ND-20-0500, Unit 4 - ITAAC Closure Notification on Completion of ITAAC 3.3.00.05a (Index Number 784)

From kanterella
(Redirected from ND-20-0500)
Jump to navigation Jump to search
Unit 4 - ITAAC Closure Notification on Completion of ITAAC 3.3.00.05a (Index Number 784)
ML20148M265
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/21/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 3.3.00.05a, ND-20-0500
Download: ML20148M265 (6)


Text

^Southern Nuclear Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel m 2 I 2020 Docket Nos.: 52-025 52-026 ND-20-0500 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05a (Index Number 7841 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP)

Unit 3 and Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.05a [Index Number 784]. This ITAAC verified that a water barrier exists on the nuclear island exterior walls up to site grade. The closure process for this ITAAC is based on the guidance described in NEI-08-01,"Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52", which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company(SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 ITAAC Closure Notification on Completion of 3.3.00.05a [Index Number 784]

MJY/TST/sfr

U.S. Nuclear Regulatory Commission ND-20-0500 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Requlatorv Commission M . W. Jones(w/o enclosures)

M . C. P. Patel M . G. J. Khouri Ms. S. E. Temple M N. D. Karlovich M A. Lerch M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M V. Hall M G. Armstrong M M. Webb M T. Fredette M S. Smith M C. Santos M s. M. Bailey M . S. Rose M . B. Davis M . J. Vasquez M J. Eargle Ms. K. Carrington M . P. Heher M . M. King M E. Davidson

U.S. Nuclear Regulatory Commission ND-20-0500 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham

U.S. Nuclear Regulatory Commission ND-20-0500 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-0500 Enclosure Vogtle Electric Generating Riant(VEGP) Unit 3 and Unit 4 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05a [Index Number 784]

U.S. Nuclear Regulatory Commission ND-20-0500 Enclosure Page 2 of 3 ITAAC Statement Design Commitment:

5.a) Exterior walls and the basemat of the nuclear island have a water barrier up to site grade.

Inspections. Tests. Analvses:

An inspection of the as-built water barrier will be performed during construction.

Acceptance Criteria:

A report exists that confirms that a water barrier exists on the nuclear island exterior walls up to site grade.

ITAAC Determination Basis This ITAAC was performed to demonstrate that the exterior walls of the nuclear island have a water barrier up to site grade. This ITAAC required that inspections were performed during construction of the as-built nuclear island water barrier to ensure that the exterior walls of the nuclear island have a water barrier installed up to site grade.

Multiple inspections of the as-built water barrier were performed during construction following placement of the water barrier on the basemat and exterior walls up to site grade prior to concealment (e.g., concrete placements or backfill). These inspections were performed by qualified Quality Control(QC) personnel and documented in multiple inspection reports. The inspections documented that the water barrier was installed in accordance with SV0-AT01-Z0-800001 (Reference 2). The QC inspection records are contained in the records for the installation Work Qrder Packages. Areas that failed in-process inspections (including damage) were identified in the associated inspection record. For failures, a Non-Conformance Report was initiated and dispositioned. When additional field work was required to address a nonconforming condition, a follow-up QC inspection was performed.

A summary of the inspection records was completed and is documented in ITAAC Technical Report(ITR) SVO-1000-ITR-800784-Rev0 (reference 3). The ITR involved a review of the Work Qrder Packages, QC Inspection Records, Non-Conformance Reports, and other supporting documents related to the nuclear island water barrier installation on both units. The ITR concluded that a water barrier exists on the nuclear island exterior walls up to site grade on Unit 3 and Unit 4.

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Qperating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.05a was performed for VEGP Unit 3 and Unit 4 and that the prescribed acceptance criteria are met.

U.S. Nuclear Regulatory Commission ND-20-0500 Enclosure Page 3 of 3 Systems,structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRG inspection)

1. NEI 08-01, Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52
2. Specification SV0-AT01-Z0-800001 Rev. 5,"Nuclear Island Waterproofing Membrane Installation"
3. SV0-1000-ITR-800784-Rev0,"Units 3&4 Inspection of Water Barrier on the Nuclear Island Exterior Wall up to Site Grade: ITAAC 3.3.00.05a"
4. 3.3.00.05a-U0-CP-Rev0, ITAAC Completion Package