Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.3.00.10.1 (Index Number 815)
ML19283A254
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/09/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-19-1130
Download: ML19283A254 (6)


Text

A Michael J. Yox 7825 River Road k QrM it'h/aii'n Ml Regulatory Affairs Director Waynesboro, GA 30830 jOUinern iNUCi6dr vogue3&4 7068435459 tei OCT 0 9 2019 Docket Nos.: 52-025 52-026 ND-19-1130 10 CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.3.00.10.1 (Index Number 815]

Ladies and Gentlemen; Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of September 25, 2019, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.10.1

[Index Number 815] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed.

All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted,

(

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 3.3.00.10.1 [Index Number 815]

MJY/CWM/sfr

U.S. Nuclear Regulatory Commission ND-19-1130 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKlnney (w/o enclosures)

Mr. M. D. Meier(w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE; VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Mr. W. Jones (w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. S. Smith Qqiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authoritv of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

U.S. Nuclear Regulatory Commission ND-19-1130 Page 3 of 3 Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-19-1130 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-1130 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 3.3.00.10.1 [Index Number 815]

U.S. Nuclear Regulatory Commission ND-19-1130 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

10. The shield building roof and PCS storage tank support and retain the PCS water sources.

The PCS storage tank has a stainless steel liner which provides a barrier on the inside surfaces of the tank. Leak chase channels are provided on the tank boundary liner welds.

Insoections/Tests/Analvses i) A test will be performed to measure the leakage from the PCS storage tank based on measuring the water flow out of the leak chase collection system.

Acceptance Criteria i) A report exists and concludes that total water flow from the leak chase collection system does not exceed 10 gal/hr.

ITAAC Completion Description Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-PCS-ITPP-502 and 4-PCS-ITPP-502 (References 1 and 2)to verify that total water flow from the leak chase collection system does not exceed 10 gal/hr.

Initial level for the Passive Containment Cooling Water Storage Tank(PCCWST)is established between 96.1% and 96.8%. Initial condition in the Leak Chase Collection Pot(PCS-MT06) establishes a level in the range of the level instrument. A trend graph is started to track the flow into the pot to track the level change and the time for the level change to occur. A calculation is performed to determine the flowrate into PCS-MT06 using the change in level and elapsed time.

The result of the testing shows that the leakage from the PCS storage tank into Unit 3 Leak Chase Collection Pot is X gal/hr and the leakage into the Unit 4 Leak Chase Collection Pot is Y gal/hr. This testing concludes that total water flow from the leak chase collection system does not exceed 10 gal/hr.

References 1 and 2 are available for NRC inspection as part of Unit 3 and Unit 4 ITAAC Completion Packages (Reference 3 and 4).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

U.S. Nuclear Regulatory Commission ND-19-1130 Enclosure Page 3 of 3 References(available for NRG inspection)

1. 3-PCS-ITPP-502,"Passive Containment Cooling System PCCWST Preoperatlonal Test Procedure"
2. 4-PCS-ITPP-502,"Passive Containment Cooling System PCCWST Preoperatlonal Test Procedure"
3. 3.3.00.10.I-U3-CP-Rev 0,"ITAAC Completion Package"
4. 3.3.00.10.l-U4-CP-Rev 0,"ITAAC Completion Package"
5. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"