ND-19-0190, Unit 4 Notice of Uncompleted ITAAC 225-Days Prior to Initial Fuel Load Item 2.3.14.04 (Index Number 480)

From kanterella
Jump to navigation Jump to search
Unit 4 Notice of Uncompleted ITAAC 225-Days Prior to Initial Fuel Load Item 2.3.14.04 (Index Number 480)
ML19053A743
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/22/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ITAAC 2.3.14.04, ND-19-0190
Download: ML19053A743 (6)


Text

Michael J. Yox 7825 River Road

^Southern Nuclear Regulatory Affairs Director Vogtle 3& 4 Waynesboro, GA 30830 706-848-6459 tel FEB 2 2 2019 Docket Nos.: 52-025 52-026 ND-19-0190 10CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.3.14.04 fIndex Number 4801 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of February 21, 2019, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.14.04 [Index Number 480] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.14.04 [Index Number 480]

MJY/LBP/sfr

U.S. Nuclear Regulatory Commission ND-19-0190 Page 2of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost(w/o enclosures)

Mr. D. L. McKinney(w/o enclosures)

Mr. M. D. Meier(w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. J. B. Klecha Mr. G. Chick Mr. M. J. Vox Mr. A. 8. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. W. A. Sparkman Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Mr. W.Jones(w/o enclosures)

Mr. F. D. Brown Ms. J. M. Heisserer Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. I. Cozens Mr. J. Gaslevic Mr. V. Hall Qqiethoroe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipai Eiectric Authoritv of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Daiton Utilities Mr. T. Bundros

U.S. Nuclear Regulatory Commission ND-19-0190 Page 3 of 3 Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Ms. J. Monahan Mr. J. L. Coward Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Sen/Ice Commission Ms. 8. W. Kernizan, Georgia Public Sen/Ice Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Batch BIngham

U.S. Nuclear Regulatory Commission ND-19-0190 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-0190 Enclosure Vogtle Electric Generating Plant(VEGP)Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.14.04[Index Number 480]

U.S. Nuclear Regulatory Commission ND-19-0190 Enclosure Page 2 of 3 ITAAC Statement Desion Commitment

4. Displays of the parameters identified in Table 2.3.14-1 can be retrieved in the MCR.

Inspections. Tests. Analvses Inspection will be performed for retrievability of parameters in the MCR.

Acceptance Criteria The displays identified in Table 2.3.14-1 can be retrieved in the MCR.

ITAAC Completion Description An inspection is performed to verify the retrievability of the Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 plant parameters in the Main Control Room (MCR). The inspection for retrievability confirms that the displays of the parameters identified in COL Appendix C Table 2.3.14-1 (Attachment A)can be retrieved in the MCR.

The inspection is performed in accordance with the Unit 3 and Unit 4 component test package work orders(References 1 and 2, respectively) for Demineralized Water Transfer and Storage System (DWS)component indication verifications, and visually confirms that when each of the displays of parameters identified in Attachment A is summoned at an MCR workstation, the summoned plant parameter appears on a display monitor at that MCR workstation.

The Unit 3 and Unit 4 component test results(References 1 and 2, respectively) confirm that the VEGP Unit 3 and Unit 4 plant parameter displays listed in Attachment A can be retrieved in the MCR.

References 1 and 2 are available for NRC inspection as part of the Unit 3 and Unit 4 ITAAC 2.3.14.04 Completion Packages(References 3 and 4, respectively).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant findings associated with the ITAAC.

References favailable for NRC inspection)

1. SNCXXXXXX,"DWS Parameters Displays in MCR - ITAAC:SV3-2.3.14.04"
2. SNCXXXXXX,"DWS Parameters Displays in MCR - ITAAC:SV4-2.3.14.04"
3. 2.3.14.04-U3-CP-Rev 0, ITAAC Completion Package
4. 2.3.14.04-U4-CP-Rev 0, ITAAC Completion Package
5. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"

U.S. Nuclear Regulatory Commission ND-19-0190 Enclosure Page 3of 3 Attachment A Excerpt from COL Appendix C Table 2.3.14-1 Table 2.3.14-1 Equipment Name Tag No. Display Condensate Storage Tank Water Level DWS-006 Yes