MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021 Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use NL-19-090, Registration of Unit 2 Spent Fuel Cask Use2019-10-0909 October 2019 Registration of Unit 2 Spent Fuel Cask Use NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments2019-09-26026 September 2019 50.59(d)(2) Summary Report of Changes, Tests and Experiments 2021-05-06
[Table view] |
Text
Enteray Nuclear Northeast Indian Point Energy Center 295 Broadway, Suite 1 ntel En lv OJBuchanan, P.O. Box 249NY 10511-0249 Fred Dacimo Site Vice President Tel 914 734 6700 January 17, 2005 Re: Indian Point Units 2 Docket No. 50-247 NL-05-001 Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-PI-17 Washington, DC 20555-0001
Subject:
Reactor Vessel Upper Head Inspection Results; Indian Point 2. Fall 2004 Refueling Outage (2R16)
Reference:
- 1) NRC Order EA-03-009, "Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors",
dated February 20, 2004
- 2) Entergy letter to NRC dated March 11, 2004 (NL-04-026); 'Answer To February 20, 2004 Revised NRC Order Regarding Interim Inspection Requirements for Reactor Pressure Vessel Heads"
- 3) NRC letter to Entergy, "Relaxation of First Revised Order on Reactor Vessel Nozzles, Indian Point Nuclear Generating Unit No. 2 (TAC No. MC3194)", dated October 15, 2004
Dear Sir:
This letter provides the Reactor Vessel Upper Head Inspection Report (Attachment 1) for Indian Point 2 (1P2), in accordance with Section IV.E of NRC First Revised Order, EA-03-009 (Reference 1). The inspection was performed during refueling outage 2R16 that was completed on November 22, 2004.
The inspection consisted of the bare metal visual examination of no less than 95 percent of the Reactor Pressure Vessel (RPV) head surface and 360 degrees around each RPV head penetration nozzle, consistent with the requirements of Section IV.C.(5)(a) of the Order, based on the Moderate Category as defined in section IV.B of the Order. Entergy Nuclear Operations, Inc (ENO) consent to the Order (Reference 2) indicated that IP2 would perform the next (2R16)
M10l
NL-05-001 Docket 50-247 Page 2 of 3 scheduled inspection in accordance with the requirements of the Order and approved relaxations. A subsequent relaxation request was authorized by the NRC to implement an alternative to the requirements of Section IV.C.(5)(a) (Reference 3).
Based on the results of this inspection, ENO concludes that there are no indications of reactor pressure vessel upper head degradation, or primary reactor coolant boundary leakage at the control rod drive mechanism penetrations.
No new commitments are being made in this letter. If you have any questions, please contact Mr. Patric W. Conroy, Manager, Licensing at (914) 734-6668.
Very truly yours, R.Dacimo Site Vice President Indian Point Energy Center (Reactor Vessel Upper Head Inspection Results; Indian Point 2, Fall 2004 Refueling Outage (2R16))
cc: see next page
NL-05-001 Docket 50-247 Page 3 of 3 cc: Mr. Patrick D. Milano, Senior Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail Stop 0 8 C2 Washington, DC 20555-0001 Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Resident Inspector's Office Indian Point Unit 2 Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511-0059 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-6399
ATTACHMENT 1 TO NL-05-001 REACTOR VESSEL UPPER HEAD INSPECTION RESULTS; INDIAN POINT 2, FALL 2004 REFUELING OUTAGE (2R16)
ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247
Attachment 1 to NL-05-001 Docket No. 50-247 Page 1 of 2 Introduction Entergy Nuclear Operations, Inc (ENO) performed an inspection of the Indian Point 2 (IP2) reactor pressure vessel (RPV) head and vessel head penetration (VHP) nozzles in November 2004. The inspection complied with NRC Revised Order EA-03-009 (Reference 1), as committed in Reference 2, and with NRC authorized inspection alternative to Section IV.C.(5)(a)
(Reference 3).
The results of the prior inspection, performed in November, 2002 during 2R1 5 were reported in Reference 4. Based on the EDY (effective degradation years) methodology and criteria stated in Sections IV.A and IV.B of the Order, ENO determined that the IP2 head was in the moderate susceptibility category for the inspection conducted in 2R1 6.Section IV.C.(2) of the Order specifies an inspection based on either bare metal visual (BMV) examination of the RPV head surface or non-visual NDE examination techniques applied to the vessel head penetration nozzles. The inspection performed at IP2 consisted of bare metal visual examination of no less than 95% of the RPV head surface and 360 degrees around each RPV head penetration nozzle, consistent with the alternative examination option specified in Section IV.C.(5)(a) and further authorized by the NRC (Reference 3).
Based on this inspection, ENO concludes that there are no signs of reactor pressure vessel head degradation. Additional details regarding the inspection are provided in the following sections.
Bare Metal Visual (BMV) Examinations The BMV examination included no less than 95 percent of the entire RPV head surface (including 3600 around each RPV head penetration nozzle), consistent with MRP and EPRI guidance provided in References 5 and 6. The BMV examination also included those areas of the RPV head upslope and downslope from the reflective metal insulation (RMI) support ring to identify any evidence of boron or corrosive product. Various types of inspection equipment were used to achieve this requirement (i.e., video probes, remote operated vehicle, and direct examination) depending on the accessibility of each location.
Remnants of insulation debris from the removal effort in 2R15 were identified on the RPV head mostly around the outer perimeter nozzles. The debris was removed to the extent possible and a post-cleaning examination was performed with no evidence of any active leakage from any of the penetrations or evidence of bare metal degradation.
Boron residue was identified on top of the RPV head adjacent to several penetrations and at one location outside the RMI support ring. This was determined to be from leaks associated with Conoseal and Canopy Seals above the insulation system that occurred during the cycle in addition to residual boron from a previous Canopy Seal leak (penetration #86) that was repaired at the end of 2R15. Loose deposits of boric acid on the RPV surface from these leaks were cleaned as part of the examination process including from under the RMI support ring, with no evidence of any active leakage from any penetrations or evidence of bare metal degradation.
The new Conoseal and Canopy Seal leaks were identified and repaired in 2R16. The Conoseal leak at #91 was repaired by cleaning the flanged surface and replacing the gasket, and the
Attachment 1 to NL-05-001 Docket No. 50-247 Page 2 of 2 Canopy Seal leaks on Canopy Seal welds #2 and #17 were repaired by installation of Canopy Seal clamps. The top of the insulation was vacuumed to remove loose boron deposits.
Personnel Qualification The inspection results were reviewed by certified Level II or Level IlIl VT-2 personnel, meeting the requirements of ASME Section Xl. The examiners also received familiarization pre-job training using photographs of industry examination results from References 5 and 6, and from inspection tapes of the IP2 BMV examination in Fall, 2002.
Corrective Actions and Root Cause Determination Based on the results of the BMV examinations there were no indications of degradation of the VHPs or wastage of the vessel head base metal surface. Therefore, no corrective actions or root cause determinations were deemed necessary.
Upon completion of the BMV examinations, debris on the reactor vessel head, and boric acid deposits from the previously described leaks were removed. The source of these mechanical joint and seal weld leaks were repaired in 2R16 and verified leak tight during inservice pressure inspection.
In 2R17, IP2 is expected to remain in the moderate susceptibility category and as such, expects to perform a vessel head inspection in accordance with the requirements of Section IV.C.(5)(b) of the Order and the relaxation request described in Reference 3.
References
- 1. NRC Order EA-03-009, Issuance of First Revised NRC Order (EA 009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors", dated February 20, 2004
- 2. Entergy letter to NRC dated March 11, 2004 (NL-04-026); "Answer to February 20, 2004 Revised NRC Order Regarding Interim Inspection Requirements for Reactor Pressure Vessel Heads'
- 3. NRC letter to Entergy, "Relaxation of First Revised Order on Reactor Vessel Nozzles, Indian Point Nuclear Generating Unit No. 2 (TAC No. MC3194)", dated October 15, 2004
- 4. Entergy letter to NRC dated December 18, 2002 (NL-02-162) "Reactor Vessel Head Inspection Results; Indian Point 2, Fall 2002 Refueling Outage"
- 5. MRP-75, PWR Reactor Pressure Vessel Upper Head Penetrations Inspection Plan, Revision 1 (EPRI 1007337)
- 6. EPRI Report 1006296, Rev. 2; "Visual Examination for Leakage of PWR Reactor Head Penetrations", March 2003