ND-21-0085, Construction Activities Schedule Six-Month Update for Completion of the Inspections, Tests, and Analyses (ITA)

From kanterella
Jump to navigation Jump to search
Construction Activities Schedule Six-Month Update for Completion of the Inspections, Tests, and Analyses (ITA)
ML21039A707
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/08/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21039A706 List:
References
ND-21-0085
Download: ML21039A707 (4)


Text

Southern Nuclear Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtie3&4 706-848-6459 tei February 8, 2021 ND-21-0085 10 CFR 52.99(a)

Docket Nos.: 52-026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 Construction Activities Schedule Six-Month Update for Completion of the Inspections, Tests, and Analyses(ITA)

Ladies and Gentlemen; In accordance with 10 CFR 52.99(a), Southern Nuclear Operating Company (SNC), as a Combined License (COL) holder under 10 CFR 52, hereby submits the six-month update for completion of the Inspections, Tests, Analyses (ITA) in the Nuclear Regulatory Commission (NRC) approved Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Vogtle Electric Generating Plant(VEGP) Unit 4.

The enclosure to this submlttal contains the updated ITA completion schedule for VEGP Unit 4.

The ITA completion schedule is based on projected construction activities as of February 8, 2021.

As is typical with a construction project, the schedule information is dynamic in nature and subsequent schedule refinements will be reflected in forthcoming completion schedules.

The schedule information provided in the enclosure is considered confidential commercial information and exempt from mandatory public disclosure pursuant to the provisions of 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). Following the approach described in SECY-06-0114, no additional withholding determination is needed as the schedule information was demonstrated to be confidential commercial information based on the update provided to the NRC on October 6, 2017 Agencywide Documents Access and Management System (ADAMS) Accession Number ML17279A661. Accordingly, the enclosure should be withheld from public disclosure.

This letter contains no regulatory commitments.

Should you have questions regarding the enclosed information, please contact Tom Petrak at (706) 848-1575.

U. S. Nuclear Regulatory Commission ND-21-0085 Page 2 of 4 Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Michael J. Vox Regulatory Affairs Director Vogtle 3 & 4 MJY/RAS/sfr

Enclosure:

Vogtle Electric Generating Plant Unit 4- ITA Completion Schedule {Withhold from Public Disclosure}

U. S. Nuclear Regulatory Commission ND-21-0085 Page 3 of 4 go:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. 8. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. 8. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. 8. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Mr. K. Warren Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Reoulatorv Commission Ms. M. Bailey (w/o enclosures)

Mr. M. King (w/o enclosures)

Mr. H. K. Nieh Mr. C. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Mr. J. Eargle Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. 8. Rose Ms. K. McCurry Mr. B. Davis Mr. B. Gleaves State of Georgia Mr. R. Dunn (w/o enclosure)

U. S. Nuclear Regulatory Commission ND-21-0085 Page 4 of 4 Oqlethorpe Power Corporation Mr. M. W. Price (w/o enclosure)

Ms. A. Whaley (w/o enclosure)

Municipal Electric Authority of Georgia Mr. J. E. Fuller (w/o enclosure)

Mr. S. M. Jackson (w/o enclosure)

Dalton Utilities Mr. T. Bundros (w/o enclosure)

Westinqhouse Electric Company. LLC Mr. L. Oriani (w/o enclosures)

Mr. T. Rubenstein (w/o enclosures)

Mr. M. Corletti Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.(w/o enclosure)

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.(w/o enclosure)

Mr. S. Roetger, Georgia Public Service Commission (w/o enclosure)

Mr. R. L. Trokey, Georgia Public Service Commission (w/o enclosure)

Mr. K. C. Greene, Troutman Sanders(w/o enclosure)

Mr. S. Blanton, Balch Bingham