38: E R D Detection System, 1A-39: E R D Gaseous Suppression, 1A-37: E R D Gaseous Suppression, 1A-38: E R D Restricted transient controls: E 0346-U2 Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:49 Page: 37 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-042-Ul - Aux Building Hallways & Corridor Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R, D Modifications: R D 0319-Ul 319 Corridor - Train B E, R, D, S E, R, D, S E, R, S Detection System, 1A-59: E R D S One Hour Rated Cable: R S Restricted transient controls: E Water Suppression, 1A-59: E R D S 0339-Ul 339 Corridor - Train A E, R, D, S E, R, D, S E, R, S Detection System, 1A-59: E R D S One Hour Rated Cable: R S Restricted transient controls: E Water Suppression, 1A-59: E R D S 0345-Ul 345 Hallway - Train A E, R, D E, R, D D

Detection System, 1A-59: E R D Restricted transient controls: D Water Suppression, 1A-59: E R D Fire Area ID:

1-042-U2 - Aux Building Hallways & Corridor Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 0319-U2 0339-U2 0345-U2 Area Wide 319 Corridor - Train B 339 Corridor - Train A 345 Hallway - Train A None E, R, D, S E, R, D, S E, R, D None E, R, D, S E, R, D, S E, R, D R

E, R, S E, R, S None Procedures/Recovery Actions: R Detection System, 1A-59: E R D S One Hour Rated Cable: R S Restricted transient controls: E Water Suppression, 1A-59: E R D S Detection System, 1A-59: E R D S One Hour Rated Cable: R S Restricted transient controls: E Water Suppression, 1A-59: E R D S Detection System, 1A-59: E R D Water Suppression, 1A-59: E R D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:50 Page: 38 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-053 - Aux Building Elevator Machine Room No. 2 Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0502 502 Elevator Machine Room No.

None None None None 2

Fire Area ID:

1-054 - Aux Building Elevator Machine Room No. 1 and Elevator No. 1 Shaft Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0503 503 Elevator Machine Room No.

None None None None 1 and Elevator No. 1 Shaft Fire Area ID:

1-055 - Containment Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-CTMT Containment, Unit 1 None D

D Detection System, 1A-22: D RCP Oil Collection System: D Fire Area ID:

1-075-Ul - Unit 1 Cable Tunnel - Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None E, D None None R, D None Modifications: R D Procedures/Recovery Actions: R Water Suppression, 1D-77: E D 1-075-U1 Unit 1 Cable Tunnel - Train A Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:50 Page: 39 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-075-U2 - Unit 1 Cable Tunnel - Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 1-075-U2 Unit 1 Cable Tunnel - Train A E, D None None Water Suppression, 1 D-77: E D Fire Area ID:

1-076-Ul - Unit 1 Cable Tunnel - Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 1-076-Ul Unit 1 Cable Tunnel - Train B E, D None E

Restricted transient controls: E Water Suppression, 1D-98: E D Fire Area ID:

1-076-U2 - Unit 1 Cable Tunnel - Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-076-U2 Unit 1 Cable Tunnel - Train B E

None E

Restricted transient controls: E Water Suppression, 1 D-98: E Fire Area ID:

1-077 - Condensate Storage Tank Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-CST Condensate Storage Tank None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:50 Page: 40 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-078 - Reactor Makeup Storage Tank Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-RWMT Reactor Makeup Storage Tank None None None None Fire Area ID:

1-079 - Refueling Water Storage Tank Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-RWST Refueling Water Storage Tank None None None None Fire Area ID:

1-080 - Low Voltage Switchyard - Unit 1 Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-080A Main Transformer No.3 E

None E

Curbs: E 1-080B 1-080C 1-080D 1-080E 1-080F 1-080G 1-080H 1-080J 1-080K Main Transformer No.2 Main Transformer No. 1 Main Transformer (Spare)

Unit Aux Transformer No. 1A Unit Aux Transformer (Spare Cubicle)

Startup Aux Transformer No. 1A Startup Aux Transformer No. 1B Startup Aux Transformer (Spare)

Low Voltage Switchyard -

General Area, Unit 1 E

E E

None E

E E

None None None None None None None None None Water Suppression, 1TR-64: E Curbs: E Water Suppression, 1TR-64: E Combustibles and flammable liquid control: E Curbs: E Water Suppression, 1TR-66: E Combustibles and flammable liquid control: E Curbs: E Water Suppression, 1TR-66: E Combustibles and flammable liquid control: E Curbs: E Combustibles and flammable liquid control: E Curbs: E Water Suppression, 1TR-68: E Combustibles and flammable liquid control: E Curbs: E Water Suppression, 1TR-67: E Combustibles and flammable liquid control: E Curbs: E Water Suppression, 1TR-69: E Combustibles and flammable liquid control: E Combustibles and flammable liquid control: E Curbs: E None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:50 Page: 41 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-081-Ul - Turbine Building Battery Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 1-081-Ul Turbine Building Battery Room None R

None Detection System, 1T-4: R Fire Area ID:

1-081-U2 - Turbine Building Battery Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-081-U2 Turbine Building Battery Room None R

None Detection System, 1T-4: R Fire Area ID:

1-082 - Turbine Building Lube Oil Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-082 Lube Oil Storage Room None None None None Fire Area ID:

1-083 - Turbine Building Oil Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-083 Oil Storage Room None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:51 Page: 42 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-086 - Turbine Building Auxiliary Steam Generator Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-086 Auxiliary Steam Generator None None None None Fire Area ID:

1-090 - Aux Building Combustible Storage & Filter Unit Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0107 107 Combustible Storage/Filter E

E E

Detection System, IA-132: E Unit Room Restricted transient controls: E Water Suppression, 1A-1 32: E Fire Area ID:

1-092 - Drumming Station & Storage & Combustible Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0420 420 Drum Storage/Combustible None None None None Storage Room 0421 421 Drumming None None None None Station/Combustible Storage Room Fire Area ID:

1-094 - Aux Building Combustible Storage Room Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0167 167 Combustible Storage Room D

R, D None Detection System, 1A-27: R D Water Suppression, 1A-21: D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:51 Page: 43 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-095 - Aux Building Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0171 171 Storage Room/Combustible E

E None Detection System, 1A-118: E Storage Room Water Suppression, 1A-118: E Fire Area ID:

1-096 - Aux Building Combustible Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0179 179 Combustible Storage Room E

E None Detection System, 1A-118: E Water Suppression, 1A-118: E Fire Area ID:

1-097 - Filter Hatch Room & Combustible Storage Area Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0404 404 Filter Hatch None None None None Room/Combustible Storage Area Fire Area ID:

1-098 - Caskwash Storage & Combustible Storage Area Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 0447 447 Caskwash Storage None None None None Area/Combustible Storage Area Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:51 Page: 44 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-DU-DGRWIS-A - Diesel Building to RWIS Ductbank, Unit 1, Train A Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-DU-DGRWIS-A Diesel Building to RWIS None None None None Ductbank, Unit 1, Train A Fire Area ID:

1-DU-DGRWIS-B - Diesel Building to RWIS Ductbank, Unit 1, Train B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-DU-DGRWIS-B Diesel Building to RWIS None None None None Ductbank, Unit 1, Train B Fire Area ID:

1-DU-DGSWIS-A-U1 - Diesel Building to SWIS Ductbank, Unit 1, Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None D

Modifications: D 1-DU-DGSWIS-A-U1 Diesel Building to SWIS None None None None Ductbank, Unit 1, Train A Fire Area ID:

1-DU-DGSWIS-A-U2 - Diesel Building to SWIS Ductbank, Unit 1, Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 1 -DU-DGSWIS-A-U2 Area Wide Diesel Building to SWIS Ductbank, Unit 1, Train A None None None None R

None Procedures/Recovery Actions: R None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:51 Page: 45 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-DU-DGSWIS-B-U1 - Diesel Building to SWIS Ductbank, Unit 1, Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 1-DU-DGSWIS-B-U1 Diesel Building to SWIS None None None None Ductbank, Unit 1, Train B Fire Area ID:

1-DU-DGSWIS-B-U2 - Diesel Building to SWIS Ductbank, Unit 1, Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-DU-DGSWIS-B-U2 Diesel Building to SWIS None None None None Ductbank, Unit 1, Train B Fire Area ID:

1-DU-DGVB-A - Diesel Building to Valve Box Ductbanks, Train A Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-DU-DGVB-A Diesel Building to Valve Box None None None None Ductbanks, Train A Fire Area ID:

1-DU-DGVB-B - Diesel Building to Valve Box Ductbanks, Train B Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-DU-DGVB-B Diesel Building to Valve Box Ductbanks, Train B None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:51 Page: 46 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1 -EMBED-AB - Aux Building Embedded Conduit Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-EMBED-AB Embedded Conduit, Auxiliary None None None None Building, Unit 1 Fire Area ID:

1-S01 - Stairwell No. 1 Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-S01 Stairwell No. 1 None E

E Detection System, 1A-51: E Restricted transient controls: E Fire Area ID:

1-S02 - Stairwell No. 2 Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-S02 Stairwell No. 2 None E

E, R, S Detection System, 1A-108: E Restricted transient controls: E Three Hour Rated

Enclosure:

R S Fire Area ID:

1-S08 - Stairwell No. 8 Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-S08 Stairwell No. 8 None None E

Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:52 Page: 47 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

1-S10 - Stairwell No. 10 Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details 1-$10 Stairwell No. 10 None None E

Restricted transient controls: E Fire Area ID:

1 -SVB1 -A - Service Water Valve Box, 1 -SVB1, Train A Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 1 -SVB1 -A Service Water Valve Box, 1 -

None None None None SVB1, Train A Fire Area ID:

1-SVB1-B - Service Water Valve Box, 1-SVB1, Train B Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 1-SVB1-B Service Water Valve Box, 1 -

None None None None SVB1, Train B Fire Area ID:

1-SVB2-A - Service Water Valve Box, 1-SVB2, Train A Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 1 -SVB2-A Area Wide Service Water Valve Box, 1 -

SVB2, Train A None None None None R

None Procedures/Recovery Actions: R None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:52 Page: 48 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-SVB2-B - Service Water Valve Box, 1-SVB2, Train B Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 1 -SVB2-B Service Water Valve Box, 1-None None None None SVB2, Train B Fire Area ID:

1 -SVB3-A - Service Water Valve Box, 1 -SVB3, Train A Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details 1-SVB3-A Service Water Valve Box, 1-None None None None SVB3, Train A Fire Area ID:

1 -SVB3-B - Service Water Valve Box, 1 -SVB3, Train B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1 -SVB3-B Service Water Valve Box, 1-None None None None SVB3, Train B Fire Area ID:

1-SVB4-A - Service Water Valve Box, 1 -SVB4, Train A Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 1-SVB4-A Service Water Valve Box, 1-SVB4, Train A None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:52 Page: 49 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1 -SVB4-B - Service Water Valve Box, 1 -SVB4, Train B Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 1 -SVB4-B Service Water Valve Box, 1-None None None None SVB4, Train B Fire Area ID:

1-TB-U1 - Turbine Building General Area Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 1-084-U 1 1-085-U1 1-087-Ul 1-088-U1 Area Wide Turbine, SGFP, and Hw Seal Oil Conditioners & Reservoirs Turbine Building, General Area Steam Generator Feed Pumps A

& B Turbine Building Switchgear Area None D

None None R, D D

R None None None None Modifications: R Water Suppression, 1T-12B: D Water Suppression, 1T-2: D Water Suppression, 1T-3: D Water Suppression, 1 T-9: D Detection System, 1T-16A: R D Detection System, 1T-1i6B: R D Detection System, 1T-16C: R D Detection System, 1T-16D: R D Detection System, 1T-1 6E: R D Water Suppression, IT-10: D Water Suppression, 1T-12B: D Water Suppression, 1T-16C: D Water Suppression, 1T-16D: D Water Suppression, 1T-16E: D Water Suppression, 1 T-1 8: D Water Suppression, 1 T-2: D Detection System, 1T-17: D Detection System, 1T-20: D Water Suppression, 1 T-1 7: D Water Suppression, 1T-20: D Detection System, 1T-13: R D Gaseous Suppression, 1T-13: R D Gaseous Suppression, 1T-14: R D D

D R, D R, D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:52 Page: 50 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

1-TB-U2 - Turbine Building General Area Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-084-U2 Turbine, SGFP, and Hw Seal Oil D

None None Water Suppression, 1T-12B: D Conditioners & Reservoirs Water Suppression, 1T-2: D Water Suppression, 1T-3: D Water Suppression, 1T-9: D 1-085-U2 Turbine Building, General Area D

R, D None Detection System, 1T-1 6A: R D Detection System, 1T-16B: R D Detection System, 1T-16C: R D Detection System, 1T-16D: R D Detection System, 1T-1 6E: R D Water Suppression, 1T-10: D Water Suppression, 1T-12B: D Water Suppression, 1T-16C: D Water Suppression, 1T-1 6D: D Water Suppression, 1T-1 6E: D Water Suppression, 1T-18: D Water Suppression, 1T-2: D 1-087-U2 Steam Generator Feed Pumps A D

D None Detection System, 1T-17: D

& B Detection System, 1T-20: D Water Suppression, 1T-17: D Water Suppression, 1T-20: D 1-088-U2 Turbine Building Switchgear Area R, D R, D None Detection System, 1T-13: R D Gaseous Suppression, 1T-13: R D Gaseous Suppression, 1T-14: R D Fire Area ID:

2-001 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2101 2102 2103 2104 2105 2106 Area Wide None 2101 Waste Gas Decay Tank None Room 2102 Valve Compartment Room None 2103 Corridor None None R, D R, D E, R, D E

R, D R, D R

None None None E

None None Modifications: R Procedures/Recovery Actions: R Detection System, 2A-100: R D Detection System, 2A-100: R D Detection System, 2A-100: E R D Detection System, 2A-100: E Plant staff Training: E Restricted transient controls: E Detection System, 2A-100: R D Detection System, 2A-100: R D 2104 Passageway to Unit 1 None 2105 Catalytic H2 Recombiner 1A None Room 2106 Catalytic H2 Recombiner 1B Room None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:52 Page: 51 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-001 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2108 2109 2110 2111 2112 2113 2114 2115 2118 2119 2120 2121 2122 2123 2124 2125 2126 2127 2128 2129 2130 2131 2169 2183 2184 2196 2108 Waste Monitor Tank Room 2109 Waste Monitor Tank Pump Room 2110 Monitor Control Panel Room 2111 Containment Spray Pump Room 1A 2112 Access to Tendon Access Gallery 2113 Valve Encapsulation 2114 Pipe Chase 2115 Hallway 2118 Floor Drain Tank Room 2119 Waste Holdup Tank Room 2120 Corridor 2121 Floor Drain Tank Pump Room 2122 Waste Evaporator Feed Pump Room 2123 Pipe Chase 2124 Valve Encapsulation 2125 Containment Spray Pump Room 1B 2126 Pipe Chase 2127 Pipe Chase 2128 RHR Heat Exchanger Room 2129 RHR Low Head Pump Room 2130 Pipe Chase 2131 RHR Low Head Pump Room 2169 Duct and Pipe Chase 2183 Tendon Access Gallery Entrance 2184 Piping Penetration Room, El. 100'-0" 2196 Access to Tendon Access Gallery None None None None None None None None None None None None None None None None None None None None None None None None None None None R, D R, D R, D None R, D None None None R, D None R, D R, D None None E

None None None R, D None R, D None E, R, D None None None None None None None E

None None None None None None None None None None None None None None None E

None None None Detection System, 2A-1 00: R D Detection System, 2A-1 00: R D Detection System, 2A-100: R D None Detection System, 2A-100: R D None Restricted transient controls: E None Detection System, 2A-100: R D None Detection System, 2A-100: R D Detection System, 2A-1 00: R D None None Detection System, 2A-100: E None None None Detection System, 2A-100: R D None Detection System, 2A-100: R D None Detection System, 2A-100: E R D Detection System, 2A-101: R D Restricted transient controls: E Detection System, 2A-102: R D None R, D None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:53 Page: 52 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-001 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2223 2223 Piping Penetration Room, D

R, D None Detection System, 2A-45: R D El. 121'-0" Water Suppression, 2A-45: D Fire Area ID:

2-004-Ul - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2151-Ul 2152-Ul 2153-Ul 2154-Ul 2154A-U1 2155-Ul 2156-U1 2157-U1 2158-Ul 2159-Ul 2160-Ul 2161-Ul 2162-U1 2163-Ul 2164-Ul 2165-Ul 2151 Waste Gas Decay Tank Rooms 2152 Valve Compartment Room 2153 Waste Gas Compressor Room 2154 Waste Evaporator Steam Generator Room 2154A Valve Compartment Room 2155 Passageway to Unit 1 2156 Holdup Tank Room 2157 Holdup Tank Room 2158 Holdup Tank Room 2159 Recycle Evaporator Feed Pump Room 2160 Hatch Area 2161 Corridor 2162 Hallway 2163 WDS Control Panel Room 2164 Storage Room 2165 Waste Gas Decay Tank Room None None None None None E

None None None None R

R R

R R

E R

R R

R None None None None None E

None None None None E

E E

None None None Detection System, 2A-1 02: R Detection System, 2A-1 02: R Detection System, 2A-1 02: R Detection System, 2A-1 02: R Detection System, 2A-25: R Detection System, 2A-25: E Restricted transient controls: E Water Suppression, 2A-25: E Detection System, 2A-104: R Detection System, 2A-104: R Detection System, 2A-104: R Detection System, 2A-101: R Detection System, 2A-25: E R Restricted transient controls: E Water Suppression, 2A-25: E Detection System, 2A-25: E R Restricted transient controls: E Water Suppression, 2A-25: E Detection System, 2A-25: E R Restricted transient controls: E Water Suppression, 2A-25: E Detection System, 2A-25: E R Water Suppression, 2A-25: E Detection System, 2A-25: R Detection System, 2A-1 02: R E

E E

E E, R E, R E, R E, R None None R

R Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:53 Page: 53 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-004-Ul - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2166-Ul 2166 Waste Gas Decay Tank None R

None Detection System, 2A-102: R 2168-Ul 2170-U1 2175-Ul 2176-Ul 2177-Ul 2178-Ul 2180-Ul 2186-Ul 2187-Ul 2188-Ul 2203-U1 2204-Ul 2205-Ul 2206-Ul 2207-U1 2208-Ul 2209-U1 2215-Ul 2216-Ul 2217-Ul 2218-Ul 2219-Ul 2220-Ul 2221-U1 2222-U1 Room 2168 Chemical Drain Tank Room 2170 Letdown Heat Exchanger Room 2175 Hallway 2176 Secondary Spent-Resin Storage Tank Room 2177 Pump Room 2178 Filter Room 2180 Recycle Evaporator Steam Generator Room 2186 Boric Acid Area 2187 Hydro Test Pump Room 2188 Boric Acid Tank Area 2203 Waste Condenser Tanks and Pump Room 2204 Waste Evaporator Package Room 2205 Passageway to Unit 1 2206 Heat Exchanger Room 2207 Hatch Area 2208 Corridor 2209 Hallway 2215 Duct and Pipe Chase 2216 Valve Compartments Area 2217 Volume Control Tank Room 2218 Chiller Unit Room 2219 Pipe Chase 2220 Valve Compartment Room 2221 Primary Spent-Resin Storage Tank Room 2222 Corridor None None E

None None None None None None None None None None None E

None E

None None None None None None None None R

E, R E

None E, R R

R R

R None R

R E

R E, R R

E, R None None R

R None R

None None None None None None None None None None None None None E

None E

None E

None None None None None None None None Detection System, 2A-25: R Detection System, 2A-101: E R Detection System, 2A-118: E Water Suppression, 2A-118: E None Detection System, 2A-1 01: E R Detection System, 2A-1 01: R Detection System, 2A-101: R Detection System, 2A-1 01: R Detection System, 2A-1 01: R None Detection System, 2A-104: R Detection System, 2A-104: R Detection System, 2A-35: E Restricted transient controls: E Detection System, 2A-104: R Detection System, 2A-35: E R Restricted transient controls: E Water Suppression, 2A-35: E Detection System, 2A-35: R Detection System, 2A-35: E R Restricted transient controls: E Water Suppression, 2A-35: E None None Detection System, 2A-1 03: R Detection System, 2A-1 03: R None Detection System, 2A-1 03: R None Detection System, 2A-35: R R

Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:53 Page: 54 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-004-Ul - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2230-Ul 2231-Ul 2232-U1 2237-U1 2238-Ul 2239-Ul 2240-Ul 2253-Ul 2301-U1 2302-U1 2303-Ul 2304-Ul 2305-Ul 2306-Ul 2307-U1 2308-U1 2309-Ul 2310-Ul 231 1-Ul 2312-Ul 2313-Ul 2314-Ul 2315-Ul 2316-U1 2321-Ul 2230 Recycle Evaporator Package Room 2231 Sluice Pump Room 2232 Sluice Filter Room 2237 Corridor 2238 Cask Storage Area 2239 Transfer Canal 2240 Spent-Fuel Pool Room 2253 Valve Compartment 2301 Seal Water Filter Room 2302 Recycle Evaporator Feed Filter Room 2303 Reactor Coolant Filter Room 2304 Waste Monitor 2305 Seal Injection Filter Room 2306 Recycle Evaporator Feed Demineralizer Room 2307 Valve Compartment Room 2308 Waste Condensate and Monitor Tank Demineralizer Room 2309 Hatch Area 2310 Valve Compartment Room 2311 Recycle Evaporator Concentrates Filter Room 2312 Corridor 2313 Floor Drain and Laundry Tank Filter Room 2314 Waste Evaporator Feed Filter Room 2315 Recycle Waste Condenser Filter Room 2316 Passageway to Unit 1 2321 Sample Panel Room None None None None None None None None None None None None None None None None None None None None None None None R

R None R

R None R

R R

R R

R R

None R

None E, R None None None None None None None None None None None None None None None None E

None None E

None None None E

None Detection System, 2A-103: R Detection System, 2A-103: R None Detection System, 2A-103: R Detection System, 2A-107: R None Detection System, 2A-107: R Detection System, 2A-104: R Detection System, 2A-105: R Detection System, 2A-105: R Detection System, 2A-105: R Detection System, 2A-105: R Detection System, 2A-105: R None Detection System, 2A-105: R None Detection System, 2A-48: E R Restricted transient controls: E Detection System, 2A-1 05: R Detection System, 2A-1 05: R Detection System, 2A-48: E R Restricted transient controls: E Detection System, 2A-1 05: R Detection System, 2A-105: R Detection System, 2A-105: R Detection System, 2A48: E R Restricted transient controls: E Water Suppression, 2A-48: E Detection System, 2A-49: R R

R E, R R

R R

E E, R None R

Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:54 Page: 55 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-004-U1 -Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2322-U1 2323-U1 2324-U 1 2325-U1 2326-U1 2327-U1 2328-U1 2329-Ul 2330-Ul 2331-Ul 2332-U1 2340-Ul 2341-Ul 2342-Ul 2348-Ul 2351-Ul 2402-U 1 2403-U 1 2405-U 1 2406-Ul 2322 Hallway 2323 Sample Room 2324 Primary Chemistry Lab 2325 Counting Room/Spectro-photometer Lab 2326 Clean Storage Room 2327 Valve Access Area 2328 BTR Demineralizer Room 2329 Pipe Tunnel 2330 Chiller Surge Tanks Pump Room 2331 Valve Access Area 2332 MCC 1A/2A Area 2340 Demineralizer Compartment 2341 Pipe Chase 2342 Spent-Fuel Pool Pump Room 2348 Cask Wash Area 2351 Chiller Pump and Surge Tank Room 2402 Passage to Unit 1 2403 Respirator Issue Room/Combustible Storage Room 2405 Hatch Room 2406 Tool Room 2408 Hallway 2409 Hallway 2410A 600-V Load Center 2418 Auxiliary Building and Containment Purge Vent Equipment Room E

None None None None None None None None None None None None None None None None None E

E None None None None E, R R

R R

R None None None R

R R

None None R

None None None R

E, R E, R E, R R

R R

E None None None None None None None None None None None None None None None None None E

E E

None None None Detection System, 2A-48: E R Restricted transient controls: E Water Suppression, 2A-48: E Detection System, 2A-49: R Detection System, 2A-49: R Detection System, 2A-49: R Detection System, 2A-49: R None None None Detection System, 2A-48: R Detection System, 2A-48: R Detection System, 2A-48: R None None Detection System, 2A-48: R None None None Detection System, 2A-112: R Detection System, 2A-75: E R Restricted transient controls: E Water Suppression, 2A-75: E Detection System, 2A-75: E R Restricted transient controls: E Water Suppression, 2A-75: E Detection System, 2A-57: E R Restricted transient controls: E Detection System, 2A-1 07: R Detection System, 2A-57: R Detection System, 2A-57: R Detection System, 2A-107: R 2408-Ul 2409-Ul 2410A-U1 2418-U1 Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:54 Page: 56 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-004-Ul - Aux Building Compliance Basis:

Unit 1: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 2: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2419-Ul 2422-Ul 2423-Ul 2424-Ul 2425-Ul 2426-Ul 2427-U1 2429-U1 2431-U1 2445-U 1 2446-Ul 2448-Ul 2449-Ul 2450-Ul 2451-Ul 2467-Ul 2478-Ul 2504-Ul 2505-U1 2604-U 1 2605-Ul 2606-Ul 2607-Ul 2608-Ul 2609-Ul 2610-Ul 2419 Demineralizer Hatch Area 2422 Corridor 2423 Valve Compartment 2424 Demineralizer Compartments 2425 Demineralizer Compartments 2426 Demineralizer Compartments 2427 Demineralizer Compartments 2429 Containment Purge Air Equipment Room 2431 Duct/Pipe Chase 2445 Spent-Fuel Pool Heat Exchanger Room 2446 Hallway 2448 SFPC Pump Room 2449 Demineralizer Room 2450 Valve Compartment 2451 Filter Room 2467 SFP Heat Exchanger Room 2478 Motor Control Center Room 2504 Stair No. 6, Floor El. 184'-0" 2505 Spent-Fuel Pool Vent Equipment Room 2604 Passage 2605 Blowdown Pumps and Surge Tank Room 2606 Filter Room 2607 Filter Room 2608 Blowdown Heat Exchanger Room 2609 Storage Room 2610 Valve Compartment Room None None None None None None None None None None None None None None None None None None None None None None None None None None R

E, R R

None None None None E, R None R

R None None None None None R

None None E, R None E

None None None None None E

None None None None None None None None None None None E

None None None None None None Detection System, 2A-75: R Detection System, 2A-107: E R Restricted transient controls: E Detection System, 2A-107: R None None None None Detection System, 2A-108: E R Restricted transient controls: E None Detection System, 2A-107: R Detection System, 2A-107: R None None None None None Detection System, 2A-1 07: R None None Detection System, 2A-105: E R Restricted transient controls: E Detection System, 2A-105: R Detection System, 2A-105: R Detection System, 2A-105: R Detection System, 2A-1 05: R Detection System, 2A-1 05: R Detection System, 2A-105: R R

R R

R R

R Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:54 Page: 57 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide 2151-U2 2152-U2 2153-U2 2154-U2 2154A-U2 2155-U2 2156-U2 2157-U2 2158-U2 2159-U2 2160-U2 2161-U2 2162-U2 2163-U2 2164-U2 2165-U2 2166-U2 2168-U2 2170-U2 2175-U2 2176-U2 2151 Waste Gas Decay Tank Rooms 2152 Valve Compartment Room 2153 Waste Gas Compressor Room 2154 Waste Evaporator Steam Generator Room 2154A Valve Compartment Room 2155 Passageway to Unit 1 2156 Holdup Tank Room 2157 Holdup Tank Room 2158 Holdup Tank Room 2159 Recycle Evaporator Feed Pump Room 2160 Hatch Area 2161 Corridor 2162 Hallway 2163 WDS Control Panel Room 2164 Storage Room 2165 Waste Gas Decay Tank Room 2166 Waste Gas Decay Tank Room 2168 Chemical Drain Tank Room 2170 Letdown Heat Exchanger Room 2175 Hallway 2176 Secondary Spent-Resin Storage Tank Room None None None None None None E

None None None None E

E E, D E, D None None None None None None R, D R, D R, D R, D R, D E

R, D R, D R, D R, D E, R, D E, R, D E, R, D E, R, D R

None None None D

None E

None None None None E

E E

None None None None D

None None None Modifications: R Procedures/Recovery Actions: R Detection System, 2A-102: R D Detection System, 2A-102: R D Detection System, 2A-102: R D Detection System, 2A-102: R D Restricted transient controls: D Detection System, 2A-25: R D Detection System, 2A-25: E Restricted transient controls: E Water Suppression, 2A-25: E Detection System, 2A-1 04: R D Detection System, 2A-1 04: R D Detection System, 2A-104: R D Detection System, 2A-101: R D Detection System, 2A-25: E R D Restricted transient controls: E Water Suppression, 2A-25: E Detection System, 2A-25: E R D Restricted transient controls: E Water Suppression, 2A-25: E Detection System, 2A-25: E R D Restricted transient controls: E Water Suppression, 2A-25: E D Detection System, 2A-25: E R D Water Suppression, 2A-25: E D Detection System, 2A-25: R D Detection System, 2A-102: R D Detection System, 2A-102: R D Detection System, 2A-25: R D Restricted transient controls: D Detection System, 2A-101: E R D Detection System, 2A-118: E Water Suppression, 2A-118: E None R, D R, D R, D R, D E, R, D E

E None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:54 Page: 58 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2177-U2 2178-U2 2180-U2 2186-U2 2187-U2 2188-U2 2203-U2 2204-U2 2205-U2 2206-U2 2207-U2 2208-U2 2209-U2 2215-U2 2216-U2 2217-U2 2218-U2 2219-U2 2220-U2 2221 -U2 2222-U2 2230-U2 2231-U2 2232-U2 2237-U2 2238-U2 2239-U2 2240-U2 2253-U2 2177 Pump Room 2178 Filter Room 2180 Recycle Evaporator Steam Generator Room 2186 Boric Acid Area 2187 Hydro Test Pump Room 2188 Boric Acid Tank Area 2203 Waste Condenser Tanks and Pump Room 2204 Waste Evaporator Package Room 2205 Passageway to Unit 1 2206 Heat Exchanger Room 2207 Hatch Area 2208 Corridor 2209 Hallway 2215 Duct and Pipe Chase 2216 Valve Compartments Area 2217 Volume Control Tank Room 2218 Chiller Unit Room 2219 Pipe Chase 2220 Valve Compartment Room 2221 Primary Spent-Resin Storage Tank Room 2222 Corridor 2230 Recycle Evaporator Package Room 2231 Sluice Pump Room 2232 Sluice Filter Room 2237 Corridor 2238 Cask Storage Area 2239 Transfer Canal 2240 Spent-Fuel Pool Room 2253 Valve Compartment None None None None None None None None None None E

None E

None None None None None None None E, R, D R, D R, D R, D R, D None R, D R, D E

R, D E, R, D R, D E, R, D None None R, D R, D None R, D None R, D R, D R, D None R, D R, D None R, D R, D None None None None None None None None E

None E

None E

None None None None None None None None None None None None None None None None Detection System, 2A-101: E R D Detection System, 2A-101: R D Detection System, 2A-101: R D Detection System, 2A-101: R D Detection System, 2A-101: R D None Detection System, 2A-104: R D Detection System, 2A-104: R D Detection System, 2A-35: E Restricted transient controls: E Detection System, 2A-104: R D Detection System, 2A-35: E R D Restricted transient controls: E Water Suppression, 2A-35: E Detection System, 2A-35: R D Detection System, 2A-35: E R D Restricted transient controls: E Water Suppression, 2A-35: E None None Detection System, 2A-1 03: R D Detection System, 2A-103: R D None Detection System, 2A-1 03: R D None Detection System, 2A-35: R D Water Suppression, 2A-35: D Detection System, 2A-103: R D Detection System, 2A-103: R D None Detection System, 2A-1 03: R D Detection System, 2A-1 07: R D None Detection System, 2A-1 07: R D Detection System, 2A-1 04: R D D

None None None None None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:55 Page: 59 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2301 -U2 2302-U2 2303-U2 2304-U2 2305-U2 2306-U2 2307-U2 2308-U2 2309-U2 231 O-U2 2311-U2 2312-U2 2313-U2 2314-U2 2315-U2 2316-U2 2321-U2 2322-U2 2323-U2 2324-U2 2325-U2 2326-U2 2327-U2 2328-U2 2329-U2 2301 Seal Water Filter Room 2302 Recycle Evaporator Feed Filter Room 2303 Reactor Coolant Filter Room 2304 Waste Monitor 2305 Seal Injection Filter Room 2306 Recycle Evaporator Feed Demineralizer Room 2307 Valve Compartment Room 2308 Waste Condensate and Monitor Tank Demineralizer Room 2309 Hatch Area 2310 Valve Compartment Room 2311 Recycle Evaporator Concentrates Filter Room 2312 Corridor 2313 Floor Drain and Laundry Tank Filter Room 2314 Waste Evaporator Feed Filter Room 2315 Recycle Waste Condenser Filter Room 2316 Passageway to Unit 1 2321 Sample Panel Room 2322 Hallway 2323 Sample Room 2324 Primary Chemistry Lab 2325 Counting Room/Spectro-photometer Lab 2326 Clean Storage Room 2327 Valve Access Area 2328 BTR Demineralizer Room 2329 Pipe Tunnel None None None None None None None None None None None None None None None R, D R, D R, D R, D R, D None R, D None E, R, D R, D R, D E, R, D R, D R, D R, D None None None None None None None None E

None None E

None None None E

None E

None None None None None None None Detection System, 2A-105: R D Detection System, 2A-105: R D Detection System, 2A-105: R D Detection System, 2A-1 05: R D Detection System, 2A-105: R D None Detection System, 2A-105: R D None Detection System, 2A-48: E R D Restricted transient controls: E Detection System, 2A-1 05: R D Detection System, 2A-105: R D Detection System, 2A-48: E R D Restricted transient controls: E Detection System, 2A-1 05: R D Detection System, 2A-1 05: R D Detection System, 2A-105: R D Detection System, 2A-48: E R D Restricted transient controls: E Water Suppression, 2A-48: E Detection System, 2A-49: R D Detection System, 2A-48: E R D Restricted transient controls: E Water Suppression, 2A-48: E Detection System, 2A-49: R D Detection System, 2A-49: R D Detection System, 2A-49: R D Detection System, 2A-49: R D None None None E

None E

None None None None None None None E, R, D R, D E, R, D R, D R, D R, D R, D None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:55 Page: 60 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2330-U2 2330 Chiller Surge Tanks Pump None R, D None Detection System, 2A-48: R D 2331 -U2 2332-U2 2340-U2 2341 -U2 2342-U2 2348-U2 2351 -U2 2402-U2 2403-U2 2405-U2 2406-U2 2408-U2 2409-U2 241 0A-U2 2418-U2 2419-U2 2422-U2 2423-U2 2424-U2 2425-U2 2426-U2 Room 2331 Valve Access Area 2332 MCC 1A/2A Area 2340 Demineralizer Compartment 2341 Pipe Chase 2342 Spent-Fuel Pool Pump Room 2348 Cask Wash Area 2351 Chiller Pump and Surge Tank Room 2402 Passage to Unit 1 2403 Respirator Issue Room/Combustible Storage Room 2405 Hatch Room 2406 Tool Room 2408 Hallway 2409 Hallway 2410A 600-V Load Center 2418 Auxiliary Building and Containment Purge Vent Equipment Room 2419 Demineralizer Hatch Area 2422 Corridor 2423 Valve Compartment 2424 Demineralizer Compartments 2425 Demineralizer Compartments 2426 Demineralizer Compartments None None None None None None None None None E

E None None None None R, D R, D None None R, D None None None R, D E, R, D E, R, D E, R, D R, D None None None None None None None None None E

E E

D None None None E

None None None None Detection System, 2A-48: R D Detection System, 2A-48: R D None None Detection System, 2A-48: R D None None None Detection System, 2A-112: R D Detection System, 2A-75: E R D Restricted transient controls: E Water Suppression, 2A-75: E Detection System, 2A-75: E R D Restricted transient controls: E Water Suppression, 2A-75: E Detection System, 2A-57: E R D Restricted transient controls: E Detection System, 2A-1 07: R D Detection System, 2A-57: R D Restricted transient controls: D Detection System, 2A-57: R D Detection System, 2A-1 07: R D Detection System, 2A-75: R D Water Suppression, 2A-75: D Detection System, 2A-1 07: E R D Restricted transient controls: E Detection System, 2A-1 07: R D None None None R, D R, D R, D D

None None None None None E, R, D R, D None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:55 Page: 61 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-004-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2427-U2 2429-U2 2431-U2 2445-U2 2446-U2 2448-U2 2449-U2 2450-U2 2451-U2 2467-U2 2478-U2 2504-U2 2505-U2 2604-U2 2605-U2 2606-U2 2607-U2 2608-U2 2609-U2 2610-U2 2427 Demineralizer Compartments 2429 Containment Purge Air Equipment Room 2431 Duct/Pipe Chase 2445 Spent-Fuel Pool Heat Exchanger Room 2446 Hallway 2448 SFPC Pump Room 2449 Demineralizer Room 2450 Valve Compartment 2451 Filter Room 2467 SFP Heat Exchanger Room 2478 Motor Control Center Room 2504 Stair No. 6, Floor El. 184'-0" 2505 Spent-Fuel Pool Vent Equipment Room 2604 Passage 2605 Blowdown Pumps and Surge Tank Room 2606 Filter Room 2607 Filter Room 2608 Blowdown Heat Exchanger Room 2609 Storage Room 2610 Valve Compartment Room None None None None None None None None None None None None None None None None None None None None None E, R, D None R, D R, D None None None None R, D R, D None None None E, D None None None None None None None None None None None E

None None None None None None None Detection System, 2A-1 08: E R D Restricted transient controls: E D None Detection System, 2A-1 07: R D Detection System, 2A-107: R D None None None None Detection System, 2A-107: R D Detection System, 2A-107: R D None None Detection System, 2A-105: E R D Restricted transient controls: E Detection System, 2A-105: R D Detection System, 2A-1 05: R D Detection System, 2A-105: R D Detection System, 2A-105: R D Detection System, 2A-105: R D Detection System, 2A-105: R D E, R, D R, D D

D D

R, D R, D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:55 Page: 62 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

Compliance Basis:

2-005 - Aux Building Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire ion System System Protection Feature Required Fire Protection Feature ar e

None None R

Modifications: R Procedures/Recovery Actions: R rage Room None E, R, D None Detection System, 2A-101: E R D Iway E, D E, R, D E

Detection System, 2A-101: E R D Fire Zone ID (All) 2171 2172 Descripti Area Wid 2171 Stor 2172 Hall id System Details 2173 2174 2181 2182 2173 Charging/Safety Injection Pump Room 2174 Charging/Safety Injection Pump Room 2181 Charging/Safety Injection Pump Room 2182 Contaminated Storage Area None None None None E, R, D E, R, D E, R, D R, D None None None None Restricted transient controls: E Water Suppression, 2A-1 01: E D Detection System, 2A-1 01: E R D Detection System, 2A-1 01: E R D Detection System, 2A-101: E R D Detection System, 2A-1 01: R D Fire Area ID:

Compliance Basis:

2-006 - Aux Building Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire ion System System Protection Feature e

None None R, D nponent Cooling Water E, D E, R, D E

simplifying deterministic assumptions Fire Zone ID (All) 2185 Descripti Area Wid 2185 Cor Heat Exc hanger Room 2189 2190 2191 2192 2193 2194 2195 2199 2189 Plant Heating Equipment Room 2190 Motor Control Center 2E Room 2191 Auxiliary Feedwater Pump Room 2192 Auxiliary Feedwater Pump Room 2193 Auxiliary Feedwater Pump Room 2194 Equipment Room 2195 Access Hatch Room 2199 Phosphate Tank and Pump Area None E, D None None None None None None R

E, R, D R

R, D R

R None R

None E

None None None None None E

Required Fire Protection Feature and System Details Modifications: R D Detection System, 2A-119: E R D Detection System, 2A-27: E R Restricted transient controls: E Water Suppression, 2A-27: E D Detection System, 2A-62: R Detection System, 2A-62: E R D Restricted transient controls: E Water Suppression, 2A-62: E D Detection System, 2A-102: R Detection System, 2A-102: R D Detection System, 2A-102: R Detection System, 2A-62: R None Curbs: E Detection System, 2A-62: R Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:56 Page: 63 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-006 - Aux Building Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2236 2236 Duct Chase None None None None 2241 2241 Main Steam and Feed-None E, R None Detection System, 2A-106: E R water Valve Room 2242 2242 Pipe Chase None None None None 2243 2243 Pipe Chase None None None None Fire Area ID:

2-008-Ul - Aux Building Cable Chase, Room 2116 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2116-Ul 2116 Cable Chase E

E, R E

Detection System, 2A-53: E R Restricted transient controls: E Water Suppression, 2A-53: E Fire Area ID:

2-008-U2 - Aux Building Cable Chase, Room 2116 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None E, D None E, R, D R, D E

2116-U2 2116 Cable Chase Modifications: R D Procedures/Recovery Actions: R Detection System, 2A-53: E R D Restricted transient controls: E Water Suppression, 2A-53: E D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:56 Page: 64 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-009-U1 - Aux Building Cable Chase, Rooms 2117 & 2246 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2117-Ul 2117 Cable Chase E, R E, R E

Detection System, 2A-55: E R Restricted transient controls: E Water Suppression, 2A-55: E R 2246-Ul 2246 Cable Chase R

R None Detection System, 2A-55: R Water Suppression, 2A-55: R Fire Area ID:

2-009-U2 - Aux Building Cable Chase, Rooms 2117 & 2246 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 2117-U2 2117 Cable Chase E, R, D E, R, D E, D Detection System, 2A-55: E R D Restricted transient controls: E D Water Suppression, 2A-55: E R D 2246-U2 2246 Cable Chase R, D R, D 0

Detection System, 2A-55: R D Restricted transient controls: D Water Suppression, 2A-55: R D Fire Area ID:

2-012 - Hallway & Local Hot Shutdown Panel Room Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2254 Area Wide 2254 Hallway/Local Hot Shutdown Panel Room None None None E, R, D R

E, D Modifications: R Detection System, 2A-104: E R D Plant staff Training: E Restricted transient controls: E D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:56 Page: 65 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-013-Ul - Aux Building Cable Chase, Rooms 2227, 2300, 2466, & 2500 Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2227-Ul 2227 Vertical Cable Chase, El.

None None None None 128'-0" 2300-Ul 2300 Vertical Cable Chase, El.

S S

S Detection System, 2A-23: S 141'-0" One Hour Rated Cable: S Water Suppression, 2A-23: S 2466-Ul 2466 Vertical Cable Chase, El.

None None None None 1551-0" 2500-Ul 2500 Vertical Cable Chase, El.

None None None None 168'-6" Fire Area ID:

2-013-U2 - Aux Building Cable Chase, Rooms 2227, 2300, 2466, & 2500 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2227-U2 2300-U2 Area Wide 2227 Vertical Cable Chase, El.

128'-0" 2300 Vertical Cable Chase, El.

141'-0" 2466 Vertical Cable Chase, El.

155'-0" 2500 Vertical Cable Chase, El.

168'-6" None R, D R, D, S R, D R, D None R, D R, D, S R, D R, D R

None R, D, S None None Modifications: R Detection System, 2A-23: R D Water Suppression, 2A-23: R D Detection System, 2A-23: R D S Detection System, 2A-43: R D S One Hour Rated Cable: R S Restricted transient controls: D Water Suppression, 2A-23: R D S Detection System, 2A-23: R D Water Suppression, 2A-23: R D Detection System, 2A-23: R D Water Suppression, 2A-23: R D 2466-U2 2500-U2 Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:56 Page: 66 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-014 - Computer Room Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2201 2201 Computer Room R, D R, D None Detection System, 2A-33: R D Gaseous Suppression, 2A-33: R D Fire Area ID:

2-015 - Communication Room Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 2202 2202 Communication Room E, R, D E, R, D E, D Detection System, 2A-34: E R D Gaseous Suppression, 2A-34: E R D Restricted transient controls: E D Fire Area ID:

2-016 - Aux Building Battery Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2212 2212 Battery Room None None None None Fire Area ID:

2-017 - Aux Building Battery Room Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2214 2214 Battery Room None R

None Detection System, 2A-32: R Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:56 Page: 67 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-018 - Aux Building DC Switchgear Room Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R, D Modifications: R D Procedures/Recovery Actions: R 2224 2224 dc Switchgear Room None E, R, D E

Detection System, 2A-32: E R D Restricted transient controls: E Fire Area ID:

2-019 -Aux Building DC Switchgear Room Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 2226 2226 dc Switchgear Room None E, R, D E

Detection System, 2A-32: E R D Restricted transient controls: E Fire Area ID:

2-020 - Aux Building Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2210 2211 2213 2225 2228 2234 2244 Area Wide 2210 Corridor 2211 Corridor 2213 Battery Service Room 2225 Battery Charger Room 2228 Corridor 2234 Hallway 2244 Roof of Battery 2B Room, El. 131'-0" None E, R, D R, D R, D None None E, R, D R, D None E, R, D R, D R, D E, R, D E, R, D E, R, D R, D R, D E

None None E, D E, D E

None Modifications: R D Detection System, 2A-36: E R D Restricted transient controls: E Water Suppression, 2A-36: E R D Detection System, 2A-36: R D Water Suppression, 2A-36: R D Detection System, 2A-32: R D Water Suppression, 2A-36: R D Detection System, 2A-32: E R D Restricted transient controls: E D Detection System, 2A-36: E R D Restricted transient controls: E D Detection System, 2A-36: E R D Restricted transient controls: E Water Suppression, 2A-36: E R D Detection System, 2A-36: R D Water Suppression, 2A-36: R D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:56 Page: 68 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-020 - Aux Building Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2245 2245 Roof of Battery 2A Room, R, D R, D None Detection System, 2A-36: R D El. 131'-0" Water Suppression, 2A-36: R D Fire Area ID:

2-021-U 1 - Aux Building Switchgear Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2229-U 1 2229 Switchgear Room R

R None Detection System, 2A-104: R Gaseous Suppression, 2A-28: R 2233-Ul 2233 Switchgear Room E, R E, R E

Detection System, 2A-104: E R Gaseous Suppression, 2A-28: E R Gaseous Suppression, 2A-30: E R Restricted transient controls: E Fire Area ID:

2-021-U2 - Aux Building Switchgear Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None 2229-U2 2233-U2 2229 Switchgear Room 2233 Switchgear Room R, D E, R, D None R, D E, R, D R

None E

Modifications: R Procedures/Recovery Actions: R Detection System, 2A-1 04: R D Gaseous Suppression, 2A-28: R D Gaseous Suppression, 2A-29: R D Detection System, 2A-104: E R D Gaseous Suppression, 2A-28: E R D Gaseous Suppression, 2A-30: E R D Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08127/2014 12:34:57 Page: 69 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-023-Ul - Aux Building Switchgear Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2235-Ul 2235 Switchgear Room E, R E, R E

Detection System, 2A-31: E R Gaseous Suppression, 2A-31: E R Restricted transient controls: E Fire Area ID:

2-023-U2 - Aux Building Switchgear Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 2235-U2 2235 Switchgear Room E, R E, R E

Detection System, 2A-31: E R Gaseous Suppression, 2A-31: E R Restricted transient controls: E Fire Area ID:

2-030-Ul - Aux Building Cable Chase, Rooms 2249 & 2252 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2249-Ul 2249 Cable Chase E

E, R, D E

Detection System, 2A-60: E R D Restricted transient controls: E Water Suppression, 2A-60: E 2252-Ul 2252 Cable Chase E

E, R, D None Detection System, 2A-60: E R D Water Suppression, 2A-60: E Fire Area ID:

2-030-U2 - Aux Building Cable Chase, Rooms 2249 & 2252 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide 2249-U2 2252-U2 2249 Cable Chase 2252 Cable Chase None E, D E. D None E, R, D E, R, D R

E None Modifications: R Procedures/Recovery Actions: R Detection System, 2A-60: E R D Restricted transient controls: E Water Suppression, 2A-60: E D Detection System, 2A-60: E R D Water Suppression, 2A-60: E D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:57 Page: 70 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-031-Ul - Aux Building Cable Chase, Rooms 2250 & 2251 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2250-Ul 2250 Cable Chase None R, D None Detection System, 2A-61: R D 2251-Ul 2251 Cable Chase E

E, R, D None Detection System, 2A-61: E R D Water Suppression, 2A-61: E Fire Area ID:

2-031-U2 - Aux Building Cable Chase, Rooms 2250 & 2251 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 2250-U2 2250 Cable Chase D

R, D None Detection System, 2A-61: R D Water Suppression, 2A-61: D 2251-U2 2251 Cable Chase E, D E, R, D None Detection System, 2A-61: E R D Water Suppression, 2A-61: E D Fire Area ID:

2-034 - Train B Electrical Pen Room & Filtration System Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2317 2334 Area Wide 2317 Penetration Room Filtration System Equipment Room 2334 Electrical Penetration Room, Train B None None None None R

E, R, D R

None E

Modifications: R Detection System, 2A-48: R Detection System, 2A-46: E R D Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:57 Page: 71 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-035 - Train A Electrical Pen Rooms Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 2333 2333 Electrical Penetration None E, R, D E, D Detection System, 2A-47: E R D Room, Train A Restricted transient controls: E D 2347 2347 Electrical Penetration Room None R, D D

Detection System, 2A-47: R D Restricted transient controls: D Fire Area ID:

2-039 - Fuel Storage & Storage Rack Pits Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2349 2349 Pits for New Fuel Storage None None None None Racks 2350 2350 Pits for New Fuel Storage None None None None Racks 2459 2459 New Fuel Storage Room None R

None Detection System, 2A-1 07: R Fire Area ID:

2-040-Ul - Cable Spreading Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2318-Ul Area Wide 2318 Cable Spreading Room None E, R None E, R, D R

E, D Modifications: R Detection System, 2A-43: E R D Restricted transient controls: E D Water Suppression, 2A-43: E R Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:57 Page: 72 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-040-U2 - Cable Spreading Room Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R, D Modifications: R D Procedures/Recovery Actions: D 2318-U2 2318 Cable Spreading Room E, R, D E, R, D E, D Detection System, 2A-43: E R D Restricted transient controls: E D Water Suppression, 2A-43: E R D Fire Area ID:

2-041-U 1 - Train A Switchgear & Load Center Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2335-U1 2335 Load Center Room, Train A E, R, D E, R, D E, R Detection System, 2A-39: E R D Gaseous Suppression, 2A-40: E R D Gaseous Suppression, 2A-41: E R D One Hour Rated Cable: R Restricted transient controls: E 2343-Ul 2343 Load Center Room, Train A E, R, D E, R, D E

Detection System, 2A-39: E R D Gaseous Suppression, 2A-40: E R D Gaseous Suppression, 2A-42: E R D Restricted transient controls: E 2346-U1 2346 Switchgear and M-G Set E, R, D E, R, D E

Detection System, 2A-39: E R D Room Gaseous Suppression, 2A-37: E R D Gaseous Suppression, 2A-38: E R D Restricted transient controls: E Fire Area ID:

2-041-U2 - Train A Switchgear & Load Center Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R, D Modifications: R 0 Procedures/Recovery Actions: R 2335-U2 2335 Load Center Room, Train A E, R, D 2343 Load Center Room, Train A E, R, D E, R, D E, R, D E, R E

Detection System, 2A-39: E R D Gaseous Suppression, 2A-40: E R D Gaseous Suppression, 2A-41: E R D One Hour Rated Cable: R Restricted transient controls: E Detection System, 2A-39: E R D Gaseous Suppression, 2A-40: E R D Gaseous Suppression, 2A-42: R D Restricted transient controls: E 2343-U2 Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:57 Page: 73 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-041-U2 - Train A Switchgear & Load Center Rooms Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2346-U2 2346 Switchgear and M-G Set E, R, D E, R, D E, D Detection System, 2A-39: E R D Room Gaseous Suppression, 2A-37: E R D Gaseous Suppression, 2A-38: E R D Restricted transient controls: E D Fire Area ID:

2-042-U1 - Aux Building Hallways & Corridor Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2319-U1 2319 Corridor - Train B E, R, S E, R, S E, R, S Detection System, 2A-59: E R S One Hour Rated Cable: R S Restricted transient controls: E Water Suppression, 2A-59: E R S 2339-U1 2339 Corridor - Train A E, R, S E, R, S E, R, S Detection System, 2A-59: E R S One Hour Rated Cable: R S Restricted transient controls: E Water Suppression, 2A-59: E R S 2345-Ul 2345 Hallway - Train A E, R E, R None Detection System, 2A-59: E R Water Suppression, 2A-59: E R Fire Area ID:

2-042-U2 - Aux Building Hallways & Corridor Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2319-U2 2339-U2 2345-U2 Area Wide 2319 Corridor - Train B 2339 Corridor - Train A 2345 Hallway - Train A None E, R, D E, R, D E, R, D None R, D R, D E, R, D R

E, R E, R D

Modifications: R Detection System, 2A-59: R D One Hour Rated Cable: R Restricted transient controls: E Water Suppression, 2A-59: E R D Detection System, 2A-59: R D One Hour Rated Cable: R Restricted transient controls: E Water Suppression, 2A-59: E R D Detection System, 2A-59: E R D Restricted transient controls: D Water Suppression, 2A-59: E R D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:58 Page: 74 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-043-Ul - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-S12-U1 Stairwell No. 12 None None None None 2452-Ul 2452 Storage Area E

E, R E

Detection System, 2A-51: E R Restricted transient controls: E Water Suppression, 2A-52: E 2462-Ul 2462 Nonradioactive Ventilation None R

None Detection System, 2A-51: R Equipment Room 2463-Ul 2463 Storage Room None R

None Detection System, 2A-51: R 2464-Ul 2464 Storage Room None R

None Detection System, 2A-51: R 2502-Ul 2502 Unassigned Area None R

None Detection System, 2A-110: R 2506-Ul 2506 Component Cooling Surge None None None None Tank Room Fire Area ID:

2-043-U2 - Aux Building Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2-$12-U2 2452-U2 2462-U2 2463-U2 2464-U2 2502-U2 2506-U2 Area Wide Stairwell No. 12 2452 Storage Area 2462 Nonradioactive Ventilation Equipment Room 2463 Storage Room 2464 Storage Room 2502 Unassigned Area 2506 Component Cooling Surge Tank Room None None E, D None None E, R, D D

None None None None R, D R, D R, D R, D D

D None E

None None None None None Modifications: D None Detection System, 2A-51: E R D Restricted transient controls: E Water Suppression, 2A-52: E D Detection System, 2A-51: R D Water Suppression, 2A-51: D Detection System, 2A-51: R D Detection System, 2A-51: R D Detection System, 2A-1 10: R D Detection System, 2A-110: D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:58 Page: 75 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-054 - Aux Building Elevator Machine Room No. 4 and Elevator No. 1 Shaft Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2503 2503 Elevator Machine Room No.

None R

None Detection System, 2A-110: R 4 and Elevator No. 1 Shaft Fire Area ID:

2-055 - Containment Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-CTMT Containment, Unit 2 None D

D Detection System, 2A-22: D RCP Oil Collection System: D Fire Area ID:

2-075-Ul - Unit 2 Cable Tunnel - Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-075-Ul Unit 2 Cable Tunnel - Train A E

None E

Restricted transient controls: E Water Suppression, 2D-77: E Fire Area ID:

2-075-U2 - Unit 2 Cable Tunnel - Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2-075-U2 Area Wide None E, D None None R, D E

Modifications: R D Procedures/Recovery Actions: R Restricted transient controls: E Water Suppression, 2D-77: E D Unit 2 Cable Tunnel - Train A Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:58 Page: 76 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-076-Ul - Unit 2 Cable Tunnel - Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-076-Ul Unit 2 Cable Tunnel - Train B E

None E

Restricted transient controls: E Water Suppression, 2D-98: E Fire Area ID:

2-076-U2 - Unit 2 Cable Tunnel - Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R Procedures/Recovery Actions: R 2-076-U2 Unit 2 Cable Tunnel - Train B E, D None E

Restricted transient controls: E Water Suppression, 2D-98: E D Fire Area ID:

2-077 - Condensate Storage Tank Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-CST Condensate Storage Tank None None None None Fire Area ID:

2-078 - Reactor Makeup Storage Tank Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-RWMT Reactor Makeup Storage Tank None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:58 Page: 77 of 91

Fire Area ID:

Compliance Basis:

Fire Zone ID 2-RWST Fire Area ID:

Compliance Basis:

Fire Zone ID 2-080A 2-080B 2-080C 2-080D 2-080E 2-080F 2-080G 2-080H 2-080K NFPA 805 Ch 4 Required FP SystemslFeatures 2-079 - Refueling Water Storage Tank Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Description System System Protection Feature Required Fire Protection Feature an Refueling Water Storage Tank None None None None 2-080 - Low Voltage Switchyard - Unit 2 NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Description System System Protection Feature Required Fire Protection Feature an Main Transformer No. 3 E

None E

Combustibles and flammable liquid co Curbs: E Water Suppression, 2TR-64: E Main Transformer No. 2 E

None E

Curbs: E Water Suppression, 2TR-66: E Main Transformer No. 1 E

None E

Combustibles and flammable liquid co Curbs: E Water Suppression, 2TR-66: E Main Transformer (Spare)

E None E

Combustibles and flammable liquid co Curbs: E Water Suppression, 2TR-64: E Unit Aux Transformer (Spare None None E

Combustibles and flammable liquid co Cubicle)

Curbs: E Unit Aux Transformer 2B E

None E

Combustibles and flammable liquid co Curbs: E Water Suppression, 2TR-67: E Startup Aux Transformer No. 2B E

None E

Combustibles and flammable liquid co Curbs: E Water Suppression, 2TR-69: E Startup Aux Transformer No. 2A E

None E

Combustibles and flammable liquid co Curbs: E Water Suppression, 2TR-65: E Low Voltage Switchyard -

None None E

Combustibles and flammable liquid co id System Details id System Details ntrol: E ntrol: E ntrol: E ntrol: E ntrol: E ntrol: E ntrol: E ntrol: E General Area, Unit 2 Curbs: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:59 Page: 78 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-081 - Turbine Building Battery Room Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Modifications: R 2-081 Turbine Building Battery Room None R, D None Detection System, 2T-4: R D Fire Area ID:

2-089 - Lube Oil & Combustible Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2150 2150 Lube Oil None None None None Storage/Combustible Storage Room Fire Area ID:

2-090 - Aux Building Combustible Storage & Filter Unit Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2107 2107 Combustible Storage/Filter None None None None Unit Room Fire Area ID:

2-092 - Drumming Station & Storage & Combustible Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2420 2421 2420 Drum Storage/Combustible None Storage Room 2421 Drumming None Station/Combustible Storage Room None None None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:59 Page: 79 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

2-094 - Aux Building Combustible Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required.

Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2167 2167 Combustible Storage Room None None None None Fire Area ID:

2-096 - Aux Building Combustible Storage Room Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2179 2179 Combustible Storage Room E

E None Detection System, 2A-101: E Water Suppression, 2A-101A: E Fire Area ID:

2-097 - Filter Hatch Room & Combustible Storage Area Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2404 2404 Filter Hatch None None None None Room/Combustible Storage Area Fire Area ID:

2-098 - Caskwash Storage & Combustible Storage Area Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2447 2447 Caskwash Storage Area Combustible Storage Area None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:59 Page: 80 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-DU-ABVB-A - Aux Building to Valve Box Ductbanks, Train A Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 2-DU-ABVB-A Aux Building to Valve Box None None None None Ductbanks, Train A Fire Area ID:

2-DU-ABVB-B - Aux Building to Valve Box Ductbanks, Train B Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 2-DU-ABVB-B Aux Building to Valve Box None None None None Ductbanks, Train B Fire Area ID:

2-DU-DGRWIS-A - Diesel Building to RWIS Ductbank, Unit 2, Train A Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-DU-DGRWIS-A Diesel Building to RWIS None None None None Ductbank, Unit 2, Train A Fire Area ID:

2-DU-DGRWIS-B - Diesel Building to RWIS Ductbank, Unit 2, Train B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-DU-DGRWIS-B Diesel Building to RWIS None None None None Ductbank, Unit 2, Train B Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:59 Page: 81 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-DU-DGSWIS-A - Diesel Building to SWIS Ductbank, Unit 2, Train A Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 2-DU-DGSWIS-A Diesel Building to SWIS None None None None Ductbank, Unit 2, Train A Fire Area ID:

2-DU-DGSWIS-B - Diesel Building to SWIS Ductbank, Unit 2, Train B Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 2-DU-DGSWIS-B Diesel Building to SWIS None None None None Ductbank, Unit 2, Train B Fire Area ID:

2-EMBED-AB - Aux Building Embedded Conduit Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-EMBED-AB Embedded Conduit, Auxiliary None None None None Building, Unit 2 Fire Area ID:

2-SO1 - Stairwell No. 1 Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-SO1 Stairwell No. 1 None E, R E

Detection System, 2A-110: E R Restricted transient controls: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:34:59 Page: 82 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-S02 - Stairwell No. 2 Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-S02 Stairwell No. 2 None E, R, D E, R, D, S Detection System, 2A-108: E R D Restricted transient controls: E D Three Hour Rated

Enclosure:

R S Fire Area ID:

2-S08 - Stairwell No. 8 Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-S08 Stairwell No. 8 None None E

Restricted transient controls: E Fire Area ID:

2-S10 - Stairwell No. 10 Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-S10 Stairwell No. 10 None None E

Restricted transient controls: E Fire Area ID:

2-SVB1 -A - Service Water Valve Box, 2-SVB1, Train A Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Suppression Required Detection Sv~qtAm Required Fire Fire Zone ID (All) 2-SVB 1 -A Description Area Wide Service Water Valve Box, 2-SVB1, Train A Sustem S

tem Protection Feature J=

None None None None R

None Required Fire Protection Feature and System Details Procedures/Recovery Actions: R None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:00 Page: 83 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-SVB1 -B - Service Water Valve Box, 2-SVB1, Train B Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 2-SVB1-B Service Water Valve Box, 2-None None None None SVB1, Train B Fire Area ID:

2-SVB2-A - Service Water Valve Box, 2-SVB2, Train A Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 2-SVB2-A Service Water Valve Box, 2-None None None None SVB2, Train A Fire Area ID:

2-SVB2-B - Service Water Valve Box, 2-SVB2, Train B Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 2-SVB2-B Service Water Valve Box, 2-None None None None SVB2, Train B Fire Area ID:

2-SVB3-A - Service Water Valve Box, 2-SVB3, Train A Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2-SVB3-A Area Wide Service Water Valve Box, 2-SVB3, Train A None None None None R

None Procedures/Recovery Actions: R None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:00 Page: 84 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-SVB3-B - Service Water Valve Box, 2-SVB3, Train B Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R 2-SVB3-B Service Water Valve Box, 2-None None None None SVB3, Train B Fire Area ID:

2-SVB4-A - Service Water Valve Box, 2-SVB4, Train A Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-SVB4-A Service Water Valve Box, 2-None None None None SVB4, Train A Fire Area ID:

2-SVB4-B - Service Water Valve Box, 2-SVB4, Train B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-SVB4-B Service Water Valve Box, 2-None None None None SVB4, Train B Fire Area ID:

2-TB - Turbine Building General Area Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All) 2-084 Area Wide Turbine, SGFP, and H2 Seal Oil Conditioners & Reservoirs None D

None None R

None Modifications: R Water Suppression, 2T-12A: D Water Suppression, 2T-12B: D Water Suppression, 2T-3: D Water Suppression, 2T-8: D Water Suppression, 2T-9: D Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:00 Page: 85 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

2-TB - Turbine Building General Area Compliance Basis:

Unit 2: NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Unit 1: NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 2-085 Turbine Building, General Area D

D None Detection System, 2T-16A: D Detection System, 2T-16B: D Detection System, 2T-16C: D Detection System, 2T-16D: D Detection System, 2T-16E: D Detection System, 2T-20: D Water Suppression, 2T-10: D Water Suppression, 2T-121: D Water Suppression, 2T-16A: D Water Suppression, 2T-16B: D Water Suppression, 2T-16C: D Water Suppression, 2T-16D: D Water Suppression, 2T-16E: D Water Suppression, 2T-2: D Water Suppression, 2T-20: D Water Suppression, 2T-5A: D Water Suppression, 2T-5B: D Water Suppression, 2T-7A: D Water Suppression, 2T-7B: D Water Suppression, 2T-7C: D 2-0851 I - El. 189'-0", Entire Floor (less None None None None Zone H) and Platform at El. 207'-

0" 2-087 Steam Generator Feed Pumps A D

D None Detection System, 2T-17: D

& B Water Suppression, 2T-17: D 2-088 Turbine Building Switchgear Area R

None None Gaseous Suppression, 2T-1"3: R Gaseous Suppression, 2T-14: R Fire Area ID:

ABRF-U1 - Control Room Air Conditioner, Unit 1 & Unit 2 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details ABRF1-U1 ABRF2-U1 Control Room Air Conditioner/Unit 1 Side Control Room Air Conditioner/Unit 2 Side None None None None None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:00 Page: 86 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

ABRF-U2 - Control Room Air Conditioner, Unit 1 & Unit 2 Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details ABRF1-U2 Control Room Air None None None None Conditioner/Unit 1 Side ABRF2-U2 Control Room Air None None None None Conditioner/Unit 2 Side Fire Area ID:

DU-DGFOST-A - Diesel Fuel Oil Storage Tank Ductbank, Train A Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DU-DGFOST-A Diesel Fuel Storage Tank None None None None Ductbank, Train A Fire Area ID:

DU-DGFOST-B - Diesel Fuel Oil Storage Tank Ductbank, Train B Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DU-DGFOST-B Diesel Fuel Storage Tank None None None None Ductbank, Train B Fire Area ID:

DU-SWISVB-A-Ul - SWIS to Valve Box Ductbank, Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DU-SWISVB-A-U1 SWIS to Valve Box Ductbank, Train A None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:00 Page: 87 of 91

NFPA 805 Ch 4 Required FP Systems/Features Fire Area ID:

DU-SWISVB-A-U2 - SWIS to Valve Box Ductbank, Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details DU-SWISVB-A-U2 SWIS to Valve Box Ductbank, None None None None Train A Fire Area ID:

DU-SWISVB-B-U1 - SWIS to Valve Box Ductbank, Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details DU-SWISVB-B-U1 SWIS to Valve Box Ductbank, None None None None Train B Fire Area ID:

DU-SWISVB-B-U2 - SWIS to Valve Box Ductbank, Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details DU-SWISVB-B-U2 SWIS to Valve Box Ductbank, None None None None Train B Fire Area ID:

EMBED-DGB-U1 - Diesel Generator Building Embedded Conduit Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details EMBED-DGB-U1 Embedded Conduit, Diesel Generator Building None None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:00 Page: 88 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

EMBED-DGB-U2 - Diesel Generator Building Embedded Conduit Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details EMBED-DGB-U2 Embedded Conduit, Diesel None None None None Generator Building Fire Area ID:

SWWPVB-A-U1 - Service Water Valve Box Return to Wet Pit, Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details SWWPVB-A-U1 Service Water Valve Box Return None None None None to Wet Pit, Train A Fire Area ID:

SWWPVB-A-U2 - Service Water Valve Box Return to Wet Pit, Train A Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details SWWPVB-A-U2 Service Water Valve Box Return None None None None to Wet Pit, Train A Fire Area ID:

SWWPVB-B-U1 - Service Water Valve Box Return to Wet Pit, Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details SWWPVB-B-U1 Service Water Valve Box Return None to Wet Pit, Train B None None None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:01 Page: 89 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

SWWPVB-B-U2 - Service Water Valve Box Return to Wet Pit, Train B Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details SWWPVB-B-U2 Service Water Valve Box Return None None None None to Wet Pit, Train B Fire Area ID:

TBRF - Turbine Building Roof HVAC Room, Units 1 & 2 Compliance Basis:

NFPA 805, Section 4.2.3 Deterministic Approach Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details TBRF1 Turbine Building Roof HVAC None None E

Heat activated Smoke Vents: E Room, Unit 1 TBRF2 Turbine Building Roof HVAC None None E

Heat Activated Smoke Vents: E Room, Unit 2 Fire Area ID:

YARD-SWIS-Ul - Yard Area in Vicinity of SWIS Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details (All)

Area Wide None None R

Procedures/Recovery Actions: R C02-RM-U1 C02 Bottle Room (SWIS)

None None None None SWIS-EXT-U1 SWIS Yard Area None None E

Combustibles and flammable liquid control: E Fire Area ID:

YARD-SWIS-U2 - Yard Area in Vicinity of SWIS Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone I D Description System System Protection Feature Required Fire Protection Feature and System Details (All)

C02-RM-U2 SWIS-EXT-U2 Area Wide C02 Bottle Room (SWIS)

SWIS Yard Area None None None None None None R

None E

Procedures/Recovery Actions: R None Combustibles and flammable liquid control: E Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:01 Page: 90 of 91

NFPA 805 Ch 4 Required FP SystemslFeatures Fire Area ID:

YARD-Ul - Yard Area in Main Power Block Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-CST-PT-U1 Access Hatch Room to CST Pipe None None None None Trench 1-SWSURTK-U1 Service Water Surge Tank None None None None 2-CST-PT-U1 Aux Building to CST Pipe Trench None None None None 2-RWST-PT-U1 Aux Building to RWST Pipe None None None None Trench 2-SWSURTK-U1 Service Water Surge Tank None None None None FOST-Ul Fuel Oil Storage Tank None None None None HV-SWYD-U1 High Voltage Switchyard None None None None OUTSIDE-U 1 General Outside Locations in None None E

Administrative Control of Vehicles: E Main Power Block Combustibles and flammable liquid control: E UNGND-U1 Underground Ductbanks None None None None Between Various Structures Fire Area ID:

YARD-U2 - Yard Area in Main Power Block Compliance Basis:

NFPA 805, Section 4.2.4.2 Performance-Based Approach - Fire Risk Evaluation with simplifying deterministic assumptions Required Required Suppression Detection Required Fire Fire Zone ID Description System System Protection Feature Required Fire Protection Feature and System Details 1-CST-PT-U2 Access Hatch Room to CST Pipe None None None None 1 -SWSURTK-U2 2-CST-PT-U2 2-RWST-PT-U2 2-SWSURTK-U2 FOST-U2 HV-SWYD-U2 OUTSIDE-U2 UNGND-U2 Trench Service Water Surge Tank Aux Building to CST Pipe Trench Aux Building to RWST Pipe Trench Service Water Surge Tank Fuel Oil Storage Tank High Voltage Switchyard General Outside Locations in Main Power Block Underground Ductbanks Between Various Structures None None None None None None None None None None None None None None None None None None None None None None E

None None None None None None None Administrative Control of Vehicles: E Combustibles and flammable liquid control: E None Fire Safety Analysis Data Manager (4.2)

SNC - Farley Run: 08/27/2014 12:35:01 Page: 91 of 91

Joseph M. Farley Nuclear Plant Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c)

NFPA 805 Performance Based Standard for Fire Protection for Liqht Water Reactor Generatinq Plants Attachment V-Fire PRA Quality

Southern Nuclear Operating Company Aftachment V - Fire PRA Quality Southern Nuclear Operating Company Attachment V - Fire PRA Quality V.

Fire PRA Quality 2932 Pages Attached I Rev Okj Page V-1

Southern Nuclear Operating Company Attachment V - Fire PRA Quality V.1 Fire PRA Quality In accordance with RG 1.205 position 4.3:

"The licensee should submit the documentation described in Section 4.2 of Regulatory Guide 1.200 to address the baseline PRA and application-specific analyses. For PRA Standard "supporting requirements" important to the NFPA 805 risk assessments, the NRC position is that Capability Category II is generally acceptable. Licensees should justify use of Capability Category I for specific supporting requirements in their NFPA 805 risk assessments, if they contend that it is adequate for the application. Licensees should also evaluate whether portions of the PRA need to meet Capability Category Ill, as described in the PRA Standard."

The FNP Fire PRA has undergone a RG 1.200, Revision 2, Peer Review against the ASME PRA Supporting Requirements (SRs) by a team of knowledgeable industry (vendor and utility) personnel. The review was conducted by the Westinghouse Owners Group in October 2011 under LTR-RAM-II-12-007, "Fire PRA Peer Review against the Fire PRA Standard Supporting Requirements from Section 4 of the ASME/ANS PRA Standard for the Farley Nuclear Plant Fire Probabilistic Risk Assessment" in accordance with NEI 07-12 as endorsed by RG 1.200 Rev 2. The conclusion of the review was that the FNP methodologies being used were appropriate and sufficient to satisfy the ASME/ANS PRA Standard RA-Sa-2009. The review team also noted that NUREG/CR-6850 methodologies were applied correctly.

The summary of the peer review findings exhibited the following statistics for the evaluation of elements to the combined PRA Standard. For the FNP Fire PRA, 88% of the SRs were assessed at Capability Category II or higher, including 8% of the SRs being assessed at Capability Category I1l. The FNP Fire PRA had an additional 5% of the applicable SRs assessed at the Capability Category I level. The Fire PRA was found to not meet 7% of the applicable SRs.

The Westinghouse Peer Group concluded that the Farley Fire PRA is consistent with the ASME/ANS PRA Standard and supports risk-informed applications. As a result of the peer review and the fire risk evaluation process the FNP Fire PRA has undergone additional model refinements. These refinements were made consistent with the methodologies that were reviewed during the FNP Peer Review.

This attachment provides a detailed assessment of each of the findings identified by the Peer Review team. Table V-1 lists each finding and provides the FNP disposition of the finding. Table V-2 lists each SR that was MET at a Capability Category I level and the disposition by FNP as to why that Capability Category level is acceptable.

The Peer Review Reports (LTR-RAM-II-12-007) will be available for NRC review.

V.2 Sensitivity of Fire PRA Methods During the development of the FNP Fire PRA, SNC applied an alternate analysis method to NUREG/CR-6850. SNC determined that the approach taken by this alternate method provides a more realistic representation in the FNP Fire PRA model.

I I Rev Oki Page V-2

Southern Nuclear Operating Company Attachment V - Fire PRA Quality V.2.1 Electrical Cabinet Fire Severity Methodology The Electrical Cabinet Severity Factor Methodology has been removed from the Farley Fire PRA. As such, the sensitivity on this method is no longer required.

V.2.2 Sensitivity Analysis for Use of Generic Ignition Frequency NUREG/CR-6850 provides generic ignition frequencies as identified in task 6. These frequencies have since been reviewed and updated as part of FAQ 08-0048. The updated generic frequencies are documented in NUREG/CR - 6850 Supplement 1, Chapter 10. NUREG/CR-6850 Supplement 1 states that if the analyst uses these new generic frequencies then a sensitivity study must be done. The sensitivity is only required for bins, as defined in Task 6 of NUREG/CR - 6850, that have an alpha value of less than or equal to 1 in EPRI 1016735. This is discussed in more detail in note 10 of NUREG/CR - 6850 Supplement 1.

As discussed in Farley Fire PRA Task 1 & 6, Plant Partitioning and Fire Ignition Frequency, PRA-BC-F-1 1-009, the generic frequencies from NUREG/CR - 6850 Supplement 1 were Bayesian updated to reflect plant specific data. Table V. 2-1 includes the results of the sensitivity. For the purposes of this sensitivity, the Unit 1 Train A and B CDF/LERF risk model is used. Similar results/insights are expected for Unit 2 CDF/LERF.

Table V.2-1 Ignition Frequency Sensitivity Resultant Delta Case CDF/LERF CDF/LERF Change CDF - Base 6.61 E-056..9E 06 5.19E-

1. 18E-041.!7-E 04 5.9-797-81%

CDF - IGF Sensitivity 055.4!-!E-ACDF - Base

<01 ACDF - IGF Sensitivity

<01 n

2,*-5f LERF - Base 4.83E-064.1-E-06 8.37E-06.

969 3.54 73-7-0%

LERF - IGF Sensitivity 063.39E -0 ALERF - Base

<01 ALERF - IGF Sensitivity

<01 2 !.I E 5 Note 1: The <0 delta is defined in Table W-6.

Note 2: The ACDF/LERF for the Base and Sensitivity are <0. With an increase in total risk, there would also be an increase in the A risk, however, since both are <0 the delta is not provided.

It should be noted that an increase in CDF/LERF is expected based on the type of sensitivity being performed. One of the ignition frequency Bins, Bin 15 - Electrical Cabinets, is included as part of this analysis. The ignition frequency for Bin 15 had a decrease of approximately a factor of 2 between NUREG/CR-6850 and NUREG/CR-6850 Supplement 1. The Farley Fire PRA results are mostly driven by scenarios that have a Bin 15 ignition source, so it follows that an increase is seen in this sensitivity.

Rev Okj Page V-3

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V.2-1 shows that the total fire CDF results are 1.18E-04-1-T-7E--04 or a total plant risk of 1.46E-041.45E 0Q4 for CDF, which includes the contribution of the full power internal events and seismic risk. The delta CDF for this sensitivity is <0 3.67E= 05.

Table V.2-1 shows that the total fire LERF results are 8.37E-068.19E 06 or a total plant risk of 8.70E-068.52E 06 for LERF, which includes the contribution of the full power internal events and seismic risk. The delta LERF for this sensitivity is <0 2.20E= 05.

For the sensitivity analysis, based on the total plant CDF of 1.46E-041 45E -04 the delta CDF should be in the Region III range. The delta CDF for this sensitivity is within the Region III range. Based on the total plant LERF of 8.70E-06&.52E 06 the delta LERF should be in the Region II range. The delta LERF for this sensitivity is within the Region II range.

Though the ACDF/ALERF are within the acceptable guidelines of RG 1.174, a review of the contributors by fire area for this sensitivity is provided below. This review includes the Defense in Depth actions currently identified in the Fire Risk Evaluations for areas with high risk contributions.

Table V.2-2 Defense in Depth Actions Fire Area DID Action DID Description Fire Area Desrio Description The Fire PRA model assumes a transient fire HRR of 317 kW.

Transient Current plant transient controls are Electrical Controls unlikely to support sufficient 1-034 Penetration Room material to be introduced into the Train A room that would generate this level of HRR Electrical 1-035 Penetration Room Train B Main Control Room Automatic suppression is installed Diesel Diesel Generator Automatic in specific fire areas throughout Generator Fire Rooms and Suppression the plant, some of these systems Area Switchgear rooms are not credited in the Fire PRA Outdoor Units 1 and 2 XFMR Area Start-up XFMRs A and B V.2.3 Sensitivity Analysis for Use of Control Power Transformer The Farley Fire PRA was originally developed using the recommended hot short probabilities from NUREG/CR-6850. ML14086A165, "Supplemental Interim Technical Guidance on Fire-Induced Circuit Failure Mode Likelihood Analysis" was published on April 23, 2014. This guidance provided updated data for the recommended hot short probabilities to be used in a Fire PRA. The guidance is provided in ML14017A135, "Enclosure 1 - Supplement to Interim Guidance Pending Publication of Expert Elicitation Results." These updated hot short probabilities have been incorporated into I

I Rev Oki Page V-4

Southern Nuclear Operating Company Attachment V - Fire PRA Quality the Farley Fire PRA and therefore, the sensitivity analysis for the credit of a control power transformer is no longer required.

I Rev 0kj Page V-5

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition CS-B1 The Farley breaker Closed The PRA components are not explicitly discussed in a The Farley circuit analysis coordination coordination calculation. Calculation SE-C051326701-calculation, SE-C051326701-002, documentation was 002 is titled NSCA components; however, informal has been updated to address all identified to be review has determined that PRA components are coordination concerns. This update incomplete based on addressed. The information to determine the status of identified two panels that were the Farley Fire PRA coordination for PRA components consists of informal found to not be coordinated; all components being queries and spreadsheets. Supporting Requirement other panels were dispositioned as credited.

CS-B1 -01 Category II requires all buses credited in the being acceptable. The two panels Fire PRA to be analyzed for proper over current are N1 R1 9L00504 and coordination and protection.

N2R19L00504. Calculation PRA-BC-F-11-003 (Cable Selection and Revise calculation SE-C051326701-002 to formally Detailed Circuit Analysis) has been validate that PRA buses are addressed for proper updated to address this coordination and incorporate results into the Fire PRA coordination issue. Based on these model ad needed.

conclusions these two panels have been failed in every scenario for the Farley Fire PRA. Associated Circuits Analysis Common Power Supply And Common Enclosure calculation, SE-C051326701-002 has been updated to reflect this update. The Farley Component Selection Report, PRA-BC-F-002, has also been updated to reflect the inclusion of these panels to the UNL list, see Page F-24 and F-180, Appendix F.

CS-B1 The Farley breaker Closed E-068 identifies cases where the cable lengths of An analysis was completed that coordination electrical loads were credited to demonstrate selective reviewed the panels that credited calculations use cable coordination for the Cable Spreading room. This cable length as part of the length as part of the assumption is only valid for the Appendix R fire where justification for coordination. The justification for proper the equipment and cables are assumed damaged for entire function of these panels was coordination. This is the entire fire area. Supporting Requirement CS-B1-01 then failed for any fire that impacted not a justifiable Category II requires all buses credited in the Fire PRA to the cable within the identified I

I Rev Oki Page V-6

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition disposition for use in be analyzed for proper over current coordination and length. Once the length the Fire PRA.

protection.

requirement was met the function of that cable was the only function Analyze impacted PRA buses for proper coordination failed. See calculations, Associated and incorporate results into the Fire PRA model.

Circuits Analysis Common Power Supply And Common Enclosure calculation, SE-C051326701-002, and PRA-BC-F-1 1-003 (Cable Selection and Detailed Circuit Analysis) for more information. A modification is also scheduled to improve coordination for six additional 125VDC load distribution panels per unit. For further information on the modification of these panels see Plant Modifications Committed in Table S-2 of Attachment S.

FQ-A3 Appendix L of NUREG-Closed A non-suppression probability of 3.04E-5 is used for the The Farley MCR analysis has been CR/6850 had been Main Control Room (NSP-0401

  • basic events). A updated to accurately apply the incorrectly applied to review of the Scenario Development report, the non-suppression factors as the Main Control Board Summary Report, and the MCR Report did not locate appropriate to the Main Control scenarios in the Farley the justification of this probability. Based on discussion Board scenarios. The Farley Fire Fire PRA. The ignition with the Farley team, the values were derived from Scenario Report discusses the frequencies have since NUREG/CR-6850, Attachment L. A review of that scenario development process for been updated to Attachment did not support a NSP below 1 E-4 under the the Main Control Board and the use accurately apply best of circumstances. A NSP of 2E-2 (similar to other of Appendix L in section 13.1.2 of Appendix L.

NSP events) would make MCR fire the highest PRA-BC-1 1-014.

contributor to plant risk.

Re-evaluate the NSP used for the Control Room and document the evaluation clearly in one of the reports.

FQ-C1 Possible combination Closed A review of cutsets for different sequences found Every COMBO event is evaluated IRev Oki Page V-7

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition events were missing multiple HRA combinations that are not being replaced and incorporated in the fire PRA. An from the cutset results by a COMBO* event and do not appear to be evaluated updated dependency analysis was for the Fire PRA model.

for dependence. One such combination is lOP-completed after the peer review MS032-IH-F and OAR_ B _1 ----

H-F which has a findings were addressed in the combined failure probability of approximately 7E-5. A model. The latest results of the review of the HRA Calculator package supplied shows dependency analysis can be found that no evaluation was performed for this combination of in the Human Reliability Analysis for events. Other HRA combinations could also be missing, Fire Events, PRA-BC-F-11-016.

particularly with new operator actions added for the fire scenarios. HRA dependence could significantly increase cutsets since the rule file makes HRAs independent unless the events are replaced by an evaluated combination.

Review the FPRA cutsets without recovery (all events set to screening values) to ensure that all important combinations are evaluated.

FQ-D1 The CCFP for Farley Closed In Section 3 of the Farley Nuclear Plant Summary The Farley Fire PRA has continued Fire PRA was much Report, Farley reports a CDF of 9.65E-05/year and a to evolve and be refined throughout greater than what the LERF of 1.92E-5/year. This yields a Conditional the analysis. Currently the CCFP is FPIE number was.

Containment Failure Probability (CCFP) of 1.99E-01.

at a much more reasonable value After continued For the FPIE PRA, the reported CDF was of the order of based on the final CDF and LERF refinement the Fire 3.5E-05/year and the reported LERF was of the order of results. The results and insights PRA CCFP has 2E-07/year. This translates to a CCFP of about 4E-03.

related to CDF and LERF can be decreased to a more This is a significant difference, especially when found in the Farley Summary reasonable value as considering that the leading contributor to LERF for the Report section 3 of PRA-BC-1 1-compared with the FPIE PRA, SGTR, is not applicable for fire. This yields 017.

FPIE.

inconsistent results.

While the current results may be correct, Farley needs to look at the contributors to LERF to explain the basis for the high CCFP with respect to the FPIE PRA CCFP.

I I Rev Okj Page V-8 I Rev Oki Page V-8

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status FindinglObservation Disposition Farley should look at sequences where the fire not only causes core damage but also directly affects containment integrity. Two likely candidates are sequences that lead to a new ISLOCA scenario and sequences that lead to containment isolation scenarios.

FQ-El The Farley Fire PRA Closed The summary report lists and describes significant The Farley Summary report documentation did not contributors to core damage and LERF. The back includes additional details accurately address the references require consideration of analysis issues describing the types of reviews that types of reviews that which are not described in the report as having been were completed on the Farley Fire were performed during done. For example, the back references require a PRA. The type of review and the the scenario cutset review the results of the PRA for modeling consistency, detailed cutset reviews are review sessions.

a review of results to determine that the flag event described in section C.1 of settings, mutually exclusive event rules, and recovery Appendix C in the Summary Report, rules yield logical results, a review of contributors for PRA-BC-F-1 1-017.

reasonableness and a review of the importance results for reasonableness. Appendix F notes that these were accomplished and typically refers back to Appendix C.

Appendix C does not describe these reviews as being accomplished, nor does it describe the results of the reviews. In addition, back Reference D5 requires a review of non-significant cutsets for reasonableness.

Appendix F states that dominant cutsets were reviewed and those that were reduced in frequency to non-significance as a result of the review constitute the review of non-significant cutsets. This does not satisfy the requirement to review non-significant cutsets. Non-significant cutsets generated in the solution of the model need to be reviewed to confirm that their frequency is not underestimated due to modeling errors.

Expand the discussion of model solution and review in the summary report to indicate that required review items have been accomplished.

FQ-F1 Level of detail Closed The documentation of the FPRA results does not The Farley Summary report has IRev Oki Page V-9

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-I Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition describing the risk adequately describe the top risk contributors such that it been updated to reflect the insights significant scenarios is clear why these scenarios, basic events, and human by reviewing the top contributors for was identified as not actions are dominant. Based on other findings (FQ-D1-CDF and LERF. This describes the being sufficient in detail 01 and FQ-E1 -01), it is not clear that the Farley team fire induced impacts as well as the understands the bases for these top scenarios. Results random failures. The resolution of presentation is important for PRA acceptability, this finding is found in Appendix C Understanding of the PRA results is necessary for of PRA-BC-F-11-017.

performing any RI application to support the plant Provide more detailed discussions of the fire impacts and results to represent a strong understanding of the fire scenarios.

FSS-A2 Target set definition in Closed FNP is missing the basis for not including targets A review of the full room burnout Fire Zones (FZs) that outside the fire compartment for full room burnout scenarios was completed that do not have fire rated scenarios. For full room burnout scenarios, all targets in looked for open boundaries to the boundaries on all sides the fire compartment are included. However, there is no adjoining FZs and the possible as it relates to documented basis for not including targets outside the interactions that could take place.

scenarios that are fire compartment for full room burnout scenarios. If the For some particular fire areas a classified as full room compartment has an opening to an adjacent scenario was postulated that would burnouts.

compartment, it was not verified that targets in the fail all targets within the fire area.

adjacent compartment would be outside of the ZOI of all However, in most cases it was the ignition sources in the compartment analyzed for full determined that there was no room burnout.

ignition source near the open boundary that would impact targets See F&O PP-B3-01 (F) for a possible resolution.

in an adjoining FZ. The Farley Fire Scenario Report includes discussion of the scenario development process for these specific cases in section 3.1.1 of PRA-BC-1 1-014.

FSS-B2 The Main Control Closed An office workstation fire scenario is discussed in the The Farley Main Control Room Room Abandonment documentation, but is not fully justified. The workstation Abandonment Calculation includes IRev Oki Page V-10

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition calculation identifies fire scenario is potentially the most significant fire the discussion of the workstation the potential for a scenario considered.

fire in section B.8 as a sensitivity to workstation fire but the analysis with the results shown does not describe the Provide better documentation of how the workstation fire in Table B-8. NUREG/CR-6850 fire type in significant was modeled and the results of this fire scenario, does not provide any basis for this detail type of fire from an ignition frequency standpoint. Therefore it is not included as one of the potential ignition sources in the base calculation. A review of the sensitivity analysis involving the workstation shows that the analysis is not sensitive to that type of fire given the design of the Main Control Room envelope.

FSS-C1 The Farley Fire PRA Closed Two-point fire intensity model that encompass low The development of fire scenarios does not employ the likelihood, but potentially risk contributing, fire events for the Farley Fire PRA did not use of a two point fire were not used in all cases. Fire scenarios were done identify any instances where further modeling treatment in with ignition sources characterized with one fire analysis resolution would be gained the development of the intensity, by the treatment as inferred by the fire scenarios.

requirements for CC II and CC III.

To reach Capability Category II, use a two-point The implications of retaining the CC intensity model for all ignition sources.

I treatment in lieu of refining as described for CC II or CC Ill is Utility Comment: The development of fire scenarios potentially a higher calculated CDF for the Farley Fire PRA did not identify any instances contribution. The CC I treatment where further analysis resolution would be gained by the inherently will not result in under-treatment as inferred by the requirements for CC II and estimation of fire risk. As such, the CC Ill. The implications of retaining the CC I treatment current treatment is conservative.

in lieu of refining as described for CC II or CC Ill is Provided this treatment does not potentially a higher calculated CDF contribution. The result in masking of risk increases in CC I treatment inherently will not result in under-future applications, further estimation of fire risk. As such, the current treatment is refinements are not considered conservative. Provided this treatment does not result in necessary.

I I Rev Oki Page V-11I

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition masking of risk increases in future applications, further refinements are not considered necessary.

Response: The SR stipulates that a two-point model is required for CC-Il. As you stated in your comment, Farley feels that the one-point model is conservative and justified. This would be viewed as the proposed resolution, but the F&O stands.

FSS-C2 The Farley Fire PRA Closed Ignition source intensity were characterized such that The only readily available reference did not characterize the fire is initiated at full peak intensity and ignition sources for a time dependent growth rate ignition source intensity that are significant contributors to fire risk were not that could be considered in the for a time dependent characterized using a realistic time-dependant fire analysis is 12 minutes as growth rate in the growth profile. Generic methods from the Hughes recommended in NUREG/CR-6850.

scenario development.

Associates Generic Fire Modeling Treatments were The treatment would involve a t2 used to characterize ignition source intensity. These growth rate. If a particular generic methods did not incorporate fire growth curves.

source/target interaction has a spacing where the target is at the Characterize ignition sources that are significant critical damage spacing threshold, contributors to fire risk using a realistic time-dependant such a treatment may provide some fire growth profile.

benefit as successful suppression with that time period would prevent Utility Comment: The only readily available reference target damage. However, if the for a time dependent growth rate that could be target is located well within the considered in the analysis is 12 minutes as calculated damage distance, the recommended in NUREG/CR-6850. The treatment corresponding time to reaching the would involve a t2 growth rate. If a particular damage threshold is very short and source/target interaction has a spacing where the target effectively precludes any is at the critical damage spacing threshold, such a meaningful credit for suppression.

treatment may provide some benefit as successful In the case of the Farley Fire PRA, suppression with that time period would prevent target the majority of the target spacing for damage. However, if the target is located well within the the dominant risk contributors is calculated damage distance, the corresponding time to such that no meaningful credit for reaching the damage threshold is very short and suppression is available. In other effectively precludes any meaningful credit for dominant risk contributors, the I

I Rev Oki Page V-12

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition suppression. In the case of the Farley Fire PRA, the scenario involves high energy majority of the target spacing for the dominant risk arcing fault (HEAF) events were no contributors is such that no meaningful credit for growth time is applicable. The suppression is available. In other dominant risk implications of retaining the CC I contributors, the scenario involves high energy arcing treatment in lieu of refining as fault (HEAF) events were no growth time is applicable, described for CC Il/111 is potentially a The implications of retaining the CC I treatment in lieu of slightly higher calculated CDF refining as described for CC Il/111 is potentially a slightly contribution. The CC I treatment higher calculated CDF contribution. The CC I treatment inherently will not result in under-inherently will not result in under-estimation of fire risk.

estimation of fire risk. As such, the As such, the current treatment is conservative, current treatment is conservative.

Provided this treatment does not result in masking of Provided this treatment does not risk increases in future applications, further refinements result in masking of risk increases in are not considered necessary.

future applications, further refinements are not considered Response: The Farley modeling was found to be necessary.

consistent with CC-I but did not meet the requirements of CC-Il. The comment provides the basis for stating that the existing treatment is adequate. It does not provide evidence that a time-dependent heat release rate model was used.

FSS-D1 The treatment of Closed The fire modeling tools selected for use are appropriate The Farley Scenario development secondary for evaluating the zone of influence associated with notebook was updated to include combustibles was not individual fixed and transient ignition sources, but do not additional details on how the clearly defined in the provide for estimating fire growth and damage behavior treatment of secondary scenario development for fire scenarios involving ignition and fire spread on combustibles is dealt with during documentation.

secondary combustibles. With the generic fire modeling scenario development. Further treatment selected for this fire PRA, there does not information regarding this finding appear to be a way to model fire growth on secondary can be found in section 4.0 of PRA-combustibles. Consequently, the extent of fire BC-F-11-014.

development cannot be modeled.

Where secondary combustibles are located within the zone of influence, develop methods for estimating fire I I RevOkj Page V-13 I Rev Oki Page V-13

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status FindinglObservation Disposition growth on secondary combustibles and the damage caused by this additional fire development.

FSS-D7 The Fire PRA credits Closed SR FSS-D7 requires credited fire suppression systems Supporting documentation has been the in cabinet C02 to be installed and maintained in accordance with included in the Farley Fire Scenario system installed at applicable codes and standards, and the credited report to further discuss the in Farley. There was no systems must be in fully operational state during plant cabinet C02 suppression system documentation operation. These requirements are not met, but fire and the associated test and provided to support the suppression systems are still being credited. As noted inspection procedures that are availability of this in the Conclusions section of Document # 0005-0012-credited in the Fire PRA. It has also system.

002-002-04 (Hughes Associates), "The other main been identified that the system does concern with the systems installed at FNP is the periodic require modifications, such as maintenance and subsequent corrective action. Firstly, mechanical equipment and the plant procedures for inspection, testing and detection upgrades, to be made to maintenance (ITM) do not address a few key activities make the system operable as required by NFPA 12. Secondly, the prioritization of designed. This is found in section work orders sometimes results in extended impairments 8.1.1 of PRA-BC-F-11-014.

(e.g., observed CR / work request tags over two years old), which negatively affects the fire protection program objective to maintain working systems." Credit is being taken for fire suppression systems that do not meet the requirements of FSS-D7 for taking this credit.

Verify that credited fire suppression systems are installed and maintained in accordance with applicable codes and standards and demonstrate that credited systems are in a fully operable state during plant operation.

FSS-D7 The non-suppression Closed In Tables 13-1 through 13-12 the equation eA(-lambda*t)

The application of the MCR probability that was was used to calculate the non-suppression probability abandonment non suppression originally used to for MCR abandonment scenarios. The control room probability has been re-evaluated calculate the MCR lambda value from Table P-2 was selected. The time, t, using the floor value of 1.OOE-03 for abandonment was obtained through the CFAST runs and plugged into all bins that are determined to reach frequency was un-the equation. In scenarios in which the time to the abandonment threshold. The conservative based on abandonment was greater than 25 minutes a nominal results of this review are identified I

I Rev Oki Page V-14

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition direction provided in NSP of 0 was selected. A NSP of 0 should not be in section 13 of PRA-BC-F-1 1-014.

Appendix P of NUREG-assumed for these cases. Instead, it is suggested to run CR/6850.

the CFAST cases longer than 25 minutes such that the analysis can credit a larger time with no abandonment conditions reached (i.e. if the case is ran to 60 minutes with no abandonment conditions reached, t can be credited up to 60 minutes) and still use the e('Iambdat) equation to calculate NSP.

Additionally, the MCR equipment rooms are normally unoccupied and NSP should be associated with the electrical equipment room vs. the control room. If the control room lambda is used, a basis should be developed why the control room lambda is more appropriate than the electrical cabinet lambda. If the control room lambda basis has been justified, then a sensitivity analysis should be performed using the lambda of electrical fires. This calculation can be non-conservative.

FSS-D8 The Farley Fire PRA Closed Note 8 associated with SR FSS-D8 suggests The Fire PRA was first developed does not look at the consideration of the time available to suppress a fire without credit for suppression or time available for a prior to target damage and specific features of physical detection, the target set for a given suppression system to analysis units and fire scenarios under analysis that scenario was based on the ignition successfully suppress a might impact suppression system activation and source type. Further in the analysis fire before target coverage. Such consideration is not documented.

credit for the existing detection and damage.

Credit is taken for automatic fire suppression in some suppression, and in some cases scenarios without consideration of the factors required plant modifications, systems were under this SR.

credited. For these cases where the credit was taken the target set Perform an analysis that considers the time available to was not changed based on the time suppress a fire prior to target damage and the specific to suppression or distance to target.

features of the PAUs and fire scenarios under analysis Instead a conservative approach to determine what impact they have on suppression was taken to leave the original system activation and coverage, target set included in the Fire PRA I I Rev Okj Page V-15 I Rev Oki Page V-1 5

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition along with the failure rate of the suppression system, therefore not requiring a review of damage time vs. suppression time. This is found in section 8.0 of PRA-BC-F-11-014.

FSS-E3 The Farley Closed Supporting requirement E3 asks to provide a mean The documentation has been documentation did not value of, and statistical representation of, the uncertainty updated to include discussions address the uncertainty intervals for the parameters used for fire modeling the related to the uncertainty for fire related to the use of fire fire scenarios. Farley performed fire size and heat modeling. See Table D-1 of the modeling for the fire release rate selection in accordance with NUREG/CR-Farley Fire PRA Summary report, scenarios.

6850 and/or applicable FAQs. However, the methods for PRA-BC-F-1 1-017.

developing the statistical representation of the uncertainty intervals and mean values currently do not The associated SR was exist. However, this is not reported in the dispositioned as CC I which is documentation.

judged to be sufficient given the two concerns noted.

In the documentation, explain that it is understood that methods for developing the statistical representation of the uncertainty intervals and mean values currently do not exist.

Utility Comment: This specific F&O was issued against a technical element and the indicated resolution involves a documentation clarification. This documentation clarification will be implemented.

FSS-F1 The exposed structural Closed Section 2.11 of the FNP Summary Report A review and analysis was steel evaluation was (FNPSummaryReport final.pdf) claims that, "The completed of the structures at not originally performed Structural Steel Evaluation performed to evaluate the Farley for both units to determine as part of the Farley potential for fire to impact structural steel capacity which the amount of exposed structure Fire PRA.

could impact fire compartment boundaries is steel that is susceptible to fire documented in the FNP Fire PRA Report PRA-BC-F damage and ultimately leading to a 014, Rev. 0, Fire Scenarios Report [5]." This building collapse. The analysis documentation was not found in the referenced report.

concluded that there is a potential Include in the Fire Scenarios report the structural steel for this scenario to occur in the I

I Rev Oki Page V-16

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status FindinglObservation Disposition evaluation identified in final Summary Report and Turbine Building. This scenario has update self-assessment.

been added and is accounted for in the total plant risk and delta risk calculations. This is found in section 10.5 of PRA-BC-F-1 1-014.

FSS-G6 The Farley Fire PRA Closed The Multi-compartment analysis identifies several areas The Farley Fire PRA MCA analysis MCA analysis was where further evaluation is required. This evaluation has been completed with all incomplete at the time has not been completed to either screen the zone or scenarios being evaluated. The of review with many develop a fire scenario based on multi-compartment fire.

HGL/MCA report has been updated open items.

A screening of the multi-compartment scenarios were to show the final results for the done, those that were screened out were not included in analysis. This is found in the quantification. The multi-compartment scenarios Attachment B of PRA-BC-1 1-015.

flagged for further evaluation are in Table 3-1 of the Multi-Compartment Analysis. Further evaluation is still being worked on, so these scenarios have not been included in quantification. Given the current CDF, the MCA could increase risk above 1 E-4/yr.

Complete the MCA to either quantify the PAUs where a fire could spread to an adjacent PAUs or screen the PAUs for MCA FSS-H1 Non-Fire PRA targets Closed For fire scenarios considered during the peer review The scenario development were removed from the walkdown, the nature and characteristics of the damage database has been re-populated database. Leading to target set were different in three different sets provided with all target set information, inconsistencies for review, including the computer printout of the fire targets specifically modeled in the between the scenario scenario summary and two sets of walkdown notes.

Fire PRA and those that are not.

development sheets One consistent set of documentation should be The scenario printout sheets found and what was identified maintained in a retrievable format.

in Appendix A of the Fire scenario in the field.

development report contain all Include all relevant target sets in the computer-based targets identified during the walk documentation and handle by disposition those targets down phase regardless of the that are not risk significant for a particular scenario, relationship to Fire PRA components. This is found in Appendix A of PRA-BC-F-11-014.

I I Rev Oki Page V-17

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status FindinglObservation Disposition FSS-H5 The Farley Closed The generic fire modeling tool referenced in the Fire The documentation has been documentation did not Scenario Report, Reference 6 (Hughes generic updated to include discussions address the uncertainty treatment) is used for generic treatment of ignition related to the uncertainty for fire related to the use of fire sources as an approach to bound many scenarios, but modeling in response to SR FSS-modeling for the fire its use does not provide uncertainty treatment on a fire E3. See Table D-1 of the Farley scenarios, scenario basis.

Fire PRA Summary report, PRA-BC-F-1 1-017.

Provide uncertainty evaluations at least generically for those scenarios that use the generic treatment tools and on a case by case basis for the sources that use additional detailed fire modeling to further describe the scenarios used.

Utility Comment: This specific F&O is inconsistent with F&O FSS-E3-01. The indicated resolution for FSS-E3-01 states in part that the analysis documentation should be enhanced to note that methods for developing the statistical representation of the uncertainty intervals and mean values currently do not exist. However, F&O FSS-H5-01 then asks to undertake evaluations to address uncertainty. These this latter F&O should be revised so that it is consistent with FSS-E3-01.

Response: The F&Os address the specific SR requirements. The response to F&O FSS-E3-01 may be used to justify the treatment of uncertainty for FSS but the F&O documents compliance with the standard and as such remains.

IGN-A7 Newly installed Closed During the walkdown - ignition sources (specifically The Farley Fire PRA has been in potential Ignition electrical cabinets) were found in the plant that is not development for some time. The sources were identified listed on the list of ignition sources for the particular ignition source walk down and in the field that were PAU. Specific examples include N1 R1 L0001 in the scenario development were some of not included as part of cable spreading room and N1 R1 5A002X and the first tasks that were completed the original scenario N1 R5AO03X in the switchgear room. A walkdown as part of this analysis. A qualitative I

I Rev Oki Page V-18

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition development, and/or review of plant modification is necessary to review of the panels identified ensure the plant FPRA reflects the as built as operated during the peer review walkdown configuration.

showed no significant change in the plant CDF. This is based on the fire This issue may be due to new plant equipment that was zones these panels were located in added after the initial ignition frequency walkdown -

and the level of scenario nevertheless the fire PRA should be reconciled to development already included in include these new ignition sources.

these fire zones. The panels are located in a part of the room that already contains detailed scenarios and the introduction of the new sources are not expected to change the target set of adjoin scenarios.

Section 3.5 of the Summary Report, PRA-BC-F-11-017, provides steps that will be taken to account for changes in the plant design that have occurred since the initial Fire PRA development.

IGN-A7 The yard transformers Closed Bins 27-29 have not been filled. Large Yard The Farley Fire PRA task 6 has had been incorrectly Transformers have been incorrectly binned in Bin 23 been updated to accurately binned during the Task

("indoor transformers"). It is clearly stated in represent the transformers located 6 development and NUREG/CR-6850 that large yard transformers are not in the yard to their applicable bins should be moved to part of this count. As a result each large outdoor and have been removed from bin their appropriate bins.

transformers (MT, UAT, SuT) should be binned in both

23. The frequency per component Bin 27 (Yard Transformer - Catastrophic) and Bin 28 has been updated accordingly and (Yard Transformer-Non Catastrophic). Additionally, used for the applicable scenarios.

Bin 29, Transformer Yard - Others, should also be filled.

See Appendix C of Plant Partitioning and Fire Ignition Since Bin 23 may have been misinterpreted, it is Frequency for Farley Fire PRA, suggested that indoor transformers typically associated PRA-BC-F-1 1-009.

with essential lighting, etc. be looked at for applicability in the FPRA if not already evaluated. Indoor transformers over 45kVA should be included in the I

I Rev Oki Page V-19

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-I Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition count for this bin.

IGN-A7 The Farley scenario Closed During the walkdown of the Bravo 4160 Switchgear The Farley Fire PRA has been development did not room, it was observed that the Foxtrot Switchgear was updated to accurately correct the accurately account for split between 2 PAUs. The switchgear had a count of scenario development to account the frequency split 15 vertical sections. PAU 335 had a count of 8 for the ignition source split between between the two fire switchgear vertical sections and PAU 343 had a count of the two fire zones of the SWGR zones as it was 8 vertical sections. This is a clear example of room. The ignition source count of identified in the field.

inadequate PAU boundary.

the SWGRs has not been changed to reflect the accurate number of Recommend that the PAU such that the Foxtrot cubicles. This change would result switchgear is contained in one PAU and the count of the in a non-significant impact to the entire switchgear should be 15 vertical sections. In total plant ignition frequency based cases where ignition sources have been split between on the total count for Bin 15. The PAUs the count should be verified correct.

ignition frequency for the scenarios related to the SWGRs are accurately represented. These updates can be found in the Farley Scenario report, Appendix A, PRA-BC-F-1 1-014.

IGN-A9 The transient factors in Closed PAU 2321 (Sample Panel Room) has a transient fire The transient ignition frequency the ignition frequency frequency of zero. Similar to the first page of Appendix allocation has been re-visited for the development had B, a storage factor of "low" or 1 should be chosen such Farley Fire PRA based on this identified fire zones that that 2321 has a non-zero transient fire frequency. Right finding. The appropriate changes had a 0 factor which led now 2321 has a non-zero ignition frequency due to a have been made to accurately to a frequency of 0.

small number of cable in the area filling Bins 11 and 12.

reflect the transient ignitions sources located within each fire A non-zero transient factor should be filled in.

zone. These updates were made in Farley Plant Partitioning and Ignition Source Task 1 and 6 report, PRA-BC-F-11-003, and carried into the ignition source calculation for the scenario development, PRA-BC-F-11-014.

I I Rev Oki Page V-20

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition PP-B3 The Farley Fire PRA did not contain sufficient information on scenario development with respect to the crediting of fire barriers.

Closed SNOC has not provided sufficient evidence that Fire Zone PAUs were evaluated for fire resistance capabilities of barriers, nor was there sufficient evidence that credited spatial separations were analyzed.

Specific examples are cited in PRA-BC-F-1 1-001, Section 2.2, for PAUs that use "natural divisions." The document cites that the lack of fire barriers between these PAUs will be evaluated during the MCA.

However, the MCA analysis appears to only discuss hot layer issues, and does not consider whether a fire propagates outside of the PAU or if there is a zone of influence and target damage outside of the PAU.

Another example of where spatial separation is credited is Tool Room 0441.

The Farley scenario development report has been updated to provide more details on the scenario development based on the ignition source and target identification process. This can be found in the Farley Scenario Development report, PRA-BC-F-11-014, section 3.1.1. The impact on the Hot Gas Layer and Multi-Compartment Analysis has also been revisited to assure that the boundaries of the rooms have been adequately represented in the calculation of the volumes.

Full room burnout scenarios are developed and quantified, but without sufficient evidence that fire barriers or spatial separation issues have been evaluated. It appears that specific PAUs are screened from having multi-compartment impacts without consideration of fire propagation or ZOs impact across spatial divisions.

SNOC has presented a plan to resolve the Fire Zone PAU vs. Fire Area PAU issue. Implementation of this plan is sufficient to address the issues identified in PP-B2 and PP-B33. In the plan, Fire Areas will be treated as PAUs. Particularly, SNOC staff have acknowledged that for "full burn" and "base case" fire scenarios, they will review and document the capabilities of barriers and the appropriateness of credited spatial separations, and will not inappropriately credit barriers or spatial separations for fire scenarios. The plan includes the following:

1. Those APs that have one or more boundaries I

I Rev Oki Page V-21

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition that are not physical features or are not rated fire barriers will be identified and a requirement will be added to clarify that this must be recognized in the development of fire scenarios.

There will be confirmation that the results of the above have been observed and documented.

2.

Enhance the documentation to acknowledge the crediting of non-rated physical boundaries and provide a basis recognizing that the justification will rely on physical observations during plant walkdowns or through equivalent means as well as general construction methods (masonry block wall, concrete walls, etc.).

3.

Address the nature and consequence of anticipated fire events for all APs for which explicit fire scenarios are not developed (base cases) and confirm that the results are appropriate given the boundaries for the AP.

4.

Confirm that bounding room burn-out cases are not used for any APs that are not fully bounded by physical fire barriers, and that there is a justification for crediting those physical barriers.

5.

Confirm that the resulting analysis does not change (reduce) the level of resolution associated with the existing fire scenarios developed to support the requirements of SRs associated with FSS.

Modify the hot gas layer and multi-compartment analysis (MCA) so that any unnecessary conservatism caused by using a smaller volume artificially caused by an I

I Rev Oki Page V-22

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition assumed AP boundary are removed.

PP-C3 The Farley Fire PRA Closed Plant personnel have given verbal assurance that plant The Farley Task 1 and 6 report did not contain walkdowns have been performed to confirm the plant identifies the ignition sources sufficient information on partitioning boundaries. It is reasonable to presume that identified in each fire zone. The scenario development the fire protection engineer would perform this walkdown results of the walkdowns are input with respect to the task. In addition, walkdowns were performed to support into a database that contains the identification of fire the Fire PRA ignition frequency task. Furthermore, necessary information related to

barriers, some notes were found as further evidence that some Task 1 and 6. This database is walkdowns were performed. However, documentation considered to be the controlled copy of the plant partitioning walkdown is not readily available of the results of these tasks. These for peer review. SR PP-C3 requires documentation of results are found in Appendix D of key or unique features of the partitioning elements for report PRA-BC-F-1 1-009. Section each physical analysis unit. SR PP-B7 requires a 3.1.1 of the Farley Scenario Report, confirmatory walkdown of partitioning elements.

PRA-BC-F-1 1-014, describes the process of identifying applicable Include Plant Partitioning walkdown sheets as part of scenarios based on the ignition PRA secondary documentation, and refer to the source, surrounding targets and fire walkdown sheets in PRA-BC-F-1 1-001, Farley Fire PRA barriers.

Tasks 1 & 6, Plant Partitioning and Fire Ignition Frequency. In particular, fire barriers and spatial separations that are credited in fire scenarios should be validated. When where no prior documentation can be found, new walkdowns may be required.

PP-C3 The Farley Fire PRA Closed Fire Zones are identified as Fire PRA plant analysis The Farley Fire PRA documentation did not contain units in PRA-BC-F-1 1-00. Fire PRA staff have has been updated to be consistent sufficient information on expressed that the Fire Areas, not Fire Zones, should be in the naming convention scenario development assessed as the PAUs. However, the Fire Zone PAU throughout the analysis concerning with respect to the form the basis for initial PAU ignition frequency, whole the use of PAU and fire zone. The documentation of fire room burns, and initial screening in later PRA analysis

'rooms' at Farley are considered fire barriers.

Fire Zones as PAUs are used consistently and zones, while the fire areas are extensively in the FPRA documentation. There is a considered PAUs. The Task 1 and disconnect between the PAUs defined in PRA-BC-F-1 1-6 report, Plant Partitioning and 00 and SNOC staffs statements of what constitutes a Ignition Frequency PRA-BC-F-1 1-I I Rev Oki Page V-23

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition PAU. This adversely affected the review of the Plant 009, Cable selection and Detailed Partitioning technical element. SNOC desires to call the Circuit Analysis PRA-BC-F-1 1-003, entities that are currently described as Fire Zone PAUs and the Farley Scenario report, as Administrative Partition, and to treat Fire Areas as PRA-BC-F-1 1-014 contain this PAUs.

clarification.

F&O PP-B3-01 identifies an acceptable plan to address the technical issues around the definition of PAUs, that Fire Areas, not Fire Zones, form the basis for PAUs.

Fire Zones and similar entities will be identified as "Administrative Partitions" (AP). Since the term "Physical Analysis Unit" or PAU is extensively in Fire PRA documentation to describe Fire Zone PAUs, all Fire PRA documents should be reviewed and revised to call these compartments Administrative Partition.

Furthermore, the term "Administrative Partition" (AP) should be defined in the PP documentation and the APs descriptions (formally, Fire Zone PAUs), should be retained.

PRM-B2 The Farley internal Closed Internal Events PRA peer review exceptions and Table 1 of Fire PRA logic events finding had only deficiencies have only partially been dispositioned.

Development, PRA-BC-F-1 1-004 been partially Table 1 of the Fire Model document (PRA-BC-F-1 1-has been updated to addressall addressed in respect to 004_VOa) lists some of the internal events findings, but internal events PRA findings and the impact on the Fire not all. All findings included in the internal events peer their impacts on the fire PRA.

PRA.

review must be included and disposed in the PRM notebook. Disposition of findings could not be verified.

Discussion with Southern Company personnel indicated that some of the findings had not been addressed.

Expand Table 1 of the Fire Model document to include all findings. Describe the impact of the finding on the fire PRA. For those that impact model elements applicable to the fire analysis, describe the resolution in I

I Rev Oki Page V-24

Southern Nuclear Operating Companv Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition sufficient detail to allow a reviewer to conclude the finding has been dispositioned.

PRM-C1 The RCP shutdown Closed The new RCP shutdown seals are included in the fault Fire PRA has been developed seals were not tree model but are not described in Appendix B.

based on internal events PRA adequately discussed Appendix B should be revised to describe these new model having model of RCP in the documentation seals and their impact on RCP seal failure flow rate.

shutdown seal. Section 2.0, for the Fire PRA model The Fire PRA modeling pertaining to RCP seal failure is Appendix B of Fire PRA logic development, not adequately described in PRA-BC-F-1 1-004.

Development, PRA-BC-F-1 1-004 has been updated to add RCP Revise Appendix B to describe the new shutdown seals shutdown seal modeling.

and their impact.

UNC-Al The Farley fire PRA Closed Farley presents the CDF results in Section 3.0 of the Appendix D of the Farley Summary provided Train A and B Summary Report. The way the results are presented report, PRA-BC-F-1 1-017, has been CDF results but did not are as an annualize CDF for Train A operating and an updated with a revised parametric define total plant CDF.

annualize CDF for Train B operating and both are called uncertainty analysis for both CDF The parametric total plant CDF. There is no discussion as to what these and LERF for Train A and B uncertainty analysis two CDF values meant or a value for the "true" plant individually. The quality of the should be more specific CDF. In Appendix D of the Summary Report, Farley analysis was improved by applying in scope and use a presents the results of their parametric uncertainty the Monte Carlo method with greater sampling size.

analysis for CDF. Although not documented, this 50,000 samples. The resulting appears to be for CDF related to Train A Operating only.

curves are well behaved and the The parametric uncertainty analysis was performed calculated means show minimal using the Latin Hypercube method with only 1000 difference when compared to the samples. The resulting curve was not well behaved and point estimates.

the calculated mean is well below the point estimate in Section 3.

Discussion of how the total plant CDF/LERF is calculated is also As a start, Farley needs to define what the two results, provided in the Summary Report.

annualize CDF for Train A operating and an annualize This describes how the Train A and CDF for Train B operating, mean and a single total Plant Train B results are averaged CDF needs to be presented. This will probably be the together to obtain the total plant average of the original two values. For the uncertainty CDF/LERF.

analysis, Farley needs to document what is covered by the analysis, Train A results, Train B results or both.

I I Rev Oki Page V-25

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-1 Fire PRA Peer Review - Facts and Observations SR Topic Status Finding/Observation Disposition Farley did run an uncertainty case using 10,000 samples and the results seemed to be better behaved.

Farley is running an uncertainty case with 50,000 samples which is consistent with their FPIE PRA process. The results of this analysis should be presented in Appendix D in the Summary Report instead of the current analysis.

UNC-Al The Farley Closed Farley did quantify the fire-related LERF for Unit 1 but The Farley Summary report has documentation did not failed to meet the requirements from LE-F2 and LE-F3 been updated to reflect the insights adequately address the from Section 2 which require that "REVIEW contributors by reviewing the top contributors for review of LERF for reasonableness (e.g., to assure excessive LERF. This describes the fire scenarios in the conservatisms have not skewed the results, level of induced impacts as well as the analysis to show that plant-specificity is appropriate for significant random failures. The resolution of the appropriate reviews contributors, etc.)" and "IDENTIFY and characterize the this finding is found in Appendix C had been completed.

LERF sources of model uncertainty and related of PRA-BC-F-1 1-017.

assumptions in a manner consistent with the applicable requirements of Tables 2-2.7-2(d) and 2-2.7-2(e)." As discussed in F&O FQ-D1-01, the calculated LERF and CCFP indicate that there some potential issues with the LERF calculation.

See F&O FQ-D1-01 (F) and perform the reasonableness reviews after requantifying I I Rev Okj Page V-26 I Rev Oki Page V-26

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-2 Fire PRA-Category I Summary1 SR Capability Topic Status Category FSS-Cl CC-I

[FSS-C1-01]

Two-point fire intensity model that encompass low likelihood, but potentially The development of fire scenarios for the risk contributing, fire events were not used in all cases. Fire scenarios were Farley Fire PRA did not identify any instances done with ignition sources characterized with one fire intensity, where further analysis resolution would be gained by the treatment as inferred by the To reach Capability Category II, use a two-point intensity model for all ignition requirements for CC II and CC I1l. The sources.

implications of retaining the CC I treatment in lieu of refining as described for CC II or CC III Utility Comment: The development of fire scenarios for the Farley Fire PRA is potentially a higher calculated CDF did not identify any instances where further analysis resolution would be contribution. The CC I treatment inherently will gained by the treatment as inferred by the requirements for CC II and CC I11.

not result in under-estimation of fire risk. As The implications of retaining the CC I treatment in lieu of refining as such, the current treatment is conservative.

described for CC II or CC III is potentially a higher calculated CDF Provided this treatment does not result in contribution. The CC I treatment inherently will not result in under-estimation masking of risk increases in future applications, of fire risk. As such, the current treatment is conservative. Provided this further refinements are not considered treatment does not result in masking of risk increases in future applications, necessary.

further refinements are not considered necessary.

Response: The SR stipulates that a two-point model is required for CC-Il.

As you stated in your comment, Farley feels that the one-point model is conservative and justified. This would be viewed as the proposed resolution, but the F&O stands.

FSS-C2 CC-I

[FSS-C2-01]

Ignition source intensity were characterized such that fire is initiated at full The only readily available reference for a time peak intensity and ignition sources that are significant contributors to fire risk dependent growth rate that could be were not characterized using a realistic time-dependent fire growth profile.

considered in the analysis is 12 minutes as Generic methods from the Hughes Associates Generic Fire Modeling recommended in NUREG/CR-6850. The Treatments were used to characterize ignition source intensity. These treatment would involve a t2 growth rate. If a generic methods did not incorporate fire growth curves.

particular source/target interaction has a spacing where the target is at the critical Characterize ignition sources that are significant contributors to fire risk using damage spacing threshold, such a treatment a realistic time-dependent fire growth profile.

may provide some benefit as successful suppression with that time period would Utility Comment: The only readily available reference for a time dependent prevent target damage. However, if the target I I Rev OIq Page V-27 I Rev Oki Page V-27

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-2 Fire PRA-Category I Summary1 SR Capability Topic Status Category growth rate that could be considered in the analysis is 12 minutes as is located well within the calculated damage recommended in NUREG/CR-6850. The treatment would involve a t2 growth distance, the corresponding time to reaching rate. If a particular source/target interaction has a spacing where the target is the damage threshold is very short and at the critical damage spacing threshold, such a treatment may provide some effectively precludes any meaningful credit for benefit as successful suppression with that time period would prevent target suppression. In the case of the Farley Fire damage. However, if the target is located well within the calculated damage PRA, the majority of the target spacing for the distance, the corresponding time to reaching the damage threshold is very dominant risk contributors is such that no short and effectively precludes any meaningful credit for suppression. In the meaningful credit for suppression is available.

case of the Farley Fire PRA, the majority of the target spacing for the In other dominant risk contributors, the dominant risk contributors is such that no meaningful credit for suppression is scenario involves high energy arcing fault available. In other dominant risk contributors, the scenario involves high (HEAF) events were no growth time is energy arcing fault (HEAF) events were no growth time is applicable. The applicable. The implications of retaining the implications of retaining the CC I treatment in lieu of refining as described for CC I treatment in lieu of refining as described CC Il/111 is potentially a slightly higher calculated CDF contribution. The CC I for CC Il/111 is potentially a slightly higher treatment inherently will not result in under-estimation of fire risk. As such, calculated CDF contribution. The CC I the current treatment is conservative. Provided this treatment does not result treatment inherently will not result in under-in masking of risk increases in future applications, further refinements are not estimation of fire risk. As such, the current considered necessary.

treatment is conservative. Provided this treatment does not result in masking of risk Response: The Farley modeling was found to be consistent with CC-I but increases in future applications, further did not meet the requirements of CC-Il. The comment provides the basis for refinements are not considered necessary.

stating that the existing treatment is adequate. It does not provide evidence that a time-dependent heat release rate model was used.

FSS-E3 CC-I

[FSS-E3-01]

Supporting requirement E3 asks to provide a mean value of, and statistical The documentation has been updated to representation of, the uncertainty intervals for the parameters used for fire include discussions related to the uncertainty modeling the fire scenarios. Farley performed fire size and heat release rate for fire modeling. See Table D-1 of the Farley selection in accordance with NUREG/CR-6850 and/or applicable FAQs.

Fire PRA Summary report, PRA-BC-F-1 1-017.

However, the methods for developing the statistical representation of the uncertainty intervals and mean values currently do not exist. However, this is The associated SR was dispositioned as CC I not reported in the documentation.

which is judged to be sufficient given the two concerns noted.

In the documentation, explain that it is understood that methods for developing the statistical representation of the uncertainty intervals and mean I I Rev Okj Page V-28 I Rev Oki Page V-28

Southern Nuclear Operating Company Attachment V - Fire PRA Quality Table V-2 Fire PRA-Category I Summary1 SR Capability Topic Status Category values currently do not exist.

Utility Comment: This specific F&O was issued against a technical element and the indicated resolution involves a documentation clarification. This documentation clarification will be implemented.

1 _ All Fire PRAs SRs characterized as Capability Category I were identified as Findings in the Peer Review.

I Rev Okj Page V-29 I

I Rev Oki Page V-29