NL-12-113, Submittal of Revision 14 to Physical Security, Training and Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program

From kanterella
Jump to navigation Jump to search
Submittal of Revision 14 to Physical Security, Training and Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program
ML12222A210
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/07/2012
From: Ventosa J
Entergy Operations, Indian Point
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
NL-12-113
Download: ML12222A210 (2)


Text

Indian Point Energy Center 450 Broadway, GSB vmýEnteigy P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 254-6700 J. A. Ventosa Site Vice President SAFEGUARDS INFORMATION NL-12-113 August 7, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852

SUBJECT:

Submittal of Revision 14 to "PHYSICAL SECURITY, TRAINING AND QUALIFICATION, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM" Indian Point Unit Nos. 1, 2, and 3 Docket Nos. 50-03, 50-247, and 50-286 License Nos. DPR-5, DPR-26 and DPR-64

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. (Entergy) has revised the IPEC "Physical Security, Training and Qualification, Safeguards Contingency Plan, And Independent Spent Fuel Storage Installation Security Program" to reflect ongoing changes. This revision is included in the Enclosure. The Attachment contains a description of the changes in the required format.

The changes were evaluated pursuant to 10 CFR 50.54(p)(2) and do not decrease the safeguards effectiveness of the plan.

This letter includes no new commitments. If you have any questions, or require additional information, please contact Mr. Robert Walpole, Manager, Licensing at (914) 254-6710.

Sincerely, JAV/sp cc next page SAFEGUARDS INFORMATION Attachment 1 and Enclosure 1 contain Safeguards Information. When separated from Attachment 1 and Enclosure 1 this letter is not Safeguards.

Sc~(

NL-12-108 Docket Nos. 50-03, 50-247, and 50-286 Page 2 of 2 SAFEGUARDS INFORMATION Attachment

SUMMARY

OF CHANGES TO "PHYSICAL SECURITY, TRAINING AND QUALIFICATION, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM" Enclosure Revision 14 to IPEC "PHYSICAL SECURITY, TRAINING AND QUALIFICATION, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM" cc: Mr. William Dean, Regional Administrator, NRC Region I w / Attachment and Enclosure Mr. Douglas Pickett, Senior Project Manager, NRC, NRR, DORL w / o Attachment or Enclosure Mr. E. Leeds, Director, NRC, NRR w / o Attachment or Enclosure Mr. Stephen Giebel, NRC, FSME, DURLD w / o Attachment or Enclosure Resident Inspector's Office w / Attachment and Enclosure Ms. Bridget Frymire, NYS Dept. of Public Service w / o Attachment or Enclosure Mr. Francis J. Murray, Jr., President and CEO, NYSERDA w /o Attachment or Enclosure SAFEGUARDS INFORMATION Attachment 1 and Enclosure 1 contain Safeguards Information. When separated from Attachment 1 and Enclosure 1 this letter is not Safeguards.